Return to Proposal Finder FY 2000 Proposal 199603201

Proposal Table of Contents

Additional Documents

Section 1. General Administrative information
Section 2. Past accomplishments
Section 3. Relationships to other projects
Section 4. Objectives, tasks and schedules
Section 5. Budget
Section 6. References
Section 7. Abstract

Reviews and Recommendations
Title Type File Size File Date


Section 1. General Administrative Information

Title of Project Proposal Begin Implementation of Year 1 of the K Pool Master Plan Program
BPA Project Proposal Number 199603201
Business name of agency, institution,
or organization requesting funding
Yakama Indian Nation
Business acronym (if appropriate) YN
 

Proposal contact person or principal investigator

Name Paul Ward
Mailing Address Yakama Indian Nation Fisheries Resource Management Program P.O. Box 151
City, State, Zip Toppenish, WA 98948
Phone 5098656262
Fax 5098656293
E-mail ward@yakama.com
 
Manager of program authorizing this project
 
Review Cycle FY 2000
Province Mainstem/Systemwide
Subbasin Systemwide
 
Short Description Develop a long-term program of artificial propagation of white sturgeon for supplementation purposes using the Hanford K Pools
Target Species White Sturgeon


Project Location

[No information]


Reasonable and Prudent Alternatives (RPAs)

Sponsor-Reported Relevant RPAs

Sponsor listed no RPAs for this project proposal

Relevant RPAs based upon NMFS & BPA Review

NMFS and BPA did not associate any reasonable and prudent alternatives with this project proposal


NPPC Program Measure Number(s) which this project addresses: NPPC 1994 FWP 7.4J.4
FWS/NMFS Biological Opinion Number(s) which this project addresses: NMFS Biological Opinion, Consultation Number [383] approved the YIN Hanford K Pools supplementation program.
Other Planning Document References Wy-Kan-Ush-Mi Wa-Kish-Wit: Spirit of the Salmon “Implement and refine methods for artificial propagation of white sturgeon using settling basins at the Hanford K [facilities] and other appropriate facilities”


CBFWA-Generated Information

Database Administrator notes on the history of this proposal form: Contact info updated from Council, 11/10/03
Type of Project (assigned by CBFWA Analysts): anadromous


Section 2. Past Accomplishments

Year Accomplishment
1993 to 1998 several hundred white sturgeon were cultured by the YIN using the Hanford K Pools
1993 WDFW feasibility/demonstration acclimation of 150,000 up-river bright fall chinook salmon at Hanford K Pools
1994 YIN conducted acclimation and release of 500,000 URB FCS into the Hanford Reach of the Columbia River
1995 YIN conducted acclimation and release of 700,000 URB FCS into the Hanford Reach of the Columbia River
1996 YIN conducted acclimation and release of 700,000 URB FCS into the Hanford Reach of the Columbia River
1997 AquaGen Engineers designed a continuously flowing water system for improved K Pool system


Section 3. Relationships to Other Projects

n/a or no information


Section 4. Objectives, Tasks and Schedules

Objectives and Tasks

Objective Task
1. Continue whitesturgeon broodstock development activities utilizing the K Pools a. Complete white sturgeon broodstock development systems installation including river water flow-through rearing tanks, pilot scale heated water recirculation system and repairs to K Pool infracture.
1. b. In cooperation with appropriate agencies and co-managers, conduct test of alternative approaches for acclimation and “domestication” of captured sub-adults to be reared for broodstock.
1. c. In cooperation with appropriate agencies and co-managers, continue program of capture and transfer of sub-adult white sturgeon to build a population of broodstock.
2. Complete preparation of a proposal for a new white sturgeon propagation facility a. Complete preliminary design of a new facility and submit for review, approval and funding.
2. b. Complete selection of and integration of additional sites into a program for interim and/or ongoing use in conducting all phases of white sturgeon propagation activities.
3. Prepare NEPA documentation covering the full program of white sturgeon propagation .

Objective Schedules and Costs

Objective Start Date End Date Measurable Biological Objectives Milestone FY 2000 Cost %
1 10/01/99 09/01/00 73.0%
2 10/01/99 09/01/00 23.0%
3 10/01/99 09/01/00 4.0%


Section 5. Estimated Budget Summary

Itemized Budget

Item Note FY 2000 Cost
Personnel $ 29,496
Fringe $ 7,462
Supplies $ 66,798
Operating The sum of all items not capital $ 0
Capital $ 48,276
NEPA Distributed among travel, subcontracts and indirect $ 0
Construction Application of generic facility design to selected site of new facility $ 28,350
PIT tags 500 $ 1,450
Travel $ 8,200
Indirect $ 80,273
Subcontractor GTS Duratek, Owsley $ 71,000
Subcontractor Anderson $ 15,000
Subcontractor Herborn $ 10,000
Subcontractor Macy $ 15,000
Subcontractor Forster $ 7,000
Subcontractor Yakama Industries $ 39,768
Total Itemized Budget $428,073


Total estimated budget

Total FY 2000 project cost $428,073
Amount anticipated from previously committed BPA Funds $ 0
Total FY 2000 budget request $428,073
FY 2000 forecast from 1999 $ 0
% change from forecast 0.0%


Reason for change in estimated budget

Not applicable


Reason for change in scope

Not applicable


Cost Sharing

Not applicable
 

Outyear Budget Totals

2002 2003 2004
All Phases $ 1,340 $ 1,205 $ 1,100
Total Outyear Budgets $ 1,340 $ 1,205 $ 1,100
 

Other Budget Explanation

Schedule Constraints: Hanford water use permit, NEPA and NPDES permit compliance must be addressed. U.S. Department of Energy (USDOE) concurrence is required: USDOE and YIN must enter into a property lease agreement. U.S. EPA concurrence is required


Section 6. References

Reference Watershed?
Blodgett, J., 1994, Yakama Indian Nation 1994 K Basin Fall Chinook Acclimation Project, Draft Report to the U.S. Department of Energy, Richland, Washington. No
CRITFC, 1996, WY-KAN-USH-MI WA-KISH-WIT: Spirit of the Salmon, The Columbia River Anadromous Fish Restoration plan of the Nez Perce, Umatilla, Warm Springs, and Yakama Tribes, Columbia River Inter-Tribal Fish Commission, Portland, Oregon. No
Dauble, D. D., C. S. Abernethy, H. E. Westerdahl, and B. N. Anderson, 1993, K Basin Salmon Rearing Project, Letter Report to Howard Massey, Pacific Northwest Laboratory, Richland, Washington. No
DeVore, J. D., B. W. James, C. A. Tracy, and D. H. Hale, 1993, Dynamics and Potential Production of White Sturgeon in the Columbia River Downstream from Bonneville Dam, Report G in Status & Habitat Requirements of White Sturgeon Populations in the Columbi No
DeVore, J. D., B. W. James, C. A. Tracy, and D. H. Hale, 1995a, Dynamics and Potential Production of White Sturgeon in the Unimpounded Lower Columbia River, Transactions of the American Fisheries Society 124:845-856. No
Hale, D. H., and B. W. James, 1993, Recreational and Sport Fisheries in the Columbia River Between Bonneville and McNary Dams, Report Q in Status & Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, Volume No
Hatcher, L., Fiander, W., and Blodgett, J., 1999, In Press, Master Plan for Acclimation and Artificial Propagation of Salmonids and White Sturgeon at the Hanford Site K Pool Facilities, Prepared for Bonneville Power Administration, Portland, Oregon. No
Herborn, D. I., 1995, Contamination-Free Nature of Hanford 100-K Area Water Purification Pools, WHC-MR-0513, Westinghouse Hanford Company, Richland, Washington. No
Herborn, D. I., 1997, 1996-97 Annual Report, Yakama Indian Nation Hanford K Pool Acclimation and Artificial Propagation Program, (For period June 1, 1996 through May 31, 1997), contract 96-BI-94489, Bonneville Power Administration, Portland, Oregon. No
ISRP, 1998, Review of the Columbia River Basin Fish and Wildlife Program for Fiscal Year 1999 as Directed by the 1996 Amendment to the Northwest Power Act, Report 98-1 of the Independent Scientific Review Panel for the Northwest Power Planning Council, Po No
Parsley, M. J., P. J. Anders, A. I. Miller, L. G. Beckman, and G. T. McCabe, Jr., 1993, Factors Affecting Spawning and Recruitment of White Sturgeon in the Columbia River Downstream from McNary Dam, Report C in Status & Habitat Requirements of White Sturg No
PSMFC, 1992, White Sturgeon Management Framework Plan, Report of the White Sturgeon Planning Committee of the Pacific States Marine Fisheries Commission, Portland, Oregon. No


Section 7. Abstract

Abstract


Reviews and Recommendations

This information was not provided on the original proposals, but was generated during the review process.

This project has not yet been reviewed

Return to top of page