FY07-09 proposal 200003300
Jump to Reviews and Recommendations
Section 1. Administrative
Proposal title | Walla Walla River Fish Passage Operations |
Proposal ID | 200003300 |
Organization | Confederated Tribes of the Umatilla Indian Reservation |
Short description | Increase survival of migrating salmonids in the Walla Walla Basin by coordinating the overall passage program including monitoring passage conditions and operation of passage facilities and transport equipment to provide adequate passage conditions. |
Information transfer | Project provides monthly reports to co-managers detailing passage issues in the subbasin. |
Proposal contact person or principal investigator |
Contacts
Contact | Organization | |
---|---|---|
Form submitter | ||
James Bronson | CTUIR | prestonbronson@ctuir.com |
All assigned contacts | ||
James Bronson | CTUIR | prestonbronson@ctuir.com |
Julie Burke | Confederated Tribes of the Umatilla Indian Reserva | julieburke@ctuir.com |
Gary James | Confederated Tribes of the Umatilla Indian Reservation | garyjames@ctuir.com |
Brian Zimmerman | CTUIR | brianzimmerman@ctuir.com |
Section 2. Locations
Province / subbasin: Columbia Plateau / Walla Walla
Latitude | Longitude | Waterbody | Description |
---|---|---|---|
46.04 | 118.51 | Walla Walla River | Garden City/ Lowden II Diversion |
46.1 | 118.26 | Walla Walla River | Burlingame Dam and canal |
45.56 | 118.23 | Walla Walla River | Little Walla Walla River diversion |
45.94 | 118.38 | Walla Walla River | Nursery Bridge Fishway |
Walla Walla River | Walla Walla Subbasin including the mainstem Walla Walla River, Lower Touchet River, and Mill Creek |
Section 3. Focal species
primary: All Anadromous Salmonidssecondary: Pacific Lamprey
secondary: Bull Trout
Section 4. Past accomplishments
Year | Accomplishments |
---|---|
2005 | Operated and monitored passage facilities, operated adult traps and provided adult return data, drafted WW AOP, and provided technical input on passage and trapping facility designs. |
2004 | Operated and monitored passage facilities, operated adult traps and provided adult return data, drafted WW AOP, and provided technical input on passage and trapping facility designs. |
2003 | Operated and monitored passage facilities, operated adult traps and provided adult return data, drafted WW AOP, and provided technical input on passage and trapping facility designs. |
2002 | Operated and monitored passage facilities, operated adult traps and provided adult return data, drafted WW AOP, and provided technical input on passage and trapping facility designs. |
2001 | Operated and monitored passage facilities, operated adult traps and provided adult return data, drafted WW AOP, and provided technical input on passage and trapping facility designs. |
2000 | Operated and monitored passage facilities, operated adult traps and provided adult return data, drafted WW AOP, and provided technical input on passage and trapping facility designs. |
1999 | Operated and monitored passage facilities, operated adult traps and provided adult return data, drafted WW AOP, and provided technical input on passage and trapping facility designs. |
1998 | Operated and monitored passage facilities, operated adult traps and provided adult return data, drafted WW AOP, and provided technical input on passage and trapping facility designs. |
Section 5. Relationships to other projects
Funding source | Related ID | Related title | Relationship |
---|---|---|---|
BPA | 199601100 | Juv Screens & Traps Wallawalla | Proposed project identifies passage improvements to be completed under project 199601100. Also provides technical input on facility designs and operational criteria of facilities constructed under this proejct. Project 199601100 also provides O&M of facilities operated by the project. |
BPA | 200003900 | Walla Walla River Basin Monito | Proposed project provides adequate passage for natural adults and juveniles to and from natural production areas. Also provides adult return information to M&E project. |
BPA | 198805301 | Ne Or Hatchery Master Plan - N | After completion of the hatchery facility, proposed project will provide adequate passage for juveniles produced at the facility and collect broodstock for production programs. |
Section 6. Biological objectives
Biological objectives | Full description | Associated subbasin plan | Strategy |
---|---|---|---|
Increase survival of migrating salmonids | The biological objective of the project is to increase survival of migrants by ensuring adequate passage conditions exist for both upstream and downstream migration by monitoring river conditions and passage facility operations. The project also provides technical review and input on passage facilities and coordinates the overall passage program through development of the Annual Operation Plan. | Walla Walla | Section 1.1.5.2 of the Final Addendum to the Walla Walla Subbasin Plan |
Section 7. Work elements (coming back to this)
Work element name | Work element title | Description | Start date | End date | Est budget |
---|---|---|---|---|---|
Operate and Maintain Habitat/Passage | Monitor Passage Conditions | Monitor channel morphology, hydrologic conditions, and passage facility operations. | 1/1/2007 | 9/30/2009 | $189,975 |
Biological objectives Increase survival of migrating salmonids |
Metrics |
||||
Coordination | Coordinate Passage Facility Operations | Coordinate operation and maintenance of passage facilities (Little Walla Walla River, Nursery Bridge Dam, Burlingame Canal, and Garden City/Lowden II) on a weekly basis with Passage Facility O&M staffs. Jon Brough (HBDIC) is main contact for the Oregon facilities and Stuart Durfee (GFID) is the main contact for the Washington passage facilities. Problems or issues related to coordination of the overall passage effort are documented in the project monthly and annual reports. | 1/31/2007 | 9/30/2009 | $46,525 |
Biological objectives Increase survival of migrating salmonids |
Metrics |
||||
Produce Plan | Fish Passage Annual Operating Plan | Produce Annual Fish Passage Operations Plan (AOP0. The final AOP is attached to the annual report | 8/1/2007 | 9/30/2009 | $15,508 |
Biological objectives Increase survival of migrating salmonids |
Metrics |
||||
Trap and Haul | Little Walla Walla Trap and Haul | Operate Little Walla Walla River juvenile trapping facility as needed to provide safe passage conditions for downstream migrants. Transport downstream migrants past inadequate passage condition areas. Collect data related to downstream migrant trap and haul operations. Dates of operation and all data will be reported in the project monthly and annual reports. | 1/1/2007 | 9/30/2009 | $19,385 |
Biological objectives Increase survival of migrating salmonids |
Metrics |
||||
Trap/Collect/Hold/Transport Fish - Hatchery | Provide transportation assistance. | Provide safe adult and juvenile transportation assistance for other basin project efforts as needed. Participation in these other transport activities is documented in the project monthly and annual reports. | 1/1/2007 | 9/30/2009 | $19,385 |
Biological objectives Increase survival of migrating salmonids |
Metrics |
||||
Provide Technical Review | Provide Facility Design Technical Review | Attend meetings, review designs and plans, and provide technical review and comments as required for passage improvement efforts in the Walla Walla subbasin. The project notes which passage projects it provides technical comments for in the monthly and annual reports but does not include the actual details of those technical comments. | 1/1/2007 | 9/30/2009 | $42,648 |
Biological objectives Increase survival of migrating salmonids |
Metrics |
||||
Manage and Administer Projects | Project Management | Submit annual budget package for 2007-2009, invoices, accruals, and metric information to BPA. | 1/1/2007 | 9/30/2009 | $23,262 |
Biological objectives Increase survival of migrating salmonids |
Metrics |
||||
Produce Status Report | Prepare Status Reports | Produce monthly status reports for BPA and other recipients including: Bureau of Reclamation, NOAA Fisheries, ODFW, Irrigation Districts, and Oregon Water Resources Department. Summary of monthly report information will be incorporated into the annual report. | 1/1/2007 | 9/30/2009 | $7,754 |
Biological objectives Increase survival of migrating salmonids |
Metrics |
||||
Other | Produce Pisces Status Report | Quarterly milestone reports in Pisces. | 4/1/2007 | 9/30/2009 | $2,327 |
Biological objectives Increase survival of migrating salmonids |
Metrics |
||||
Produce Annual Report | Annual Report | Produce annual reports for 2007-2009. | 6/1/2007 | 9/30/2009 | $19,384 |
Biological objectives Increase survival of migrating salmonids |
Metrics |
||||
Produce Environmental Compliance Documentation | Environmental Compliance | Maintain necessary permits to conduct project tasks. | 1/1/2007 | 9/30/2009 | $1,550 |
Biological objectives Increase survival of migrating salmonids |
Metrics |
Section 8. Budgets
Itemized estimated budget
Item | Note | FY07 | FY08 | FY09 |
---|---|---|---|---|
Personnel | [blank] | $52,145 | $54,752 | $57,489 |
Fringe Benefits | [blank] | $17,341 | $18,208 | $19,118 |
Supplies | [blank] | $5,411 | $5,682 | $5,966 |
Travel | [blank] | $15,619 | $16,400 | $17,220 |
Overhead | [blank] | $32,467 | $34,090 | $35,795 |
Totals | $122,983 | $129,132 | $135,588 |
Total estimated FY 2007-2009 budgets
Total itemized budget: | $387,703 |
Total work element budget: | $387,703 |
Cost sharing
Funding source/org | Item or service provided | FY 07 est value ($) | FY 08 est value ($) | FY 09 est value ($) | Cash or in-kind? | Status |
---|---|---|---|---|---|---|
Totals | $0 | $0 | $0 |
Section 9. Project future
FY 2010 estimated budget: $142,367 FY 2011 estimated budget: $142,367 |
Comments: Cost estimates are based on a projected 5% increase in the cost of living and other wage increases, rising fuel and other material costs, and associated administrative costs. |
Future O&M costs:
Termination date:
Comments: The project is viewed as a long term O&M project required for maintaining the survival advantages achieved by implementation of the fish passage and flow enhancement projects in the basin.
Final deliverables:
Section 10. Narrative and other documents
Reviews and recommendations
FY07 budget | FY08 budget | FY09 budget | Total budget | Type | Category | Recommendation |
---|---|---|---|---|---|---|
NPCC FINAL FUNDING RECOMMENDATIONS (Oct 23, 2006) [full Council recs] | ||||||
$129,234 | $129,234 | $129,234 | $387,702 | Expense | ProvinceExpense | Fund |
NPCC DRAFT FUNDING RECOMMENDATIONS (Sep 15, 2006) [full Council recs] | ||||||
$0 | $0 | $0 | $0 | ProvinceExpense | ||
Comments: WA recommends 0 for now. This project will be reconsidered if 199601100 is capitalized. OR recommends $105k. Recommend that sponsors and Bonneville consider combining this project w/ 200721700 and find budget efficiencies. ISRP fundable qualified: sponsors should address the ISRP M&E comments the next time they report to Bonneville (copy to Council staff).. |
ISRP PRELIMINARY REVIEW (Jun 2, 2006)
Recommendation: Fundable (Qualified)
NPCC comments: See comments on 199601100 - Walla Walla Juvenile and Adult Passage Improvements. Is there any evidence of improvement to fish numbers as a result of these efforts?
ISRP FINAL REVIEW (Aug 31, 2006)
Recommendation: Fundable (Qualified)
NPCC comments: See comments on 199601100 - Walla Walla Juvenile and Adult Passage Improvements. Is there any evidence of improvement to fish numbers as a result of these efforts?