Section 1. Administrative

Proposal titleRestore and Protect Crooked River Watershed
Proposal ID200713400
OrganizationNez Perce Tribe
Short descriptionProtect and restore the Crooked River Watershed for the benefit of both anadromous and resident fish using an overall watershed health approach. This project is a cooperative effort between the Nez Perce Tribe and Nez Perce National Forest.
Information transferInformation gathered or produced by this project will be available for use by other agencies, etc. Information will be stored in Forest Service Databases.
Proposal contact person or principal investigator
Contacts
ContactOrganizationEmail
Form submitter
Stephanie Bransford Nez Perce Tribe sbransford@fs.fed.us
All assigned contacts
Stephanie Bransford Nez Perce Tribe sbransford@fs.fed.us
Stephanie Bransford Nez Perce Tribe sbransford@fs.fed.us

Section 2. Locations

Province / subbasin: Mountain Snake / Clearwater

LatitudeLongitudeWaterbodyDescription
45 50' 00"/45 43' 00" 115 36' 00"/115 27' 00" Crooked River Crooked River Watershed (tributary to the South Fork Clearwater River)

Section 3. Focal species

primary: Chinook Snake River Spring/Summer ESU
primary: Pacific Lamprey
primary: Steelhead Snake River ESU
secondary: All Resident Fish
secondary: Westslope Cutthroat
secondary: Pacific Lamprey
secondary: Bull Trout
secondary: Rainbow Trout
secondary: Mountain Whitefish

Section 4. Past accomplishments

YearAccomplishments

Section 5. Relationships to other projects

Funding sourceRelated IDRelated titleRelationship
BPA 199607705 Restore Mccomas Meadows Cumulative effects for South Fork Clearwater River Subbasin
BPA 199608600 Clearwater Focus Program-IDSCC Coordinate all projects within the Clearwater River Subbasin
BPA 199608702 Focus Watershed Coordination I Coordinate efforts between NPT and other agencies (Forest Service, etc.)
BPA 200003500 Rehabilitate Newsome Creek - S Cumulative effects for South Fork Clearwater River Subbasin
BPA 200003600 Protect And Restore Mill Creek Cumulative effects for South Fork Clearwater River Subbasin
BPA 200207200 Protect & Restore Red River Ws Cumulative effects for South Fork Clearwater River Subbasin
Other: Forest Service [no entry] Crooked/American River Stewardship Project This project involves more watershed restoration to be funded in part by the Forest Service as well as funds secured through a stewardship contract.
Other: IDFG [no entry] Crooked River Satellite Fish Hatchery Satellite Fish Hatchery on Crooked River.
BPA 199303501 Red River Restoration Cumulative effects for South Fork Clearwater Subbasin.

Section 6. Biological objectives

Biological objectivesFull descriptionAssociated subbasin planStrategy
Anadromous Fish Species Problem 2 Objective B Increase anadromous fish productivity and production, and life stage specific survival through habitat improvement. Clearwater Strategies 1-5, & 7
Environmental, Problem 10, Objective BB Protect and restore an additional 300 miles of riparian habitats by 2017. Clearwater 1, 2, 4-5
Environmental, Problem 11, Objective CC Protect the existing quality, quanitity, and diversity of native plant communities providing habitat to native wildlife species by preventing the introduction, reproduction, and spread of noxious weeds. Clearwater 1-7
Environmental, Problem 11, Objective DD Reduce the extent and density of established noxious weeds. Clearwater 1-4
Environmental, Problem 16, Objective JJ Reduce the impact of the transportation system on wildlife and fish populations and habitats. Clearwater 1-4
Environmental, Problem 7, Objective O Complete adequate flow designations for all anadromous fish bearing waterways by 2010. Clearwater 4,7
Environmental, Problem 7, Objective P Reduce number of artificially blocked streams by 2017. Clearwater 1-5
Environmental, Problem 7, Objective Q Reduce water temps to levels meeting applicable water quality standards for life stage specific needs of anadromous and native resident fish, with an established upward trend in the number of stream miles meeting standards by 2017. Clearwater 1-3, 5, 6
Environmental, Problem 7, Objective S Reduce instream sedimentation to levels meeting applicable water quality standards and measures, with an established upward trend in the number of stream miles meeting such criterion by 2017. Clearwater 1, 3-5
Environmental, Problem 7, Objective U Improve aquatic habitat diversity and complexity to levels consistent with other objectives outlined in this document, with particular emphasis on recovery of anadromous and fluvial stocks. Clearwater 1-7
Resident Fish Species Problem 4 Objective E Evaluate needs and opportunites to increase native resident populations of westslope cutthroat and bull trout throughout the subbasin by 2005. Clearwater 1-3
Resident Fish Species Problem 4 Objective F Increase populations of westslope cutthroat trout and bull trout where they are extirpated or low by 2017. Clearwater 2-4

Section 7. Work elements (coming back to this)

Work element nameWork element titleDescriptionStart dateEnd dateEst budget
Produce Environmental Compliance Documentation Provide NEPA information to BPA NEPA compliance must be obtained before project implementation. Project personnel will conduct NEPA sufficient to meet BPA and Forest Service standards. 9/1/2007 8/31/2010 $33,522
Biological objectives
Metrics
Manage and Administer Projects Management, Coordination and Communication Communications will include e-mail, telephone, compressed video conferences, and face-to-face meetings. 9/1/2007 8/31/2010 $91,068
Biological objectives
Metrics
Coordination General Project Coordination Activities include meetings, phone calls, grant writing, creating MOUs/MOAs and other communication tasks with partners and cooperators. 9/1/2007 8/31/2010 $58,659
Biological objectives
Metrics
Produce Design and/or Specifications Design Crooked River Culvert Replacements Culvert will be designed using natural stream simulation protocol and will be able to handle bankfull flows. 9/1/2007 8/31/2008 $44,162
Biological objectives
Metrics
Produce Inventory or Assessment Survey known/suspected areas of exotic plant infestations Exotic plant infestations need to be surveyed for location and extent. Some general locations are known but comprehensive surveys need to be conducted watershed wide, mainly focusing on road corridors, landings, and recreation locations. 9/1/2007 8/31/2008 $20,046
Biological objectives
Environmental, Problem 11, Objective CC
Metrics
Produce Plan Develop a treatment plan for areas of weed infestation A comprehensive plan needs to be developed for treating areas of weed infestations in the Crooked River Watershed. The plan will include locations of infestations, species, size of infestation, potential of infestation to grow, and recommended treatments. 9/1/2007 8/31/2008 $31,026
Biological objectives
Environmental, Problem 11, Objective CC
Environmental, Problem 11, Objective DD
Metrics
Remove vegetation Crooked River Weed Eradication Weed infestations within the Crooked River Watershed will be treated in accordance with the recommendations of the plan and within the scope of NEPA. 9/1/2007 8/31/2010 $35,473
Biological objectives
Environmental, Problem 11, Objective CC
Environmental, Problem 11, Objective DD
Metrics
* # of acres treated: 50
Remove/Modify Dam Replace Culverts This work element will return fish passage to 9 mile of stream by removing and replacing existing culverts that are juvenile steelhead, spring Chinook, and resident fish migration barriers. The NPNF will offer and manage contract installations. 9/1/2007 8/31/2010 $274,486
Biological objectives
Environmental, Problem 16, Objective JJ
Environmental, Problem 7, Objective O
Environmental, Problem 7, Objective P
Environmental, Problem 7, Objective S
Resident Fish Species Problem 4 Objective E
Resident Fish Species Problem 4 Objective F
Metrics
* # of miles of habitat accessed: 9
Improve/Relocate Road Improve 8 miles of road in the Crooked River Watershed. Improve 8 miles of road to reduce chronic sediment input into streams. These roads are identified as being needed for access and therefore cannot be decommissioned. Improvements may include the following; adding additional drainage structures, repairing failing drainage structures, limited re-grading and re-surfacing (with gravel on steeper sections of road), stabilizing and re-vegetating erosive cutslopes and fillslopes (may use bioengineering methods). 9/1/2007 8/31/2010 $89,473
Biological objectives
Environmental, Problem 11, Objective DD
Environmental, Problem 16, Objective JJ
Environmental, Problem 7, Objective O
Environmental, Problem 7, Objective P
Environmental, Problem 7, Objective S
Metrics
* # of road miles improved, upgraded, or restored: 8
Decommission Road Crooked River Road Removal Roads are being removed to reduce chronic sediment input into streams, these roads have been identified as not being needed for the transportation system. Roads will be fully recontoured, all stream crossings will be pulled and shaped to natural grade. 9/1/2007 8/31/2008 $90,473
Biological objectives
Environmental, Problem 10, Objective BB
Environmental, Problem 11, Objective CC
Environmental, Problem 11, Objective DD
Environmental, Problem 16, Objective JJ
Environmental, Problem 7, Objective O
Environmental, Problem 7, Objective P
Environmental, Problem 7, Objective S
Metrics
* # of road miles decommissioned : 10
Upland Erosion and Sedimentation Control Erosion control on Decommissioned Road Certified weed free straw will be placed on all stream crossings and wet seepy spots. Brush and trees removed from the road template will be used to cover up the road to reduce surface erosion as well as provide organic matter for soil enrichment. A game trail is usually left (since brush placement can be rather thick and hard for animals to walk through). 9/1/2007 8/31/2008 $17,098
Biological objectives
Environmental, Problem 11, Objective CC
Environmental, Problem 11, Objective DD
Environmental, Problem 16, Objective JJ
Environmental, Problem 7, Objective S
Metrics
* # of acres treated: 20
Plant Vegetation Seed Decommissioned Road Decommissioned roads are seeded and fertilized upon completion of recontouring. Time of application is between June 1 and October 30. Typically annual rye is used and is applied at 30 pounds per acre. Fertilizer is also applied concurrently with a chemical composition of 25% Nitrogen, 10% Phosphorus, and 7% Sulpher. Fertilizer is applied at 200 pounds per acre. 9/1/2007 8/31/2008 $32,098
Biological objectives
Environmental, Problem 11, Objective CC
Environmental, Problem 11, Objective DD
Environmental, Problem 16, Objective JJ
Environmental, Problem 7, Objective S
Metrics
* # of acres of planted: 20
Increase Instream Habitat Complexity Crooked River Stream Restoration Approximately 0.8 miles of Crooked River will receive treatment. In-stream restoration may include the placement of boulders and/or root wads within the channel for flow diversion, working to stabilize stream banks and create pools for fish habitat, and actual relocation of altered stream channels to their historic flow location and regime/pattern. 9/1/2007 8/31/2008 $105,473
Biological objectives
Anadromous Fish Species Problem 2 Objective B
Environmental, Problem 10, Objective BB
Environmental, Problem 7, Objective O
Environmental, Problem 7, Objective Q
Environmental, Problem 7, Objective S
Environmental, Problem 7, Objective U
Resident Fish Species Problem 4 Objective E
Resident Fish Species Problem 4 Objective F
Metrics
* # of stream miles treated: 0.8
Realign, Connect, and/or Create Channel Crooked River Stream Restoration Approximately 0.8 miles of Crooked River will receive treatment. In-stream restoration may include the placement of boulders and/or root wads within the channel for flow diversion, working to stabilize stream banks and create pools for fish habitat, and actual relocation of altered stream channels to their historic flow location and regime/pattern. 9/1/2007 8/31/2008 $105,473
Biological objectives
Anadromous Fish Species Problem 2 Objective B
Environmental, Problem 10, Objective BB
Environmental, Problem 7, Objective O
Environmental, Problem 7, Objective Q
Environmental, Problem 7, Objective S
Environmental, Problem 7, Objective U
Resident Fish Species Problem 4 Objective E
Resident Fish Species Problem 4 Objective F
Metrics
* # of stream miles treated, including off-channels, after realignment: 0.8
Produce Plan Conduct a feasibility study for the rehabilitation of the Crooked River meanders. A feasibility study needs to be developed for rehabilitating 3.2 miles of Crooked River. Dredge mining has heavily impacted this section of the lower mainstem of Crooked River. The study will include historic conditions, present conditions, and give a range of restoration alternatives along with detailed cost estimates. 9/1/2008 8/31/2009 $131,629
Biological objectives
Metrics
Collect/Generate/Validate Field and Lab Data Culvert Replacement Data Collection Data to be collected for the replaced culvert includes: redd counts, profile measurements, fish presence/absence and abundance (collected by snorkeling), in-culvert substrate, and gradient measurements. Monitoring stations will be set up at this site in order to record data for several seasons to monitor for effectiveness and proper construction. The purpose is to determine whether the new culvert is successful. 9/1/2007 8/31/2010 $20,046
Biological objectives
Metrics
Primary R, M, and E Type: Project Implementation / Compliance Monitoring
Collect/Generate/Validate Field and Lab Data Removed roads data collection. Monitoring stations will be set up by our Tribal road obliteration monitoring expert. Methodology has already been established for this type of monitoring, please see below milestone description for more specifics. The purpose is to determine the success of the road obliteration. 9/1/2007 8/31/2010 $20,046
Biological objectives
Metrics
Primary R, M, and E Type: Project Implementation / Compliance Monitoring
Collect/Generate/Validate Field and Lab Data Stream Habitat Data Collection Data is needed to monitor and evaluate biological, chemical and physical habitat parameters that affect salmonid production the Crooked River watershed. Information will be collected on macro-invertebrates, periphyton, flow, temperature, sediment composition, and habitat parameters to include channel morphology, valley width index, Wolman Pebble counts, cobble embeddedness, large woody debris, bank stability, and riparian condition and density. The monitoring will occur between the start and end dates above, but the exact timing for the locations will be determined and adjusted during field season. 9/1/2007 8/31/2010 $20,046
Biological objectives
Metrics
Primary R, M, and E Type: Status and Trend Monitoring, Project Compliance
Analyze/Interpret Data Condition/Health of Crooked River. Densities and abundance of fish will be estimated using snorkeling data. Temperature, flow data, and physical habitat parameters such as macroinvertebrates, cobble embeddedness and stream morphological measurements will be summarized and used to document success for stream restoration activities. 9/1/2007 8/31/2010 $24,162
Biological objectives
Metrics
Primary R, M, and E Type: Status and Trend, Project Compliance Data Analysis
Outreach and Education Upper South Fork Clearwater River Watershed Restoration Education Outreach The education and outreach component will focus on informing the public about the watershed restoration activities that are happening in the Upper South Fork Clearwater River Subbasin and how they can participate or support restoration efforts. This information will be relayed through several different formats, examples being informational brochures, public meetings, meetings with Framing Our Community, and educational workshops with the local schools. 9/1/2007 8/31/2010 $35,156
Biological objectives
Metrics
* # of general public reached: 350

Section 8. Budgets

Itemized estimated budget
ItemNoteFY07FY08FY09
Personnel 2 FTE $65,900 $69,195 $72,655
Fringe Benefits 30% $57,640 $60,522 $63,548
Supplies Field, non-expendable property $6,165 $6,165 $6,165
Travel Vehicles, meeting, field per diem, etc. $9,447 $9,447 $9,447
Overhead 29.64% $41,245 $43,076 $44,998
Other Herbicide $4,000 $4,000 $2,000
Other Subcontract items $341,000 $261,000 $102,000
Totals $525,397 $453,405 $300,813
Total estimated FY 2007-2009 budgets
Total itemized budget: $1,279,615
Total work element budget: $1,279,615
Cost sharing
Funding source/orgItem or service providedFY 07 est value ($)FY 08 est value ($)FY 09 est value ($)Cash or in-kind?Status
Nez Perce National Forest Stewardship Contract Restoration Funding $150,000 $250,000 $250,000 In-Kind Confirmed
Nez Perce National Forest Project Design, contract prep & admin, monitoring, etc $30,000 $30,000 $30,000 In-Kind Under Review
Nez Perce NF, PCSRF, Central Idaho RAC, etc Portion of Contract Award Funding $15,000 $15,000 $15,000 Cash Under Development
Totals $195,000 $295,000 $295,000

Section 9. Project future

FY 2010 estimated budget: $375,000
FY 2011 estimated budget: $375,000
Comments: In 2010 NEPA should begin on restoration of the Crooked River Meanders, then implementation of the restoration alternative(s) in 2011.

Future O&M costs:

Termination date: 2025
Comments: Work in the Crooked River Watershed must be phased over several years in order to keep restoration impacts (short-term) at a minimum. Funding is also easier to secure if project work is phased.

Final deliverables: The Crooked River Watershed will be an intact, healthy, functioning watershed that is able to sustain all species at historical or near-historical levels. The watershed will meet South Fork Clearwater River TMDL recommendations as well as Nez Perce National Forest Plan standards.

Section 10. Narrative and other documents

ISRP Responses for project 200713400 Jul 2006
Additional ISRP Responses for all NPT Watershed Projects Jul 2006
NPT DFRM Watershed Umbrella Comments Jul 2006
Mtn Snake NPT DFRM Project Recommendations with comments Jul 2006

Reviews and recommendations

FY07 budget FY08 budget FY09 budget Total budget Type Category Recommendation
NPCC FINAL FUNDING RECOMMENDATIONS (Oct 23, 2006) [full Council recs]
$0 $0 $0 $0 Expense ProvinceExpense Do Not Fund
NPCC DRAFT FUNDING RECOMMENDATIONS (Sep 15, 2006) [full Council recs]
$0 $0 $0 $0 ProvinceExpense

ISRP PRELIMINARY REVIEW (Jun 2, 2006)

Recommendation: Response requested

NPCC comments: This project proposal is very similar to 200714200 - Restore and Protect American River Watershed. As such review comments are similar. This project needs greater and clearer detail of the specific activities to be undertaken and the specific timeframe toward completion (specifically a clear initiation and endpoint). Moreover, the proposal would benefit from a more clearly identifiable need and justification for its undertaking relative to objective (measurable), benefits to focal species (salmon and steelhead), and effects on non-focal species (specifically, will culvert repair facilitate colonization by non-native species?). This project is a first step in improving or restoring impaired habitat in the Crooked River watershed. As part of a longer-term set of goals and objectives aimed at addressing limiting factors identified in the Clearwater Subbasin Plan for critical salmon and trout populations. The ISRP recommends that for this group of similar “Restore and Protect” projects in this (Crooked River) and other watersheds, the sponsors prioritize which watershed(s) are justified to have the likely greatest measurable benefits. From such a prioritization the top project could be funded as a demonstration and proof of concept from which data and population responses can be used to make a stronger case for future work in the other watersheds. The ISRP also recommends that project duration be limited to those specific actions that can be completed within funding cycle; e.g., the four culverts that have been identified as problems. The ISRP could not determine if the road repair work was to be truly focused on habitat improvement for salmon or if the actions are merely to repair roads to facilitate ongoing logging operations which would continue to contribute to road-related stresses. This needs fuller clarification. If it is the latter, we recommend alternative funding avenues be sought. Also, restoration of meanders would prove a difficult proposition unless the riprap is removed and the stream is permitted access to the old flood plain. The weed control program appears to be limited to spraying and is glazed over without explanation as to its benefits, how it ties into the overall project (it appears to be a “throw in” item), and an explanation of how the habitat will be changed/improved so that weeds do not return even if it is possible to eliminate them. The proposal cites objectives that are generally stated in terms of miles of stream improved, roads decommissioned or improved, culverts removed or redesigned, etc. rather than in terms of specific or expected outcomes to salmon, trout, or wildlife. As such the proposal is a work/task list but needs measurable objectives specified in terms or biological response. Regardless, implementation is amenable to monitoring for implementation. The monitoring and evaluation needs some expansion to define the specific objectives and responses by salmon/steelhead that indicates success (or not). Methods described include working relationships among key partners including Nez Perce Tribe, Forest Service (NPNF), and BLM. Absent is any stated relationship with IDFG, who presumably participate in biological monitoring (and measurement of response).


ISRP FINAL REVIEW (Aug 31, 2006)

Recommendation: Not fundable

NPCC comments: The ISRP carefully reviewed the series of Restore and Protect proposals in the Clearwater Subbasin for justification based on a “needs” prioritization; assessment of expected impact to habitat at a coarse level and to focal species at a fine level, and an appropriate level of M&E. The sponsors appear to have misinterpreted the ISRP's original review comment pertaining to justification for this project’s elements (including barrier removal). The ISRP sought justification of each specific project based on the quality and quantity of habitat above a barrier and the potential increase in fish use and benefit. Here, the ISRP recommends as a precursor (perhaps as a future stand alone project) a quantitative evaluation of habitat quality and quantity above each barrier, and that these estimates should play a major role in prioritizing barrier replacement/removal projects. An additional rationale for requesting a project prioritization was to guide Council as to which project(s) of the group similarly submitted might yield greatest and lasting biological response to focal species per investment. Ultimately, the sponsors provided a ranking regarding this and similar projects. While the process was not transparent, nonetheless, this particular project was listed toward the bottom half of ~20 or so similar projects. For full comments on "restore and protect" type projects, please see heading “General comments concerning Nez Perce Tribe proposals to protect and restore various watersheds” at the beginning of the ISRP comments on project # 199607702, Protect & Restore Lolo Creek Watershed.