Section 1. General Administrative Information

Title of Project Proposal Analyze Ahtanum Creek Storage Project
BPA Project Proposal Number 9164
Business name of agency, institution,
or organization requesting funding
Ahtanum Irrigation District
Business acronym (if appropriate) AID
 

Proposal contact person or principal investigator

Name George D. Marshall
Mailing Address P.O. Box 786
City, State, Zip Moxee WA 98936
Phone 5092490226
Fax 5092490226
E-mail
 
Manager of program authorizing this project
 
Review Cycle FY 1999
Province Lower Mid-Columbia
Subbasin Yakima
 
Short Description Complete design and permitting of a multipurpose storage reservoir in the Ahtanum Creek watershed. Potential beneficiaries of the project will include: AILD waterusers, Wapato Irrigation Project waterusers, fisheries, wildlife habitat, and recreation.
Target Species


Project Location

[No information]


Reasonable and Prudent Alternatives (RPAs)

Sponsor-Reported Relevant RPAs

Sponsor listed no RPAs for this project proposal

Relevant RPAs based upon NMFS & BPA Review

NMFS and BPA did not associate any reasonable and prudent alternatives with this project proposal


NPPC Program Measure Number(s) which this project addresses:
FWS/NMFS Biological Opinion Number(s) which this project addresses:
Other Planning Document References


CBFWA-Generated Information

Database Administrator notes on the history of this proposal form: None
Type of Project (assigned by CBFWA Analysts): anadromous


Section 2. Past Accomplishments

n/a or no information


Section 3. Relationships to Other Projects

n/a or no information


Section 4. Objectives, Tasks and Schedules

Objectives and Tasks

Objective Task
1. Field Control Survey a. Topographic Survey
2. Geotechnical Exploration b. Drilling and Sampling
3. Soil and Rock Analyses c. Laboratory Testing
4. Geotechnical Evaluation d. Geotechnical Calculations
5. Seismic Evaluation e. Earthquake and Fault Study
6. Hydrologic Evaluation f. Hydrologic Calculations
7. Environmental Review g. NEPA/SEPA Check List
8. Environmental Impact h. Environmental Impact Study
9. Cultural Resources i. Cultural Survey
10. Threatened/Endangered Species j. Species Survey
11. Public Involvements k. Notices and Meetings
12. Dam Design l. Civil and Structural Design
13. Instrumentation m. Instrument Type Selection
14. Emergency Overflow n. Spillway Analysis and Design
15. Intake and Outlet o. Structural and Mechanical Design
16. Diversion Control p. Civil and Hydraulics Design
17. Seepage Control q. Foundation Cutoff Design
18. Delivery System Crossover r. Mechanical and Electrical
19. Design Documentation s. Technical Memoranda
20. Design Communications t. Review Meetings and Phone Calls
21. Regulatory Permitting u. Agency Meetings and Forms
22. Construction Drawings v. Auto CAD Drafting and Design
23. Technical Specifications w. Materials and Performance
24. Bidding and Contracting x. Prepare Documents
25. Value Engineering y. Cost Reduction Review
26. Construction Costs z. Develop Cost Estimates
27. Dam Breach Impact #. Breach Analysis
28. Breach Flood Impact %. Inundation Map
29. Project Management *. Manage Tasks
30. Project Administration +. Administer Funds`

Objective Schedules and Costs

Objective Start Date End Date Measurable Biological Objectives Milestone FY 2000 Cost %
1 03/01/99 06/01/99 3.9%
2 04/01/99 05/01/99 11.1%
3 05/01/99 06/01/99 1.7%
4 04/01/99 06/01/99 1.4%
5 01/01/99 02/01/99 0.9%
6 01/01/99 04/01/99 6.5%
7 01/01/99 02/01/99 0.7%
8 02/01/99 12/01/99 17.1%
9 02/01/99 10/01/99 3.4%
10 02/01/99 10/01/99 0.8%
11 04/01/99 10/01/99 3.4%
12 05/01/99 08/01/99 2.9%
13 08/01/99 09/01/99 0.4%
14 06/01/99 08/01/99 0.9%
15 06/01/99 08/01/99 1.7%
16 04/01/99 06/01/99 1.7%
17 07/01/99 08/01/99 0.9%
18 07/01/99 08/01/99 0.9%
19 01/01/99 12/01/99 1.2%
20 01/01/99 12/01/99 2.5%
21 01/01/99 12/01/99 5.1%
22 05/01/99 10/01/99 6.8%
23 07/01/99 10/01/99 1.1%
24 10/01/99 12/01/99 1.2%
25 08/01/99 10/01/99 1.6%
26 08/01/99 12/01/99 0.9%
27 09/01/99 10/01/99 0.7%
28 09/01/99 10/01/99 0.3%
29 01/01/99 12/01/99 8.2%
30 01/01/99 12/01/99 9.7%


Section 5. Estimated Budget Summary

Itemized Budget

Item Note FY 1999 Cost
Personnel AID Staff $284,000
Subcontractor TBA $2,637,000
Total Itemized Budget $2,921,000


Total estimated budget

Total FY 1999 project cost $2,921,000
Amount anticipated from previously committed BPA Funds $ 0
Total FY 1999 budget request $2,921,000
FY 1999 forecast from 1998 $ 0
% change from forecast 0.0%


Reason for change in estimated budget

Not applicable


Reason for change in scope

Not applicable


Cost Sharing

Not applicable
 

Outyear Budget Totals

Not applicable  

Other Budget Explanation

Schedule Constraints: The project will be affected by the ability of reviewing agencies to develop policies and define required compliance procedures.


Section 6. References

n/a or no information


Section 7. Abstract

Abstract

The Ahtanum Irrigation District (AID) has identified the need to develop additional water supplies for various users within the Ahtanum Creek watershed. The proposed multipurpose water storage project would provide a reliable supply to: AID waterusers, Wapato Irrigation Project users, fisheries, and wildlife habitat. In addition, the project would provide limited amounts of flood control, fire protection and recreation. The reservoir is expected to have a storage capacity of approximately 20,000 acre feet and would be located in a small sub-basin adjacent to Ahtanum Creek.