FY07-09 proposal 200737900
Jump to Reviews and Recommendations
Section 1. Administrative
Proposal title | Surveying Jobs that Depend on the Existence of Lower Snake River Reservoirs |
Proposal ID | 200737900 |
Organization | bluefish.org |
Short description | It is proposed here that a thorough survey be performed to investigate the current level of employment that is dependent upon the continued existence of the Lower Snake Reservoirs. |
Information transfer | A report of all results will be submitted to Northwest Power and Conservation Council, federal Action Agencies, States and Tribes. |
Proposal contact person or principal investigator |
Contacts
Contact | Organization | |
---|---|---|
Form submitter | ||
Scott Levy | bluefish.org | redfish@bluefish.org |
All assigned contacts |
Section 2. Locations
Province / subbasin: Mainstem/Systemwide / Systemwide
Latitude | Longitude | Waterbody | Description |
---|
Section 3. Focal species
primary: All Anadromous SalmonidsSection 4. Past accomplishments
Year | Accomplishments |
---|
Section 5. Relationships to other projects
Funding source | Related ID | Related title | Relationship |
---|
Section 6. Biological objectives
Biological objectives | Full description | Associated subbasin plan | Strategy |
---|---|---|---|
[BO Title left blank] | [BO Description left blank] | None | [Strategy left blank] |
Section 7. Work elements (coming back to this)
Work element name | Work element title | Description | Start date | End date | Est budget |
---|---|---|---|---|---|
Other | [Work Element Title Not Entered] | [Work Element Description Not Entered] | 1/1/2007 | 1/1/2008 | $10,000 |
Biological objectives |
Metrics |
Section 8. Budgets
Itemized estimated budget
Item | Note | FY07 | FY08 | FY09 |
---|---|---|---|---|
Personnel | [blank] | $10,000 | $0 | $0 |
Totals | $10,000 | $0 | $0 |
Total estimated FY 2007-2009 budgets
Total itemized budget: | $10,000 |
Total work element budget: | $10,000 |
Cost sharing
Funding source/org | Item or service provided | FY 07 est value ($) | FY 08 est value ($) | FY 09 est value ($) | Cash or in-kind? | Status |
---|---|---|---|---|---|---|
Totals | $0 | $0 | $0 |
Section 9. Project future
FY 2010 estimated budget: $0 FY 2011 estimated budget: $0 |
Comments: [Outyear comment field left blank] |
Future O&M costs:
Termination date:
Comments:
Final deliverables:
Section 10. Narrative and other documents
Reviews and recommendations
FY07 budget | FY08 budget | FY09 budget | Total budget | Type | Category | Recommendation |
---|---|---|---|---|---|---|
NPCC FINAL FUNDING RECOMMENDATIONS (Oct 23, 2006) [full Council recs] | ||||||
$0 | $0 | $0 | $0 | Expense | Basinwide | Do Not Fund |
NPCC DRAFT FUNDING RECOMMENDATIONS (Sep 15, 2006) [full Council recs] | ||||||
$0 | $0 | $0 | $0 | Basinwide |
ISRP PRELIMINARY REVIEW (Jun 2, 2006)
Recommendation: Not fundable
NPCC comments: This is an inadequate proposal. It presents an inadequate description of survey methods and does not demonstrate relevance of the survey information. No explanation or itemization of the $10k budget is provided. The background section duplicates information presented in other proposals from this sponsor. It discusses different perspectives on the problem of Snake River juvenile salmon mortality and the question of improving survival. It provides extensive excerpts from the US Army Corps of Engineers’ report "Lower Snake River Juvenile Salmon Migration Feasibility" to demonstrate that although dam breaching is identified by the Corps as a less preferable alternative to major system improvement, it may become a more realistic alternative if adaptive migration efforts are not successful. This proposal is to provide a survey of jobs dependent on the continued existence of Snake River Reservoirs, in preparation for the contingency of dam breaching. The rationale is based on citations of Court findings and the 2000 BiOp RPAs 147 and 148 describing the Corps’ responsibilities for developing project management plans and engineering and design work. Also included are extensive excerpts from the Lower Snake and Salmon Subbasin Plans, including the vision and strategies designed to achieve objectives related to terrestrial species and habitats. These include reference to the Snake River dams but don't appear to have direct relevance to the work proposed here. Nothing presented here is specifically related to the question of job loss. The objective is stated as "expanding the list of alternatives to be considered in a reevaluation study which would follow a failed check-in..." However, it is not clear how an employment survey would expand the opportunities except for the brief mention of the utility of clarifying the economic costs of dam breaching. The methods are described in inadequate detail. From the detail provided, however, it is clear that the proposed approach does not represent good survey design, would not provide representative sampling, and would generate biased results. A similar survey is referenced but not cited.
ISRP FINAL REVIEW (Aug 31, 2006)
Recommendation: Not fundable
NPCC comments: This is an inadequate proposal. It presents an inadequate description of survey methods and does not demonstrate relevance of the survey information. No explanation or itemization of the $10k budget is provided. The background section duplicates information presented in other proposals from this sponsor. It discusses different perspectives on the problem of Snake River juvenile salmon mortality and the question of improving survival. It provides extensive excerpts from the US Army Corps of Engineers’ report "Lower Snake River Juvenile Salmon Migration Feasibility" to demonstrate that although dam breaching is identified by the Corps as a less preferable alternative to major system improvement, it may become a more realistic alternative if adaptive migration efforts are not successful. This proposal is to provide a survey of jobs dependent on the continued existence of Snake River Reservoirs, in preparation for the contingency of dam breaching. The rationale is based on citations of Court findings and the 2000 BiOp RPAs 147 and 148 describing the Corps’ responsibilities for developing project management plans and engineering and design work. Also included are extensive excerpts from the Lower Snake and Salmon Subbasin Plans, including the vision and strategies designed to achieve objectives related to terrestrial species and habitats. These include reference to the Snake River dams but don't appear to have direct relevance to the work proposed here. Nothing presented here is specifically related to the question of job loss. The objective is stated as "expanding the list of alternatives to be considered in a reevaluation study which would follow a failed check-in..." However, it is not clear how an employment survey would expand the opportunities except for the brief mention of the utility of clarifying the economic costs of dam breaching. The methods are described in inadequate detail. From the detail provided, however, it is clear that the proposed approach does not represent good survey design, would not provide representative sampling, and would generate biased results. A similar survey is referenced but not cited.