FY07-09 proposal 200725700

Jump to Reviews and Recommendations

Section 1. Administrative

Proposal titleProtect and Restore the Imnaha Subbasin
Proposal ID200725700
OrganizationNez Perce Tribe
Short descriptionThis project seeks to continue protecting existing high quality habitat. It further seeks to restore and enhance habitat where feasible and opportunity exists. Another component of this proposal is education and outreach.
Information transferThe information collected during this project will be stored in a local database. It will also be uploaded to the StreamNet website, contained in various reports required by BPA, contained on the NPT website, and stored on the BPA website (see narrative for more details).
Proposal contact person or principal investigator
Contacts
ContactOrganizationEmail
Form submitter
Richard Christian Nez Perce Tribe richardc@nezperce.org
All assigned contacts
Richard Christian Nez Perce Tribe richardc@nezperce.org
Richard Christian Nez Perce Tribe richardc@nezperce.org
Richard Christian Nez Perce Tribe richardc@nezperce.org
Arleen Henry Nez Perce Tribe arleenh@nezperce.org
Ira Jones Nez Perce Tribe iraj@nezperce.org

Section 2. Locations

Province / subbasin: Blue Mountain / Imnaha

LatitudeLongitudeWaterbodyDescription
45.17009 117.08739 Big Sheep Creek This is the locaion of the Wallowa Valley Improvement Canal point of diversion in the Big Sheep Watershed. It will be the approximate location of both the diversion replacement and the newly installed fish screen. This may not be the first diversion replaced as part of this proposal, but this is a diversion that will be addressed. The current effort to prioritize barrier replacements will determine which structure will be replaced first. Regardless of the outcome of the prioritization, this diversion is critical within this subbasin. Refer also to narrative.
45 14-16 117 00-04 Carrol Creek This is the selected location of the road decommissioning section of this proposal. There is an individual road selected. This will occur during the first year of the project, subsequent roads to treat will be selected as part of this proposal. The exact starting and ending waypoints were not obtained, as that will be part of this project. (see Narrative section of this document- map included).
45 16-46 116 41-117 03 Imnaha Subbasin Barrier replacements (culverts & diversions) in the Imnaha & Big Sheep Watersheds, including tributaries streams (Little Sheep, Camp, Lightning, Cow Crks). Specific project locations were not possible at this time, because the currently active BPA project (Wallowa Culvert Inventory) is still in progress to inventory, assess and prioritize these crossings for replacement. To date, numerous crossings (but not all have been surveyed) have behave been identified as barriers, but they are too numerous to list individually here. The resolution will be a point. See Map in Narrative Section of this document.
45 16-46 116 41-117 03 Imnaha Subbsin Stream restoration areas (bank work, fencing, planting, off site water, and etc.) will include portions of Imnaha & Big Sheep Watersheds, including tributaries streams (Little Sheep, Camp, Lightning, Cow Crks). Specific project locations were not possible for the entire 3 year period, as some of the sites will be developed as part of this proposal. Because this implementation element encompasses entire stream segments, specific lat and longs were not possible. See Map in Narrative Section of this document.
45 07-08 117 54-58 Skookum Creek This is the selected location of the road maintenance section of this proposal. This will occur during the first year of the project, subsequent roads to treat will be selected as part of this proposal. The exact starting and ending waypoints were not obtained, as that will be part of this project. (see Narrative section of this document- map included).
45.42025 117.28032 Imnaha Subbasin Nez Perce Tribe, Department of Fisheries Resource Management, Enterprise Field Office location. This is the primary location of this project, as the ceded territory of NPT incorporates many subbasins.

Section 3. Focal species

primary: Chinook Snake River Fall ESU
primary: Chinook Snake River Spring/Summer ESU
primary: Steelhead Snake River ESU
secondary: All Anadromous Fish
secondary: All Anadromous Salmonids
secondary: River Lamprey
secondary: Other Anadromous
secondary: All Resident Fish
secondary: Bull Trout
secondary: Rainbow Trout
secondary: Interior Redband Trout
secondary: Mountain Whitefish
Additional: Rocky Mountain Elk, Whitetail & Mule deer, Tailed Frogs, Grey Wolf, American Black Bear, Bighorn Sheep, Bald Eagle, potentially Canada Lynx, Columbia Spotted Frog, ALEUTIAN CANADA GOOSE and all other wildlife species that inhabit this area- also refer to narrative

Section 4. Past accomplishments

YearAccomplishments

Section 5. Relationships to other projects

Funding sourceRelated IDRelated titleRelationship
BPA 199402700 Grande Ronde Model Ws Habitat Funding was recently obtained from the GRMWP to replace the Mahogany culvert located on the upper Imnaha River. This directly relates to the current proposal by replacing a known high priority barrier to fish migration in Wallowa County.
BPA 199702500 Wallowa County/Nez Perce Salmo This project will help to implement some of the aspects laid out in this document (see narrative).
BPA 199901600 Protect/Restore Big Canyon Cr. A portion of this contract was the inventory, assessment and prioritization of all stream/road crossings in this watershed. The prioritization criteria that were developed during this project will be used and slightly modified to develop the priority list of replacement structures in Wallowa County. This list will then be used in the current proposal to replace fish passage barrier structures.
BPA 199901700 Rehabilitate Lapwai Creek The roads survey protocol that was finalized in the Lapwai Creek proposal will be used in the current proposal. Also, refer to comments on Protect/Restore Big Canyon Creek project (199901600).
BPA 200207300 Wallowa Culvert Inventory Utilizing the prioritization established by this culvert inventory and assessment, this project seeks to replace those high priority fish barrier structures with structures that allow passage to all species.
BPA 200400200 PNAMP Funding This project will utilize the EMAP protocols associated with PNAMP to monitor watershed condition and trend. This will be done through the NEOH Implementation project, rather than as a direct objective/action of this proposal.
PCSRF - CRITFC 2001-1-02 Wallowa County Culvert Invento This project helped to inventory and assess for fish passage all culverts in Wallowa County. The data collected during this project will be used in prioritizing the structures that require replacement to meet currect passage standards. Again, when that priority list is established, the current proposal would seek implementation funding to replace those high priority structures.
PCSRF - CRITFC 2004-1-03 Wallowa County Watershed Resto A portion of this project funding was used to aid in the replacement of a high priority culvert. There is a direct link to this proposal which would also seek to replace additional high priority fish passage obstructions. In addition, a portion of this project funding was used to protect an important cultural resource site by fencing the area. This relates to the current proposals objectives of protecting treaty resources.

Section 6. Biological objectives

Biological objectivesFull descriptionAssociated subbasin planStrategy
Determine Effective Restoration Approaches Monitor all projects to determine their effectiveness. This will allow for the determination of the best and cost-effective methods to employ in restoration applications. Imnaha 2A-2, 2A-5, 6A-3, 7A-7, 9A-1, 9B-3, 11A-6, 12A-7, 14A-5, 16A-4, 17A-10, 23A-4
Education/Outreach in Project Implementation Education related to project implementation and noxious weeds is a very high priority for the NPT. Actively involving students, teachers and community members in habitat restoration projects is essential to fully realize the intent of this proposal. We believe strongly in getting young people involved with projects; it provides educational opportunities and allows project managers to utilize volunteers for implementation. This will enable them to gain exposure in restoration activities, perhaps pursue a career in a related field and carry that knowledge to others in the community. This grass-roots approach will pay huge dividends in the future, as these students get older. They will then have the basic knowledge base necessary to recognize, mitigate, and/or prevent resource damage in the future. Measureable Parameters: Number of students involved in projects; hours of project implementation volunteer time; and, number of presentations/fliers/booths presented. Imnaha 8B-5, 16B-2, 17A-2, 17A-3, 17A-4, 17A-5, 17A-9, 21A-2, 22A-1, 22A-2, 23A-2, 23A-3, 23A-5, 23A-6, 23A-7, 23A-8, 23A-9
Inventory and Treatment of Noxious Weeds/Invasives This objective will be met in cooperation with numerous local agency personnel, including personnel from the County Weed Board, County Vegetation Control Office, Wallowa Resources, Forest Service, The Nature Conservancy, NRAC and ODFW. This will also allow for numerous volunteers to become involved. This objective will also be met through monitoring and treatment of any weeds associated with ground disturbing activities within this proposal. Measureable Parameters: Acres of weeds inventoried and acres treated. Imnaha 17A-1, 17A-2, 17A-3, 17A-4, 17A-5, 17A-6, 17A-7, 17A-8, 17A-9, 17a-10, 21A-2, 21A-3, 21A-4, 23A-3, 23A-5, 23A-6, 23-7, 23A-8, 23A-9
Protect Existing High Quality Habitat This objective will be accomplished primarily through activities like monitoring projects that may affect watershed health in headwater habitats. This will also be accomplished by participating in various local planning groups, such as the Natural Resource Advisory Committee to the Wallowa County Commissioners, the Hell's Canyon Comprehensive Management Plan Implementation Group, and various watershed assessment working groups. Also, providing technical review of projects proposed by various groups and individuals will help to allow for more effective and beneficial implementation techniques. Measureable Parameters: Number of meetings attended; number of projects reviewed for technical merrit; and, number of federally proposed actions reviewed. Imnaha 22A-1, 22A-2, 23A-2, 23A-3, 23A-4, 23A-5, 23A-6, 23A-7, 23A-8, 23A-9
Reduce Stream Temperatures This will be accomplished in conjunction with the reduction in sedimentation objective. The installation of woody debris and rock structures will help to create pools, which will cool water locally. Additionally, riparian plantings will eventually help to cool the water. And, the removal of livestock (in certain, specific areas) will insure the success of the plantings. Measureable terms: See Biological Objective Reducing Sedimentation. Imnaha 7A-1, 7A-2, 7A-3, 7A-5, 7A-6, 7A-7, 17A-7, 17A-8, 21A-3, 23A-2, 23A-3, 23A-5, 23A-6, 23A-7
Reducing Sedimentation This biological objective will incorporate passive and active restoration activities. Passive restoration will include developing livestock management plans and educating landowners in appropriate riparian area activities. Active restoration efforts will include planting and fencing riparian zones, caging plants in other areas, off-site water developments, road treatments, and installation of woody debris jams and/or rock structures, as appropriate. (work elements 22, 29, 47, 40, 44, 118, 180, 30, 157, 161, 162 and 99). Measureable Parameters: Number of installed rock and log structures/year; number miles fence built; number of plants planted & protected/year; number of off-site water developments/year; and, number culverts replaced per year. Imnaha 7A-1, 7A-2, 7A-3, 7A-5, 7A-6, 9A-1, 9A-2, 9B1, 9B2-1, 9B-2, 9B-3, 23A-3, 23A-6, 23A-9
Re-Open Historic Anadromous Habitat This objective will be accomplished by replacing fish passage barriers, as determined from the current project to inventory, assess and prioritize crossings in Wallowa county. It is closely related to the restoring watershed connectivity objective. Measureable Parameters: Number of structures replaced per year and miles of habitat re-opened. Imnaha 6A-2, 10A-1, 10A-2, 10-3, 10A-6, 11A-3, 17A-7, 17A-8, 21A-1, 21A-2, 21A-3, 22A-1, 23A-2, 23A-3, 23A-5, 23A-6
Restore Native Plant Communities This will be accomplished by planting native quacking aspen in areas that are suitable, planting native shrubs along stream reaches that are also being restored by meeting the biological objective to restore riparian function and channel condition, native grass seed collection and propogation (in conjunction with the Forest Service efforts), and through inventory and treatment of noxious weeds. In all ground disturbing portions of this proposal, noxious weed monitoring will be part of the project. In conjunction with monitoring for weeds infestations, native stock of sedges, grasses and shrubs will be used to rehabilitate the site. Noxious weeds will be treated to allow for native plants to colonize the site, as usually weeds can and do outcompete native plants. Measureable Parameters: Number of native plants planted; acres of treated weed infestations, pounds of native seed collected, acres of sedge and/or grass seeded area; and, acres of noxious weeds inventoried. Imnaha 7A-1, 7A-2, 7A-3, 14B-1, 14B-2, 14B-3, 14B-4, 14B-5, 16B-1, 16B-2, 16B-3, 17A-1, 17A-7, 17A-8, 17A-10, 18A-3, 21A-2, 21A-3, 22A-1, 22A-2, 23A-2, 23A-3, 23A-5, 23A-6, 23A-7, 23A-8
Restore Riparian Function & Channel Conditions This objective is accomplished by channel restoration efforts, such as, channel re-construction, fence installation, vegetation planting & protection, and removal of fish passage barriers (work elements 22, 29, 47, 40, 44, 118, 180, 30, 157, 161, 162 and 99). Measureable Parameters: Number of installed rock and log structures/year; number miles of reconstructed stream channel per year; number miles fence built; number of plants planted & protected/year; number of off-site water developments/year; and, number culverts replaced per year. Imnaha 11A-1, 11A-2, 11A-3, 11A-4, 11A-5, 11A-6, 16A-1, 16A-2, 16A-3, 16A-4, 16B-1, 16B-2, 16B-3, 16B-4, 16B-5, 16B-6, 17A-7, 17A-8, 21A-2, 21A-3, 22A-1, 22A-2, 23A-2, 23A-3, 23A-5, 23A-6, 23A-7
Restore Watershed Connectivity Connectivity within a watershed to more complex habitats will be accomplished through the replacement of fish passage barriers. These barriers include culverts, irrigation diversions, and in some cases, bridges (in specific cases as when they contain concrete bottoms). The removal of the structure will also incorporate a component to install automated headgates to be able to better control the amount of water entering the diversion ditch. Addressing this objective in many cases accomplishes other objectives, such as reducing sedimentation to the stream and improving channel and riparian condition. Refer to prioritization table contained in narrative. Measureable Parameters: Number of structures replaced per year and miles of habitat re-opened Imnaha 6A-2, 10A-1, 10A-2, 10-3, 10A-6, 11A-3, 17A-7, 17A-8, 21A-1, 21A-2, 21A-3, 22A-1, 23A-2, 23A-3, 23A-5, 23A-6
Road Treatments This objective seeks to reduce the sediment delivery to streams from forest roads. Road treatment will include any available means to reduce the impacts of roads, which will include the following: decomissioning (full and partial recontour, obliteration, road maintenance, and etc.). The specific roads that will be treated in the first year of this project are outlined in the narrative section of this proposal. Subsequent roads to be treated will be determined from the transportation planning and roads analysis that will also be conducted as part of this proposal. The measureable parameters are miles of road treated. Imnaha 9A-1, 9B2, 11A-2, 17A-7, 17A-8, 19A-1, 19A-2, 19A-3, 19A-4, 21A-1, 21A-2, 21A-3, 22A-1, 22A-2, 23A-2, 23A-3, 23A-5, 23A-6, 23A-7, 23A-8, 23A-9

Section 7. Work elements (coming back to this)

Work element nameWork element titleDescriptionStart dateEnd dateEst budget
Produce Environmental Compliance Documentation NEPA and Consultation Documentation Produce environmental compliance documentation for all implementation projects. This would also include obtaining any necessary permits for project implementation, such as 404 and Division of State Lands. This would also include performing any necessary surveys, such as cultural resource surveys. 10/1/2006 9/30/2009 $84,000
Biological objectives
Reduce Stream Temperatures
Reducing Sedimentation
Re-Open Historic Anadromous Habitat
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Road Treatments
Metrics
Decommission Road Decommission Roads to Decrease Sediment Inputs into Streams The specific roads that will be decomissioned during the first year of this project are outlined in the narrative. Subsequent roads that will be treated (in FY08 & 09) will be determined through the transportation planning and roads anaylis process. Thus, the analysis and planning will occur at the same time as the first year's decomissioning. Also as part of this process, noxious weeds will be inventoried and treated. In addition, educational opportunities will be pursued to dessiminate the knowledge gained through this project. 10/1/2006 9/30/2009 $154,649
Biological objectives
Determine Effective Restoration Approaches
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Reducing Sedimentation
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Road Treatments
Metrics
* # of road miles decommissioned : A target of 5/yr; 4.2 the 1st yr
Develop Alternative Water Source Develop Alternative Water Source This work element would most often be done in conjunction with the install fence WE. It would also be done concurrently with planting native vegetation. 10/1/2006 9/30/2009 $65,000
Biological objectives
Education/Outreach in Project Implementation
Protect Existing High Quality Habitat
Reduce Stream Temperatures
Reducing Sedimentation
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Metrics
Enhance Floodplain Improve Floodplain Function This work element will be closely linked to other work elements (eg. 40, 47, 29, 30). This will be accomplished via riparian plantings, off-sight water development, fencing, bioengineering/bank shaping, noxious weed treatment and perhaps creating new channels where appropriate. 10/1/2006 9/30/2009 $350,000
Biological objectives
Determine Effective Restoration Approaches
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Reduce Stream Temperatures
Reducing Sedimentation
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Metrics
* # of acres treated: Up to 20 per year
Improve/Relocate Road Maintain Existing Roads to Decrease Sediment Inputs into Streams Numerous project area streams are contributing sediment to streams. Several of these roads will not be closed as part of the roads analysis and transportation planning process, thus, they will need to be maintained to reduce the impacts. For a complete description of this see the attached narrative. 10/1/2006 9/30/2009 $225,000
Biological objectives
Determine Effective Restoration Approaches
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Reducing Sedimentation
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Road Treatments
Metrics
* # of road miles improved, upgraded, or restored: 1.0/year
Increase Instream Habitat Complexity Install Stuctures to Maintain Bank Stability and Increase Habitat Complexity As part of the stream restoration aspect of this proposal, structures such as woody debris jams will be installed. These structures will serve the dual purpose of bank stabilization and providing for more complex habitat. This will be closely associated with several other work elements. 10/1/2006 9/30/2009 $215,000
Biological objectives
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Reducing Sedimentation
Restore Riparian Function & Channel Conditions
Metrics
* # of structures installed: 5 structures/yr
Install Fence Install Riparian Exclosure Fence for Livestock Build up to 5 miles of fencing around riparian areas to exclude livestock use. Off-sight water developments will also be constructed most of the time in conjunction with this work element. This will be done in conjunction with planting most of the time. 10/1/2006 9/30/2009 $182,500
Biological objectives
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Reduce Stream Temperatures
Reducing Sedimentation
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Metrics
* # of miles of fence: Up to 5 Miles/yr
Plant Vegetation Plant Vegetation Plant upland and riparian vegetation in appropriate areas. Some of the areas will be inside the newly constructed fences contained in work element 40 above. Some areas will include the bank shaping/bioengineering components and barrier replacement projects, while still others will occur in areas solely to restore native vegetation. 10/1/2006 9/30/2009 $122,500
Biological objectives
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Reduce Stream Temperatures
Reducing Sedimentation
Re-Open Historic Anadromous Habitat
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Road Treatments
Metrics
* # of acres of planted: Up to 20/yr
Realign, Connect, and/or Create Channel Restoration of Stream Channels As part of the stream restoration aspect of this proposal, it will sometimes be necessary to create new channels, perform bank bioengineering, and realign existing channels. This work element will be associated with #29 (Increase Instream Habitat Complexity)--see narrative for description. It will also re-connect the floodplain to the stream, thus reconnecting the health of the watershed as a whole. 10/1/2006 9/30/2009 $335,000
Biological objectives
Determine Effective Restoration Approaches
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Reduce Stream Temperatures
Reducing Sedimentation
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Metrics
* # of stream miles treated, including off-channels, after realignment: 0.1mi/yr
Remove vegetation Noxious Weed/Invasive Species Inventory & Treatment Noxious weeds will be inventoried and treated. In conjunction with these efforts, a large educational opportunity exists to inform the general public and school children in what weeds are, how they impact the environment and what they, as individuals, can do to help prevent their continued spread. 10/1/2006 9/30/2009 $75,000
Biological objectives
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Protect Existing High Quality Habitat
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Road Treatments
Metrics
* # of acres treated: Up to 160 Inventoried/yr treated as necessary
Maintain Vegetation Maintain Vegetation Through Protective Structures This work element is closely associated with work element No. 40. Additionally, vegetation will be maintained through the use of other structures, such as vexar tubing (3500 tubes) and protective cages (150 panels for caging). This WE is also closely linked to the noxious weeds/invasive species component of this proposal. In order to maintain the vegetation that is planted, weed surveys and treatment will be needed. In addition, there will be an educational part of this WE. The metrics here would be the number per year and acres treated. 10/1/2006 9/30/2009 $170,000
Biological objectives
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Reduce Stream Temperatures
Reducing Sedimentation
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Metrics
Install Fish Passage Structure Remove and Replace Barrier Culverts Remove high priority (determined by the current BPA project, "Wallowa County Culvert Inventory") barrier culvert and replace it with a structure that will pass all aquatic species. There will be one structure replaced per year. Cost share dollars will be sought from appropriate sources for this work element. Sources such as the Grande Ronde Model Watershed Program, OWEB, ODFW R&E, and/or NOAA will be used for additional funding. (1 structure per year) 10/1/2006 9/30/2009 $265,000
Biological objectives
Determine Effective Restoration Approaches
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Reducing Sedimentation
Re-Open Historic Anadromous Habitat
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Road Treatments
Metrics
* # of miles of habitat accessed: TBD by specific structure replaced
* Does the structure remove or replace a fish passage barrier?: Yes
* Was barrier Full or Partial?: Full
Install Fish Screen Install Fish Screen on the Wallowa Valley Improvement Canal Irrigation Ditch As part of the project to remove the fish passage barrier associtated with this canal in upper Big Sheep Creek, it will also be necessary to install this fish screen. The screen will prevent federally listed fish from migrating down the ditch. Currently, the ditch is not screened, and there is not passage around the diversion structure (see narrative for detaisl). It is estimated that this will occur during FY08. This will be installed in cooperation with the ODFW Fish Screen Shop in Enterprise, OR. 12/1/2007 12/31/2008 $80,000
Biological objectives
Education/Outreach in Project Implementation
Re-Open Historic Anadromous Habitat
Restore Watershed Connectivity
Metrics
* Does the screen meet NOAA/FSOC specs?: Yes
* Is the screen New or a Replacement?: New
Remove/Install Diversion Remove & Reinstall Fish Passage Barrier Diversion Structures Remove one irrigation diversion that is currently fish passage barriers and rebuild the structure to accomodate passage to all aquatic species. There will be one structure replaced per year. 10/1/2006 9/30/2009 $450,000
Biological objectives
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Re-Open Historic Anadromous Habitat
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Metrics
Coordination Coordinate Restoration Efforts with Other Agencies As part of a collaborative effort to more holistically address restoration in Wallowa County, it will be essential to coordinate with other resource agencies and groups, as well as co-managers. This will also be done to coordinate project planning, implementation, monitoring and reporting to maximize efficiencies between projects and programs. 10/1/2006 9/30/2009 $65,000
Biological objectives
Determine Effective Restoration Approaches
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Protect Existing High Quality Habitat
Reduce Stream Temperatures
Reducing Sedimentation
Re-Open Historic Anadromous Habitat
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Road Treatments
Metrics
Identify and Select Projects Identify and select stream restoration project locations As part of the on-going, proposed project, potential restoration projects will arise. This will necessitate site visits and project selections. 10/1/2006 9/30/2009 $65,000
Biological objectives
Determine Effective Restoration Approaches
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Reduce Stream Temperatures
Reducing Sedimentation
Re-Open Historic Anadromous Habitat
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Road Treatments
Metrics
Identify and Select Projects Select specific culverts for replacement Using the priority list previously established, we will select individual culverts to replace for fish passage. This will necessitate performing additional site surveys, prior to implementation. 10/1/2006 9/30/2009 $35,000
Biological objectives
Determine Effective Restoration Approaches
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Reducing Sedimentation
Re-Open Historic Anadromous Habitat
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Road Treatments
Metrics
Manage and Administer Projects Manage All on-going restoration projects The project leader of this proposal will need to oversee all aspects of the restoration projects. This will inlcude supervising field crews, administrative aspects of the project (ie. contract preparation and oversight, reporting requirements, and etc), and seeking additional funding sources for further implementation efforts. In addition to the project leader, other personnel will be hired to oversee various project implementation activities. Thus, a portion of all implementation projects will be performed by the sponsor, while a portion will be contracted to appropriate companies (eg. culvert replacements). 10/1/2006 9/30/2009 $145,000
Biological objectives
Determine Effective Restoration Approaches
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Protect Existing High Quality Habitat
Reduce Stream Temperatures
Reducing Sedimentation
Re-Open Historic Anadromous Habitat
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Road Treatments
Metrics
Outreach and Education Education & Outreach to local community Provide educational opportunities for school children and other local, interested parties regarding restoration activities associated with this project. 10/1/2006 9/30/2009 $60,000
Biological objectives
Determine Effective Restoration Approaches
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Protect Existing High Quality Habitat
Reduce Stream Temperatures
Reducing Sedimentation
Re-Open Historic Anadromous Habitat
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Road Treatments
Metrics
* # of general public reached: Try to reach as many as possible
* # of students reached: Attempt to reach 25 students/year
* # of teachers reached: 4 from all 3 school districts in Wallowa County
Produce Design and/or Specifications Produce Engineering Designs for Project Implementation A staff engineer will produce all necessary designs for all projects implemented during this project. This will greatly speed up the implementation of all projects contained within this proposal. The metrics here would be the number per year. 10/1/2006 9/30/2009 $75,000
Biological objectives
Reduce Stream Temperatures
Reducing Sedimentation
Re-Open Historic Anadromous Habitat
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Metrics
Provide Technical Review Technical Review of Proposed Projects Project sponsor will need to review all projects sponsored by other agencies & groups for technical merrit prior to implementation. Further, the sponsor will have to review projects during implementation for technical merrit. This will also be closely linked to the coordination work element. The metrics here would be the number of projects reviewed per year. 10/1/2006 9/30/2009 $55,000
Biological objectives
Determine Effective Restoration Approaches
Education/Outreach in Project Implementation
Protect Existing High Quality Habitat
Re-Open Historic Anadromous Habitat
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Road Treatments
Metrics
Produce/Submit Scientific Findings Report Submit Status and Annual Reports to BPA Write and submit status and annual reports required by BPA. 12/1/2006 9/30/2009 $35,000
Biological objectives
Determine Effective Restoration Approaches
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Protect Existing High Quality Habitat
Reduce Stream Temperatures
Reducing Sedimentation
Re-Open Historic Anadromous Habitat
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Road Treatments
Metrics
Produce/Submit Scientific Findings Report Write and Present Findings to Appropriate Audience(s) The results of this project will be presented to appropriate audiences whenever the opportunity arises. This could include presenting posters, producing articles for publication in peer-reviewed journals and/or presenting information to other resource managers in any format that is appropriate. Although this work element includes all of the biological objectives, as it will use data and findings from all of them, the main objective will be focused on education and outreach. 12/1/2006 9/30/2009 $35,000
Biological objectives
Determine Effective Restoration Approaches
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Protect Existing High Quality Habitat
Reduce Stream Temperatures
Reducing Sedimentation
Re-Open Historic Anadromous Habitat
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Road Treatments
Metrics
Analyze/Interpret Data Analyze & Interpret Data for Project Effectiveness Monitoring Analyze and interpret the data collected (work element 157) and maintained (work element 160) as part of the on-going project effectiveness monitoring. 12/1/2006 9/30/2009 $35,000
Biological objectives
Determine Effective Restoration Approaches
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Reduce Stream Temperatures
Reducing Sedimentation
Re-Open Historic Anadromous Habitat
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Road Treatments
Metrics
Focal Area: Tributaries-see narrative for locations
Collect/Generate/Validate Field and Lab Data Data Collection for Project Implementation, and Implementation & Effectiveness Monitoring Collect pertinent data on all projects to determine the efffectiveness of implementing these projects. Additionally, inventory data related to noxious weeds will be collected. 12/1/2006 9/30/2009 $50,000
Biological objectives
Determine Effective Restoration Approaches
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Reduce Stream Temperatures
Reducing Sedimentation
Re-Open Historic Anadromous Habitat
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Road Treatments
Metrics
Focal Area: see narrative for specfic locations
Create/Manage/Maintain Database Manage & Maintain Database for all Collected Data A database will be managed and maintained for the data collected as part of work element No. 157. This will be done for all implementation work elements for this project. 12/1/2006 9/30/2009 $38,000
Biological objectives
Determine Effective Restoration Approaches
Inventory and Treatment of Noxious Weeds/Invasives
Reduce Stream Temperatures
Reducing Sedimentation
Re-Open Historic Anadromous Habitat
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Road Treatments
Metrics
Disseminate Raw/Summary Data and Results Data Transfer Raw and summary data will be shared with all partners involved with implementation of all projects. This will include reports to BPA, and other cost-share partners. It will also include sharing information on the StreamNet website, as well as sharing data with local school districts as part of the educational component. For a complete list of data transfer component, see attached narrative. 12/1/2006 9/30/2009 $35,000
Biological objectives
Determine Effective Restoration Approaches
Education/Outreach in Project Implementation
Inventory and Treatment of Noxious Weeds/Invasives
Reduce Stream Temperatures
Reducing Sedimentation
Re-Open Historic Anadromous Habitat
Restore Native Plant Communities
Restore Riparian Function & Channel Conditions
Restore Watershed Connectivity
Road Treatments
Metrics

Section 8. Budgets

Itemized estimated budget
ItemNoteFY07FY08FY09
Personnel This is the equivalent of 4.9 FTE's. However, this will include numerous personnel. There is a 3% COLA calculated into this for FY08 & FY09. $176,034 $186,596 $197,792
Fringe Benefits This is the total fringe benefits for the 4.9 FTE's for this project. There is a 3% COLA calculated into this for FY08 & FY09. $55,695 $59,036 $62,579
Supplies This is the estimated costs for this category over the 3 year period. This would include items like supplies, materials, equipment, repairs/maintenance and computers. There is approximately a 3% inflation rate calculated in for FY08 and FY09. $37,351 $38,471 $39,625
Travel There is about a 3% inflation rate calculated into the totals for FY08 & FY09. $10,980 $11,170 $11,366
Overhead This expense includes the indirect rate charges, telephone charges, utility costs, and computer services. Again, there is about a 3% inflation rate calculated into the totals for FY08 & FY09. $107,482 $110,833 $116,301
Other This includes contracted services, materials, vehicle rental fees, and construction costs associated with implementation of the work elements (see narrative section for further clarification). This includes items other than salary. There is about a 3% inflation calculated into this for outyears. $756,425 $756,368 $767,545
Totals $1,143,967 $1,162,474 $1,195,208
Total estimated FY 2007-2009 budgets
Total itemized budget: $3,501,649
Total work element budget: $3,501,649
Cost sharing
Funding source/orgItem or service providedFY 07 est value ($)FY 08 est value ($)FY 09 est value ($)Cash or in-kind?Status
EPA Project Salary Funding $0 $175,000 $175,000 Cash Under Development
Grande Ronde Model Watershed Program Project Implementation Funding (secured $44,994 this year for culvert replacement on Mahogany Creek) $100,000 $100,000 $100,000 Cash Under Development
Hell's Canyon Preservation Council Technical Expertise/Project Review $25,000 $25,000 $25,000 In-Kind Under Development
Learn & Serve America Project Implementation Funding (Education) $350,000 $350,000 $350,000 Cash Under Development
Local Volunteer Project Implementation Labor $25,000 $25,000 $25,000 In-Kind Confirmed
National Forest Foundation Project Implementation Funding $150,000 $150,000 $150,000 Cash Under Development
Natural Resources Advisory Committee Technical Expertise/Project Review $15,000 $15,000 $15,000 In-Kind Confirmed
NOAA Project Implementation Funding $50,000 $50,000 $50,000 Cash Under Development
ODFW Technical Expertise/Project Review $20,000 $20,000 $20,000 In-Kind Under Review
ODFW Restoration & Enhancement Project Implementation Funding $75,000 $75,000 $75,000 Cash Under Development
OWEB Project Implementation Funding $75,000 $75,000 $75,000 Cash Under Development
USDA- Forest Service Technical Expertise/O&M on projects/cost-share dollars $100,000 $100,000 $100,000 In-Kind Under Review
USFWS Project Implementation Funding $50,000 $50,000 $50,000 Cash Under Development
Various Other Foundations Project Implementation Funding $25,000 $25,000 $25,000 Cash Under Development
Volunteer Labor Project Implementation Labor $25,000 $25,000 $25,000 In-Kind Under Development
Wallowa Resources Project Implementation Funding $50,000 $50,000 $50,000 Cash Under Development
Wildlands CPR Technical Expertise/Project Review $15,000 $15,000 $15,000 In-Kind Confirmed
Totals $1,150,000 $1,325,000 $1,325,000

Section 9. Project future

FY 2010 estimated budget: $1,243,016
FY 2011 estimated budget: $1,243,016
Comments: The work elements contained in this document will continue into 2010 & 2011 and beyond. This proposal is an attempt to get started on some of the key issues outlined in the subbasin plan and other documents. There's more work than can get done.

Future O&M costs: All maintenance costs associated with this proposal will be conducted by other agencies, such as the Forest Service. There will be restoration implementation activities that will occur for an undetermined length of time. They will not require additional operation or manitenance costs as part of this proposal, beyond the conclusion of implementation (except for the maintenance performed by other entities).

Termination date: TBD
Comments: This project will be terminated at such a time as all of the biological objectives delineated within this proposal are satisfactorily met. This will be some time in the future, which cannot be determined at this time. There is enough work within this watershed to keep this project active and productive for years to come. The NPT Watershed Division has planned projects through at least 2011. Because it not possible to predict that far into the future (including budget issues), the exact locations and projects have not been identified past FY09. However, NPT plans to continue with this project until all watershed conditions are in as close as possible to their historic conditions.

Final deliverables: Ultimately, the deliverables will be a restored watershed, with functional and productive riparian zones, access for anadromous salmonids to all tributary habitats, educated and knowledgeable land stewards, near natural stream flows and very limited impacts due to noxious weeds. If these conditions are met, then the ultimate goal of all resource managers will be met: productive, healthy, self-sustaining and naturally reproducing fish (resident and anadromous) populations.

Section 10. Narrative and other documents


Reviews and recommendations

FY07 budget FY08 budget FY09 budget Total budget Type Category Recommendation
NPCC FINAL FUNDING RECOMMENDATIONS (Oct 23, 2006) [full Council recs]
$0 $0 $0 $0 Expense ProvinceExpense Do Not Fund
NPCC DRAFT FUNDING RECOMMENDATIONS (Sep 15, 2006) [full Council recs]
$0 $0 $0 $0 ProvinceExpense

ISRP PRELIMINARY REVIEW (Jun 2, 2006)

Recommendation: Response requested

NPCC comments: Under proposal 200710500, extensive general comments and concerns on this set of four related proposals are given that need to be addressed in the sponsor’s response to the ISRP. The sponsor should also address the specific comments on each proposal. Comments specific to this proposal: In this Imnaha proposal, five miles of road are going to be decommissioned each year for a total price tag of $154,649. This seems unrealistically low, particularly since maintaining existing roads at 1.0 mile per year costs $225,000. Is cost estimate based on experience or recent bids?


ISRP FINAL REVIEW (Aug 31, 2006)

Recommendation: Response requested

NPCC comments: (Although this proposal did not participate in the fix-it loop, for full comments on "restore and protect" type projects, please see heading “General comments concerning Nez Perce Tribe proposals to protect and restore various watersheds” at the beginning of the ISRP comments on project # 199607702, Protect & Restore Lolo Creek Watershed. The comments below are from the ISRP’s June 2006 preliminary review of this proposal.) Under proposal 200710500, extensive general comments and concerns on this set of four related proposals are given that need to be addressed in the sponsor’s response to the ISRP. The sponsor should also address the specific comments on each proposal. Comments specific to this proposal: In this Imnaha proposal, five miles of road are going to be decommissioned each year for a total price tag of $154,649. This seems unrealistically low, particularly since maintaining existing roads at 1.0 mile per year costs $225,000. Is cost estimate based on experience or recent bids?