Section 1. General Administrative information
Section 2. Past accomplishments
Section 3. Relationships to other projects
Section 4. Budgets for planning/design phase
Section 5. Budgets for construction/implementation phase
Section 6. Budgets for operations/maintenance phase
Section 7. Budgets for monitoring/evaluation phase
Section 8. Budget Summary

Reviews and Recommendations
No documents associated with this request


Section 1. General Administrative Information

Title of Project Proposal Evaluate Rainbow Trout/Habitat Improvements Of Tribs. To Lake Roosevelt
BPA Project Proposal Number 199001800
Business name of agency, institution,
or organization requesting funding
Confederated Tribes of the Colville Indian Reservation
Business acronym (if appropriate) CCT
 

Proposal contact person or principal investigator

Name Sheryl Sears
Mailing Address P.O. Box 150
City, State, Zip Nespelem, WA. 99155
Phone 5096342118
Fax 5096342126
E-mail sheri.sears@colvilletribes.com
 
Manager of program authorizing this project
 
Review Cycle FY 2001 Ongoing
Province Inter-Mountain
Subbasin San Poil
 
Short Description Increase the quality and quantity of spawning and rearing habitat in selected streams that drain into Lake Roosevelt by eliminating migration barriers, improving riparian conditions, and improving instream habitat.
Target Species


Project Location

[No information]


Reasonable and Prudent Alternatives (RPAs)

Sponsor-Reported Relevant RPAs

Sponsor listed no RPAs for this project proposal

Relevant RPAs based upon NMFS & BPA Review

NMFS and BPA did not associate any reasonable and prudent alternatives with this project proposal


Biological Outcomes of this project: Increased population of adfluvial rainbow trout in San Poil River and Lake Roosevelt Systems. Approximately five hundred feet of restored riparian habitat on Bridge Creek.
Biological Data: 1. Jones, Charles. and Hunner, Walt. 1996. Hydrology Section; Colville Reservation Integrated Resource Management Plan- Phase I. Colville Confederated Tribes. 2. Jones, Charles. 1998a. Fisheries section in the Colville Confederated Tribes Integrated Resource Management Plan- Phase II. Colville Confederated Tribes. 3. Jones, Charles D. 1998b. Lake Roosevelt Annual Report, 1997. BPA Project 9001800. Colville Confederated Tribes. 4. Jones, Charles D. 1999a. Lake Roosevelt Phase II Completion Report. BPA Project 9001800. Colville Confederated Tribes. 5. Jones, Charles D. 1999b. Lake Roosevelt Annual Report, 1998. BPA Project 9001800. Colville Confederated Tribes. 6. LeCaire, Richard. 1999. Lake Roosevelt Phase I Completion Report, 1998. BPA Project 9001800. Colville Confederated Tribes.


CBFWA-Generated Information

Database Administrator notes on the history of this proposal form: Contact info updated from Council, 11/10/03
Type of Project (assigned by CBFWA Analysts): resident


Section 2. Past Accomplishments

Year Accomplishment
1990 Fish habitat assessment on 13 streams.
1990 Fish population census on above streams (13 streams).
1991 Fish habitat assessment on 14 streams.
1991 Fish population census on above streams (14 streams).
1992 Analyzed barriers to fish migration on 5 project streams (Blue, N. Nanamkin, S. Nanamkin, Iron and Louie).
1992 Designed meander structures for North and South Nanamkin Creeks.
1993 Culvert/passage barrier on North Nanamkin repaired (culvert replaced).
1994 Culvert/passage barrier on Louie Creek repaired (1 culvert replaced).
1994 Culvert/passage barrier on Iron Creek repaired (3 culverts replaced).
1994 6000+ shrubs planted on project streams.
1994 Approximately 4.5 miles of fence installed around sections of North and South Nanamkin Creeks for riparian protection.
1994 1993 through 1995 installed approximately 125 instream structures.
1994 Approximately 150 meters of channel meanders/bank stabilization structures installed (North and South Nanamkin).
1995 Culvert/passage barrier on South Nanamkin repaired (culvert replaced with arch).
1995 Approximately 350 meters of channel meanders/bank stabilization structures installed (North and South Nanamkin).
1995 Constructed/repaired irrigation diversion structures and stream banks on South Nanamkin.
1996 Horizontal stream surveys on the 5 project streams.
1996 Population estimates of juvenile adfluvial rainbow trout.
1996 Adult spawning escapement and juvenile outmigration surveys (trapping).
1997 Horizontal stream surveys on the 5 project streams.
1997 Population estimates of juvenile adfluvial rainbow trout.
1997 Adult spawning escapement and juvenile outmigration surveys (trapping).
1998 Horizontal stream surveys on the 5 project streams.
1998 Population estimates of juvenile adfluvial rainbow trout.
1998 Adult spawning escapement and juvenile outmigration surveys (trapping).
1998 Complete Phase I Report
1999 Horizontal stream surveys on the 5 project streams.
1999 Population estimates of juvenile adfluvial rainbow trout.
1999 Adult spawning escapement and juvenile outmigration surveys (trapping).
1999 Complete Phase II Report
2000 Horizontal stream surveys on the 5 project streams.
2000 Population estimates of juvenile adfluvial rainbow trout.
2000 Adult spawning escapement and juvenile outmigration surveys (trapping).
2000 FY 1999 Annual Report with data and statistical analysis and pictorial booklet of project.


Section 3. Relationships to Other Projects

n/a or no information


Section 4. Budget for Planning and Design Phase

Task-based Budget

Objective Task Duration in FYs Estimated 2001 cost Subcontractor
1. Improve/create passage for rainbow trout in Bridge Creek. a. Create a cooperative landowner/agency agreement for Bridge Creek. 1 $ 22,200  
1. b. Design/engineer new channel 1 $ 25,150  
1. c. Design/engineer new channel 1 $ 14,900 x
1. c. Design/engineer road crossing 1 $ 7,450 x
1. d. Develop contract(s) for bids/implementation. 1 $ 7,450  
1. e. NEPA 1 $ 7,450 x
1. f. Baseline adult fish trapping in spring before implementation. 1 $ 18,640  
1. g. Electroshock/population estimates in area to be affected. 1 $ 9,001  
1. h. Baseline survey habitat. 1 $ 9,973  
2. Create passage where manmade barriers now exist in the Lake Roosevelt Watershed. a. Research federal, state and county agencies for previous inventories of culverts and/or fish barriers. 1 $ 4,450  
2. b. Design systematic inventory system for culverts/barriers. 1 $ 2,450  
2. c. GPS or digitize all information on Tribal GIS system. 5 $ 13,450  
2. d. Create cooperative agreements or MOAs with local agencies that may assist with passage improvements. 2 $ 1,450  
2. e. Acquire culvert passage designs and manuals that are available. 1 $ 500  
2. f. Acquire necessary training for basic design techniques and estimating. 2 $ 2,500  
2. g. Trap adult fish in spring before implementation. 10 $ 0  
2. h. Electroshock/population estimates in area to be affected. 10 $ 0  
2. i. Baseline survey habitat. 10 $ 0  


Outyear Objective-Based Budget

n/a or no information


Outyear Budgets for Planning and Design Phase

FY 2004 FY 2005 FY 2002 FY 2003
$ 58,500 $ 58,500 $ 58,500 $ 58,500


Section 5. Budget for Construction and Implementation Phase

Task-based Budget

Objective Task Duration in FYs Estimated 2001 cost Subcontractor
1. Improve/create passage for rainbow trout in Bridge Creek. a. Install culvert/bridge. 1 $ 0 x
1. b. Re-create original stream channel and floodplain. 1 $ 0 x
1. c. Plant cuttings/plants. 1 $ 0  
1. d. Acquire offsite solar water unit 1 $ 0  
1. e. Build riparian area fence. 1 $ 0  
2. Create passage where manmade barriers now exist in the Lake Roosevelt Watershed. a. Inventory passage barriers (GPS, photos and data sheet) in the San Poil River Subbasin. 2 $ 46,605  
2. b. Inventory passage barriers in the Lake Roosevelt Subbasin 8 $ 0  
2. c. Install culverts/bridges/passage improvements. 10 $ 0 x


Outyear Objective-Based Budget

n/a or no information


Outyear Budgets for Construction and Implementation Phase

FY 2004 FY 2005 FY 2002 FY 2003
$100,000 $100,000 $250,000 $100,000


Section 6. Budget for Operations and Maintenance Phase

Task-based Budget

Objective Task Duration in FYs Estimated 2001 cost Subcontractor
1. Improve/create passage for rainbow trout in Bridge Creek. a. Contract/TERO compliance 1 $ 0  
1. b. Report writing. 3 $ 4,000  
c. Meetings with BPA, CBFWA, NWPPC. 3 $ 1,400  
2. Create passage where manmade barriers now exist in the Lake Roosevelt Watershed. a. Contract/TERO compliance 10 $ 0  
2. b. Report writing. 10 $ 0  
2. c. Meetings with BPA, CBFWA, NWPPC. 10 $ 0  


Outyear Objective-Based Budget

n/a or no information


Outyear Budgets for Operations and Maintenance Phase

FY 2004 FY 2005 FY 2002 FY 2003
$ 10,000 $ 10,000 $ 10,000 $ 10,000


Section 7. Budget for Monitoring and Evaluation Phase

Task-based Budget

Objective Task Duration in FYs Estimated 2001 cost Subcontractor
1. Improve/create passage for rainbow trout in Bridge Creek. a. Trap adult fish in spring for two years after implementation. 2 $ 0  
1. b. Electroshock/population estimates in affected area annually for 2 years. 2 $ 0  
1. c. Survey habitat after improvements for 2 years. 2 $ 0  
2. Create passage where manmade barriers now exist in the Lake Roosevelt Watershed. a. Trap adult fish in spring after passage improvements. 10 $ 0  
2. b. Electroshock/population estimates in affected area 1-3 months after juvenile emergence. 10 $ 0  
c. Survey habitat before and after improvements (approx. 200 meters above and below crossing). 10 $ 0  


Outyear Objective-Based Budget

n/a or no information


Outyear Budgets for Monitoring and Evaluation Phase

FY 2004 FY 2005 FY 2002 FY 2003
$100,000 $100,000 $ 40,000 $100,000


Section 8. Estimated Budget Summary

Itemized Budget

Item Note FY 2001 Cost
Personnel FTE: 2.0 in 2001 $ 63,440
Fringe $ 17,387
Supplies $ 10,504
Travel $ 22,000
Indirect $ 26,143
NEPA $ 7,540
Subcontractor NRCS $ 0
Personnel FTE: 1.5 in 2001 $ 18,520
Fringe $ 5,786
Supplies $ 9,000
Travel $ 7,000
Indirect $ 6,299
Personnel $ 2,000
Fringe $ 560
Supplies $ 1,056
Travel $ 1,000
Indirect $ 784
Total Itemized Budget $199,019


Total estimated budget

Total FY 2001 project cost $199,019
Amount anticipated from previously committed BPA Funds $ 0
Total FY 2001 budget request $199,019
FY 2001 forecast from 2000 $ 0
% change from forecast 0.0%


Reason for change in estimated budget

There was no projected FY2001 forecast because results and conclusions were not available to determine the effectiveness of the project. Additionally, the project selection and sub-basin planning process is a significant departure from previous project selection processes. Project results and conclusions show a positive benefit to fish, therefore a budget for the 2001 funding period is requested to retain project continuity and provide known benefits as a result of passage improvements.


Reason for change in scope

The proposal process change for FY2001, the conclusions in the 1999 Annual Report and the new project proposal funding process has led to extending this project. Data analysis had to be accomplished before requesting extension of the project. The analysis shows that passage improvements are successful for increasing habitat availability and use, whereas instream habitat improvements were inconclusive. Project streams have to this date have shown increases in fish density after the implementation of the project. Additional streams will be examined for passage barriers and habitat improvements; some of the streams were examined in 1990 and 1991 as part of this project. Monitoring has been altered such that more funding is used for assessment and improvements in 2001 and 2002.


Cost Sharing

Not applicable
 

Outyear Budget Totals

2002 2003 2004 2005
Planning and design $ 58,500 $ 58,500 $ 58,500 $ 58,500
Construction/implementation $250,000 $100,000 $100,000 $100,000
Operations and maintenance $ 10,000 $ 10,000 $ 10,000 $ 10,000
Monitoring and evaluation $ 40,000 $100,000 $100,000 $100,000
Total Outyear Budgets $358,500 $268,500 $268,500 $268,500
 

Other Budget Explanation

Not applicable


Reviews and Recommendations

This information was not provided on the original proposals, but was generated during the review process.

CBFWA Funding Recommendation Recommendation:
Date:
Jul 14, 2000
2001
$199,019
Comment:

NWPPC Funding Recommendation Recommendation:
Fund
Date:
Sep 13, 2000
2001
$193,619
Comment:
Project expansion should be determined in provincial review

NWPPC Funding Recommendation Recommendation:
Fund
Date:
Sep 20, 2003
2004 2005 2006
$358,500 $268,500 $268,500

Funding Category: Expense

Comment:

Project Sponsor Request for FY04-05 Recommendation:
Date:
Sep 20, 2003
2004 2005
$358,500 $608,000

Funding Category: Expense

Comment:
To complete implementation of the Bridge Creek Project additional design monies are needed for the lower section of the channel connecting passage to the San Poil River. Additional monies in 2004 will be needed to contract a engineer to oversee the on the ground implementation of the stabilization work on the 2556 feet of Bridge Creek starting from the new culvert on the Old State Road. The design for this stabilization is very detailed and complicated an engineer will be needed on site during the channel work to insure success. The additional monies in 2005 will allow for the implementation of the lower channel which will involve the construction of a new channel and outlet to the San Poil River. I have obtained grant money from Ferry County Conservation District to complete fencing and money from NRCS to do planting and off site watering troughs. I am working with the DOT on joint funding for replacement of culvert passage barriers on Highway 21 along the San Poil River. DOT has paid for the preliminary assessments and we are working on prioritization of culvert replacements. Implementation money will be needed to open passage to the priority tributaries.

NW Power and Conservation Council's FY 2006 Project Funding Review Funding category:
expense
Date:
May 2005
FY05 NPCC Start of Year:
$268,500
FY06 NPCC Staff Preliminary:
$268,500
FY06 NPCC July Draft Start of Year:
$268,500
Sponsor (Colville Confederated Tribes) Comments (Go to Original on NPCC Website):

Sponsor (Colville Confederated Tribes) Comments (Go to Original on NPCC Website):