FY07-09 proposal 200301200
Jump to Reviews and Recommendations
Section 1. Administrative
Proposal title | Shillapoo Wildlife Area |
Proposal ID | 200301200 |
Organization | Washington Department of Fish and Wildlife (WDFW) |
Short description | The Shillapoo Wildlife Area's principal purpose is to provide high quality habitat for migrating and wintering sandhill cranes, waterfowl and several other key species as mitigation for losses associated with Bonneville, John Day and The Dalles dams. |
Information transfer | Information derived from this project will be used to improve wildlife/habitat management techniques on mitigation and non-mitigation wildlife areas and will be provided to CBFWA project managers and other interested parties either electronically or in hard copy reports. |
Proposal contact person or principal investigator |
Contacts
Contact | Organization | |
---|---|---|
Form submitter | ||
Brian M. Calkins | Washington Department of Fish & Wildlife | calkibc@dfw.wa.gov |
All assigned contacts | ||
Brian M. Calkins | Washington Department of Fish & Wildlife | calkibc@dfw.wa.gov |
Paul Dahmer | WDFW | dahmepad@dfw.wa.gov |
Section 2. Locations
Province / subbasin: Lower Columbia / Columbia Lower
Latitude | Longitude | Waterbody | Description |
---|---|---|---|
[none] | Approximate center of Shillapoo Wildlife Area's North Unit. | ||
[none] | Approximate center of Shillapoo Wildlife Area's South Unit. | ||
[none] | Approximate center of Shillapoo Wildlife Area's Vancouver Lake Unit. |
Section 3. Focal species
primary: All WildlifeAdditional: Sandhill crane, Canada geese, Dabbling duck (mallard), Yellow warbler, Mink, Diving ducks, Black capped chickadee, Great blue heron, Western meadowlark
Section 4. Past accomplishments
Year | Accomplishments |
---|---|
2005 | Design for remaining Shillapoo lake enhancement and North basin enhancement completed by USACOE and Ducks Unlimited. Oak habitat plantings (10 acres). All significant waterfowl pasture forage sites mowed and in a usable condition. |
2004 | Water supply for Vancouver Lake Unit Wetlands completed. Wetland project at the south end of Shillapoo lakebed was partially completed. Design and permits will have to be modified to accommodate an existing easement in order to complete. |
2003 | Old fencing removed at several locations. Marked volunteer trees along Lake River to avoid mowing them, thus reducing future planting costs. Positive vegetative changes noted in some managed wetlands. Continued applying for permits fo wetland projects. |
2002 | Project went through provincial review process. A substantial amount of old flood debris was encounterd and removed from the newest properties during pasture mowing. Bio control for purple loosestife released on Vancouver Lake Unit. |
2001 | Purchased 210 acres including the east-central portion of the Shillapoo Lakebed. |
2000 | Limitations of pump station built in '99 became evident. |
1999 | DU completed construction of features to manage over 200 acres of wetland basins on the North and Vancouver Lake units. Columbia Land Trust receives NAWCA grant including funds to enhance 80 acre wetland basin in the North unit. |
1998 | Purchased 612 acres including the north end of Shillapoo Lakebed (39% state and 61% BPA funds). USACOE completes analysis pertinent to hydrology of Shillapoo Lakebed. DU receives NAWCA and WRP grants for 150 acre wetland project in Shillapoo Lakebed. |
1997 | Bonneville Power begins funding basic O&M activities for the Shillapoo Wildlife Area. Cultural Resource survey completed by BOAS inc. |
1996 | Major flood event put the entire wildlife area underwater. Much of this year spent on subsequent repairs and cleanup. Substantial and positive short-term vegetative changes noted in wetland areas atributed to the extended inundation. |
1995 | Completed HEP study and report. Ducks Unlimited receives NAWCA grant that includes funding for wetland enhancements on the South and Vancouver Lake Units. |
1994 | Purchased 60-acre parcel in the center of the Shillapoo Lakebed (state and Ducks Unlimited funds). Initial planting of 5-acre oak habitat plot. |
1993 | First wildlife area manager for the site hired. |
1992 | Site managed by regional office staff. |
1991 | Interim Management Plan completed. Purchased three properties (1,042 acres) including the southern end of the Shillapoo Lakebed. |
Section 5. Relationships to other projects
Funding source | Related ID | Related title | Relationship |
---|---|---|---|
BPA | 199107800 | Burlington Bottoms Wildlife Mitigation | Compliments wetland, riparian and upland management goals |
BPA | 199902500 | Sandy River Delta Habitat | Complimentary wetland and riparian goals |
BPA | 200001600 | Tualatin River National Wildli | Complimentary wetland habitat and species goals. |
Other: USFWS | [no entry] | Ridgefield NWR | Very similar and complimentary goals and projects on a National Wildlife Refuge that is almost adjacent to the wildlife area. |
Other: State (Oregon) | [no entry] | Sauvie Island Wildlife Area | Very similar and complimentary goals and projects on an Oregon State Wildlife Area that is directly across the Columbia River from the Shillapoo Wildlife Area. |
Other: USFWS/USACOE | [no entry] | Steigerwald National Wildlife Refuge | Mitigation site for Bonneville Dam Second Powerhouse compliments wetland and wildlife objectives of the Shillapoo Wildlife Area |
Section 6. Biological objectives
Biological objectives | Full description | Associated subbasin plan | Strategy |
---|---|---|---|
Control weeds | Reduce the levels of noxious weeds and other undesirable plants that limit habitat quality. | Lower Columbia | Strategy 4 (Slow introductions of non-native species.) |
Improve waterfowl habitat and wetlands | Improve and protect wintering waterfowl habitat, with an emphasis on wetland restoration and management, throughout the Shillapoo Wildlife Area. | Lower Columbia | Strategy 1,2 and 4 (Reduce hydrosystem effects, protect and restore habitat and slow introduction of non-native species.) |
Manage public use | Manage appropriate public use and recreation in a manner, which minimizes impacts to wildlife habitat and other sensitive resources. | Lower Columbia | Strategy 2 (Protect and restore habitat) |
Restore native habitat | Maintain, improve and restore desired habitats in specific areas including herbaceous, scrub shrub and forested wetlands, riparian forest, oak and grass/shrub habitat for multiple species benefits. | Lower Columbia | Strategy 2&4 (Protect and restore habitat, and slow introductions of non-native species.) |
Section 7. Work elements (coming back to this)
Work element name | Work element title | Description | Start date | End date | Est budget |
---|---|---|---|---|---|
Create, Restore, and/or Enhance Wetland | Install Water Control Structures (Shillapoo Lakebed) | Create three wetland management cells within the Shillapoo Lakebed totalling approximately 600 acres. These enhancements are in cooperation with the US Army Corps of Engineers, Ducks Unlimited and the Natural Resources Conservation Service. | 10/1/2006 | 9/30/2009 | $4,000 |
Biological objectives Improve waterfowl habitat and wetlands |
Metrics * # of acres treated: 600 acres |
||||
Create, Restore, and/or Enhance Wetland | North Basin Enhancement | Install ditch plugs and low levee to reesetablish wetland hydrology in an 80 acre wetland basin. This enhancement is in cooperation with Ducks Unlimited. | 10/1/2006 | 9/30/2007 | $2,000 |
Biological objectives Improve waterfowl habitat and wetlands Restore native habitat |
Metrics * # of acres treated: 80 acres |
||||
Remove vegetation | Riparian Enhancement Site Prep (Blackberry Removal) | Remove Himalayan blackberry and other exotic or undesireable vegetation in areas scheduled for riparian vegetation plantings. Includes areas along Lake River and sloughs within the wildlife area | 10/1/2006 | 9/30/2009 | $27,000 |
Biological objectives Control weeds Restore native habitat |
Metrics * # of acres treated: 113 acres |
||||
Install Fence | Riparian and Wetland Fencing | Install fencing as necessary to protect riparian plantings and wetland vegetation or to facilitate the use of grazing as a tool to help manage undesireable vegetation in enhancement sites. | 10/1/2006 | 9/30/2009 | $60,000 |
Biological objectives Improve waterfowl habitat and wetlands Restore native habitat |
Metrics * # of miles of fence: 3 miles |
||||
Plant Vegetation | Plant Native Trees and Shrubs in Oak and Great Blue Heron Nesting Habitat | Plant native trees and shrubs in two existing oak habitat sites (10-acres) in the South Unit and a third (20 acre) new site on the North Unit. Also plant 500 cottonwood trees per year in the South Unit former heron colony to rehabilitate it as a potential site for future nesting. | 10/1/2006 | 9/30/2009 | $25,500 |
Biological objectives Restore native habitat |
Metrics * # of acres of planted: 70 acres |
||||
Plant Vegetation | Riparian plantings | Plant trees and shrubs in riparian zones | 10/1/2006 | 9/30/2009 | $55,000 |
Biological objectives Restore native habitat |
Metrics * # of acres of planted: 108 acres * # of riparian miles treated: 4 miles |
||||
Maintain Vegetation | Maintain Planted Trees and Shrubs | Control weeds and competing vegetation, place tree mats and tubes as needed | 10/1/2006 | 9/30/2009 | $39,000 |
Biological objectives Control weeds Restore native habitat |
Metrics |
||||
Remove vegetation | Remove Vegetation (Moist Soil Management Practices) | Disking to control reed canary grass or other measures | 10/1/2006 | 9/30/2009 | $30,000 |
Biological objectives Control weeds Improve waterfowl habitat and wetlands Restore native habitat |
Metrics * # of acres treated: 50 to 100 acres per year |
||||
Operate and Maintain Habitat/Passage | Operate Wetland Management Facilities and Structures (Including Pumps) and Repair as Needed | Manage water levels in individual wetland basins to favor the reestablishment and/or maintenance of beneficial native wetland species. | 10/1/2006 | 9/30/2009 | $78,000 |
Biological objectives Improve waterfowl habitat and wetlands |
Metrics |
||||
Maintain Vegetation | Maintain Vegetation (Upland Goose Forage) | Annually mow up to 400 acres, fertilize 200 acres, plant 50 acres of understory crops and 100 acres of fall grain, and over seed or replant 50 acres of pasture. | 10/1/2006 | 9/30/2009 | $105,000 |
Biological objectives Improve waterfowl habitat and wetlands |
Metrics |
||||
Remove vegetation | Reduce Noxious Weeds and Other Undesirable Plants | Control Canada thistle, Himalayan blackberry, poison hemlock, and purple loosestrife. Monitor for and control other weeds as needed throughout the wildlife area. | 10/1/2006 | 9/30/2009 | $111,000 |
Biological objectives Control weeds Improve waterfowl habitat and wetlands Restore native habitat |
Metrics * # of acres treated: 50 acres annually (Himalayan blackberry) * # of acres treated: 200 acres annually (Canada thistle) * # of acres treated: 200 acres (Purple Loosestrife) |
||||
Operate and Maintain Habitat/Passage | Maintain, Repair or Replace Existing Fences as Needed for Management Purposes | Make minor repairs as needed. Replace fencing as needed that has deterioriated beyond the point of being repairable. | 10/1/2006 | 9/30/2009 | $34,000 |
Biological objectives Improve waterfowl habitat and wetlands Manage public use Restore native habitat |
Metrics |
||||
Improve/Relocate Road | Improve Interior Roads and Travel Routes in Support of Other Activities | Clear brush and limbs as needed and place rock in areas only when necessary to support enhancement and maintenance activities. | 10/1/2006 | 9/30/2009 | $9,000 |
Biological objectives Control weeds Improve waterfowl habitat and wetlands Manage public use Restore native habitat |
Metrics * # of road miles improved, upgraded, or restored: 8 miles total maintain as needed |
||||
Remove Debris | Remove Debris, Litter and Other Materials as Required | Remove debris as it is found or generated. Includes litter, old fencing, flood debris, etc. Hazardous materials removed in cooperation with the Washington Dept. of Ecology. | 10/1/2006 | 9/30/2009 | $19,200 |
Biological objectives Restore native habitat |
Metrics |
||||
Other | Construct storage building | Construct a storage building dedicated to wildlife area use either on site or at a new regional office site if logistically feasible. This is a cost share project with state funds. | 10/1/2006 | 9/30/2008 | $2,500 |
Biological objectives Control weeds Improve waterfowl habitat and wetlands Manage public use Restore native habitat |
Metrics |
||||
Produce Environmental Compliance Documentation | Cultural Resource Surveys and/or Consultation | Cooridinate cultural resource surveys as appropriate and work with BPA environmental compliance staff. | 10/1/2006 | 9/30/2009 | $18,000 |
Biological objectives Improve waterfowl habitat and wetlands Restore native habitat |
Metrics |
||||
Collect/Generate/Validate Field and Lab Data | Wildlife Use Data, General Habitat Monitoring and Photo-Point Documentation | Conduct established waterfowl and crane surveys to track response to enhancements. Collect habitat data and photo-point documentation to track vegetative trends and the potential need for adaptive management. | 10/1/2006 | 9/30/2009 | $31,500 |
Biological objectives Control weeds Improve waterfowl habitat and wetlands Restore native habitat |
Metrics Primary R, M, and E Type: Trend monitoring of waterfowl use by treatment Primary R, M, and E Type: Trend monitoring of wetland vegetation Secondary R, M, and E Type: Monitor HEP variables and wildife response |
||||
Analyze/Interpret Data | Analyze waterfowl and habitat data | Evaluate wildlife use data based on land treatments and evaluate habitat data relative to HEP models | 10/1/2006 | 9/30/2009 | $9,300 |
Biological objectives Improve waterfowl habitat and wetlands Restore native habitat |
Metrics Primary R, M, and E Type: Trend monitoring of waterfowl use by treatment Primary R, M, and E Type: Trend monitoring of wetland vegetation Secondary R, M, and E Type: Monitor HEP variables and wildife response |
||||
Provide Public Access/Information | Monitor and manage public and other uses. | Manage public uses in a manner that does not significantly detract from the goals of the wildlife area. | 10/1/2006 | 9/30/2009 | $12,300 |
Biological objectives Improve waterfowl habitat and wetlands Manage public use Restore native habitat |
Metrics |
||||
Outreach and Education | Community Outreach | Maintain an advisory group, presentations to local stakeholder groups, media contacts, and involvement of volunteers in wildlife area projects. | 10/1/2006 | 9/30/2009 | $9,300 |
Biological objectives Control weeds Improve waterfowl habitat and wetlands Manage public use Restore native habitat |
Metrics * # of general public reached: several hundred annually |
||||
Produce Plan | Conduct annual reviews and updates to management plan | Review the management plan on an annual basis and modify as necessary to achieve goals. | 10/1/2006 | 9/30/2009 | $8,100 |
Biological objectives Control weeds Improve waterfowl habitat and wetlands Manage public use Restore native habitat |
Metrics |
||||
Manage and Administer Projects | Conduct Administrative Activities to Operate, Enhance and Maintain Shillapoo Wildlife Area | Coordinated and responsive actions consistent with wildlife area management/ mitigation goals and objectives, improved employee performance, and compliance with pesticide application licensing requirements. | 10/1/2006 | 9/30/2009 | $140,288 |
Biological objectives Control weeds Improve waterfowl habitat and wetlands Manage public use Restore native habitat |
Metrics |
||||
Manage and Administer Projects | Produce PISCES status reports | Produce quarterly reports | 10/1/2006 | 9/30/2009 | $1,750 |
Biological objectives |
Metrics |
||||
Produce Annual Report | Annual Report | Report on activities and accomplishments | 10/1/2006 | 9/30/2009 | $2,300 |
Biological objectives |
Metrics |
Section 8. Budgets
Itemized estimated budget
Item | Note | FY07 | FY08 | FY09 |
---|---|---|---|---|
Personnel | Manager 0.5 FTE, Assistant Manager 1.0 FTE, (Annual 3.5% inflation factor used.) | $73,300 | $75,865 | $78,520 |
Fringe Benefits | (Annual 3.5% inflation factor used.) | $16,750 | $17,336 | $17,943 |
Personnel | Contracted crew labor (DNR WCC or corrections) (Annual 3.5% inflation factor used.) | $15,000 | $15,525 | $16,068 |
Supplies | Includes project supplies, utilities, tools, plants, seed, fertilizer etc. (Annual 3.5% inflation factor used.) | $80,000 | $82,800 | $85,698 |
Travel | Inflation factor of $50/year used. | $400 | $450 | $500 |
Other | Contracted services such as brush mowing, heavy disking, weed spraying, grading, etc. | $18,000 | $18,630 | $19,282 |
Capital Equipment | Replace one 3/4 ton truck | $0 | $20,000 | $0 |
Overhead | Current rate of 28.79% applied. Not applied to capital equipment. | $58,573 | $60,633 | $62,765 |
Totals | $262,023 | $291,239 | $280,776 |
Total estimated FY 2007-2009 budgets
Total itemized budget: | $834,038 |
Total work element budget: | $834,038 |
Cost sharing
Funding source/org | Item or service provided | FY 07 est value ($) | FY 08 est value ($) | FY 09 est value ($) | Cash or in-kind? | Status |
---|---|---|---|---|---|---|
NRCS (through Ducks Unlimited) | Shillapoo Lake wetland water management infrastructure | $100,000 | $0 | $0 | In-Kind | Confirmed |
USACOE | Shillapoo Lake wetland water management infrastructure | $750,000 | $750,000 | $0 | In-Kind | Confirmed |
USFWS--NAWCA (through Columbia Land Trust and DU) | North Unit wetland management control structures | $90,000 | $0 | $0 | In-Kind | Confirmed |
WDFW | Security service contract. | $6,500 | $6,800 | $7,000 | In-Kind | Confirmed |
WDFW | Access site maintenance | $2,500 | $2,600 | $2,700 | In-Kind | Confirmed |
WDFW | Diking District Assessments (BPA has stopped funding this) | $9,000 | $9,000 | $9,000 | Cash | Confirmed |
WDFW (State Migratory Bird Stamp) | Waterfowl and public use monitoring, habitat improvement, wood duck boxes | $40,000 | $0 | $0 | In-Kind | Confirmed |
Totals | $998,000 | $768,400 | $18,700 |
Section 9. Project future
FY 2010 estimated budget: $290,000 FY 2011 estimated budget: $290,000 |
Comments: All years: add 3.5% inflation cost. FY 2011 includes anticipated need for a 1 ton pickup replacement ($25,000). |
Future O&M costs: Future O&M needs include monitoring of habitat trends, human use and wildlife responses, maintenance of wetland vegetation and tree plantings, weed control, fence repair, water system operation and maintenance, general facility upkeep, administrative duties, public relations and reporting.
Termination date: Ongoing
Comments: Long term operation and management of wildlife habitat mitigation projects is a necessary component of mitigating the long term operation of the Columbia River Hydroelectic System.
Final deliverables: Secure high quality habitat that, along with other projects, mitigates the wildlife Impacts of the Columbia River Hydroelectric System.
Section 10. Narrative and other documents
Reviews and recommendations
FY07 budget | FY08 budget | FY09 budget | Total budget | Type | Category | Recommendation |
---|---|---|---|---|---|---|
NPCC FINAL FUNDING RECOMMENDATIONS (Oct 23, 2006) [full Council recs] | ||||||
$190,000 | $190,000 | $190,000 | $570,000 | Expense | ProvinceExpense | Fund |
NPCC DRAFT FUNDING RECOMMENDATIONS (Sep 15, 2006) [full Council recs] | ||||||
$190,000 | $190,000 | $190,000 | $0 | ProvinceExpense |
ISRP PRELIMINARY REVIEW (Jun 2, 2006)
Recommendation: Fundable
NPCC comments: Actions related to the project date back to 1992, including ISRP review in 2002 as part of the provincial review process. The SWA is located in the Vancouver Lowlands, and is intended to provide riparian, wetland, and oak woodland habitat across a former lakebed that was drained and developed as agricultural land. A goal of the WDFW acquisition program is to acquire the entire former lakebed and restore it to its former species diversity and wetland functions for wintering waterfowl, while keeping a portion of it in a semi-agricultural state that supports sandhill crane and geese populations. The proposed project should benefit focal wildlife species. It is not clear that the benefits will persist over the long-term because of the great potential for urban pressure on the site. The proposal clearly identifies the specific objectives in the Lower Columbia River Subbasin Plan and specific parts of the Fish and Wildlife Program. The proposal identifies other similar work but does not identify collaborative efforts. The ISRP encourages collaborative efforts. The rationale for this project and significance to regional programs is clear. Specifically, the problem of habitat degradation imposing limiting factors on wildlife species is clearly explained. This appears to be a worthwhile project that will benefit wetland-dependent species in the Vancouver Lowlands. Areas targeted for restoration and specific restoration actions are clearly identified. The objectives are very clearly defined and relate to specific tasks and related to the subbasin plan. The proposal clearly identifies tasks that are related to the objectives. The measurable benefits to wildlife are stated in terms of amount of habitat restored. It appears that reasonable, pragmatic approaches are proposed. An extensive monitoring and evaluation component includes five types of surveys. Monitoring of habitat and of wildlife response to changes in habitat will be done. Evaluation in terms of amount of habitat restored is clearly explained, but identification in terms of wildlife response is not as clearly specified. Identification of specific, measurable benefit to wildlife is recommended. Information transfer is mentioned but more specific information should be presented. It is not clear that the information obtained will be readily available in a usable format. The proposal should clearly identify the effect of the habitat restoration activities and resulting wildlife response on fish. Previous ISRP reviews noted the possibility of the potential for negative impacts on fish; the current proposal makes no mention of negative impacts. Indeed, little is mentioned about interactions with the larger lower Columbia River aquatic ecosystem. The ISRP encourages inclusion of a discussion of the effects of the overall actions on fish and aquatic species in the Lower Columbia River ecosystem as part of project reporting.
ISRP FINAL REVIEW (Aug 31, 2006)
Recommendation: Fundable
NPCC comments: Actions related to the project date back to 1992, including ISRP review in 2002 as part of the provincial review process. The SWA is located in the Vancouver Lowlands, and is intended to provide riparian, wetland, and oak woodland habitat across a former lakebed that was drained and developed as agricultural land. A goal of the WDFW acquisition program is to acquire the entire former lakebed and restore it to its former species diversity and wetland functions for wintering waterfowl, while keeping a portion of it in a semi-agricultural state that supports sandhill crane and geese populations. The proposed project should benefit focal wildlife species. It is not clear that the benefits will persist over the long-term because of the great potential for urban pressure on the site. The proposal clearly identifies the specific objectives in the Lower Columbia River Subbasin Plan and specific parts of the Fish and Wildlife Program. The proposal identifies other similar work but does not identify collaborative efforts. The ISRP encourages collaborative efforts. The rationale for this project and significance to regional programs is clear. Specifically, the problem of habitat degradation imposing limiting factors on wildlife species is clearly explained. This appears to be a worthwhile project that will benefit wetland-dependent species in the Vancouver Lowlands. Areas targeted for restoration and specific restoration actions are clearly identified. The objectives are very clearly defined and relate to specific tasks and related to the subbasin plan. The proposal clearly identifies tasks that are related to the objectives. The measurable benefits to wildlife are stated in terms of amount of habitat restored. It appears that reasonable, pragmatic approaches are proposed. An extensive monitoring and evaluation component includes five types of surveys. Monitoring of habitat and of wildlife response to changes in habitat will be done. Evaluation in terms of amount of habitat restored is clearly explained, but identification in terms of wildlife response is not as clearly specified. Identification of specific, measurable benefit to wildlife is recommended. Information transfer is mentioned but more specific information should be presented. It is not clear that the information obtained will be readily available in a usable format. The proposal should clearly identify the effect of the habitat restoration activities and resulting wildlife response on fish. Previous ISRP reviews noted the possibility of the potential for negative impacts on fish; the current proposal makes no mention of negative impacts. Indeed, little is mentioned about interactions with the larger lower Columbia River aquatic ecosystem. The ISRP encourages inclusion of a discussion of the effects of the overall actions on fish and aquatic species in the Lower Columbia River ecosystem as part of project reporting.