Section 1. General Administrative information
Section 2. Past accomplishments
Section 3. Relationships to other projects
Section 4. Budgets for planning/design phase
Section 5. Budgets for construction/implementation phase
Section 6. Budgets for operations/maintenance phase
Section 7. Budgets for monitoring/evaluation phase
Section 8. Budget Summary

Reviews and Recommendations
No documents associated with this request


Section 1. General Administrative Information

Title of Project Proposal Evaluate Habitat Use and Population Dynamics of Lampreys in Cedar Creek
BPA Project Proposal Number 200001400
Business name of agency, institution,
or organization requesting funding
US Fish and Wildlife Service
Business acronym (if appropriate) USFWS
 

Proposal contact person or principal investigator

Name Travis Coley
Mailing Address 9317 Highway 99, Suite I
City, State, Zip Vancouver, WA 98665
Phone 3606967605
Fax 3606967968
E-mail Travis_Coley@fws.gov
 
Manager of program authorizing this project
 
Review Cycle FY 2001 Ongoing
Province Lower Columbia
Subbasin Lewis
 
Short Description With emphasis on Pacific lampreys, identify and quantitatively evaluate populations of lampreys and their habitats in a stream below Bonneville Dam.
Target Species


Project Location

[No information]


Reasonable and Prudent Alternatives (RPAs)

Sponsor-Reported Relevant RPAs

Sponsor listed no RPAs for this project proposal

Relevant RPAs based upon NMFS & BPA Review

NMFS and BPA did not associate any reasonable and prudent alternatives with this project proposal


Biological Outcomes of this project: Abundance, biological characteristics, habitat use, and migration timing of mature Pacific lampreys; larval lamprey distribution, habitat use, and biological characteristics; abundance and migration timing of emigrant juvenile Pacific lamprey; Pacific lamprey homing fidelity, survival rates to adults, and ocean residence times; determination of the efficacy of using statoliths for aging lamprey; verified larval lamprey identifications; and lamprey spawning habitat characteristics, for Cedar Creek lampreys.
Biological Data: This project began in January of FY 2000; therefore, the initial year's data are currently being collected to measure the biological outcomes of this project. To date, these data consist of adult and juvenile trapping statistics and associated, preliminary population estimates; and spawning site locations and characteristics.


CBFWA-Generated Information

Database Administrator notes on the history of this proposal form: None
Type of Project (assigned by CBFWA Analysts): anadromous


Section 2. Past Accomplishments

Year Accomplishment
2000 Produced abundance estimates and determined biological characteristics and migration timing of adult Pacific lamprey returns to Cedar Creek (in progress).
2000 Produced abundance estimates and determined biological characteristics and migration timing of juvenile Pacific lamprey emigrants from Cedar Creek (in progress).
2000 Determined spawning timing, locations, and site characteristics for Pacific and western brook lamprey (in progress).


Section 3. Relationships to Other Projects

n/a or no information


Section 4. Budget for Planning and Design Phase

Task-based Budget

n/a or no information


Outyear Objective-Based Budget

n/a or no information


Outyear Budgets for Planning and Design Phase

n/a or no information


Section 5. Budget for Construction and Implementation Phase

Task-based Budget

Objective Task Duration in FYs Estimated 2001 cost Subcontractor
1. Estimate abundance, measure biological characteristics, and determine migration timing of mature Pacific lampreys. a. Trap adult anadromous lampreys though the entire migration period and measure their biological characteristics (length, weight, sex, and maturity). 2001, 2002, 2003 $ 37,571  
b. Mark captured Pacific lampreys, release them downstream of the trap location, and estimate spawning run abundance from proportion of marked animals recaptured. 2001, 2002, 2003 $ 9,393  
2. Determine larval Pacific and larval and adult western brook lamprey distribution, densities, habitat use, and biological characteristics. a. Capture larval lampreys and adult western resident (western brook) lamprey and determine their densities by depletion electrofishing and measure their length, weight, and sex. 2001, 2002, 2003 $ 25,491  
b. Evaluate habitat characteristics at ammocoete capture sites. 2001, 2002, 2003 $ 25,490  
3. Determine outmigration timing and estimate abundance of recently metamorphosed lampreys in Cedar Creek and a tributary. a. Capture outmigrant lampreys by floating screw trap in Cedar Creek, mark and release these animals upstream of the trap site, and estimate abundance from the proportion of marked lampreys in subsequent samples. 2001, 2002, 2003 $ 53,943  
Capture outmigrant lampreys by floating screw or fyke trap in a major tributary to Cedar Creek, mark and release these animals upstream of the trap site, and estimate abundance from the proportion of marked lampreys in subsequent samples. 2001, 2002, 2003 $ 25,881  
4. Evaluate lamprey homing fidelity, survival rates, and ocean residence. a. Tag outmigrant lamprey with coded wire tags (CWT) and monitor immigrant adults for CWT; for recaptures, determine ocean residence time from time elapsed between tagging and recapture, and homing fidelity and survival rates from recapture percentages. 2001, 2002, 2003 $ 10,000  
5. Verify diagnostic characteristics and species of larval lampreys; evaluate efficacy of aging lampreys using statoliths a. Rear ammocoetes through metamorphosis to verify species identifications; extract statoliths from ammocoetes and determine if statolith banding patterns correspond to length-frequencies and known ages. 2001, 2002, 2003 $ 6,612  
b. Use genetic markers to verify species identifications. 2001, 2002, 2003 $ 0  
6. Evaluate spawning habitat requirements of adult lampreys. a. Conduct weekly surveys during potential spawning periods to identify lamprey spawning locations and redds, sample redds to evaluate the occurrence of unused redds. 2001, 2002, 2003 $ 8,250  
b. Measure physical characteristics of redds, including redd size, depth in the water column, water velocity, substrate, habitat type, and presence of cover and shading. 2001, 2002, 2003 $ 4,125  
c. Cap redds to determine developmental timing and survival of lamprey eggs and larvae. 2001, 2002, 2003 $ 4,125  
7. Evaluate how stream temperature influences larval and adult Pacific and western brook lamprey habitat use. a. Longitudinally map Cedar Creek and its tributaries using Infrared Videography as (Snowy Butte Helicopter subcontract) 2001, 2002, 2003 $ 19,000 x
8. Determine immigration patterns and timing, habitat use between immigration and spawning, and spawning behavior and habitat use of adult Pacific lamprey a. Radio-tag up to 20 adult Pacific lamprey captured during adult trapping each year, monitor their movements by radio-telemetry and measure the physical characteristics of habitats used for overwintering and spawning. 2001, 2002, 2003 $ 89,000  


Outyear Objective-Based Budget

n/a or no information


Outyear Budgets for Construction and Implementation Phase

FY 2003 FY 2004 FY 2002
$316,000 $332,000 $301,000


Section 6. Budget for Operations and Maintenance Phase

Task-based Budget

n/a or no information


Outyear Objective-Based Budget

n/a or no information


Outyear Budgets for Operations and Maintenance Phase

n/a or no information


Section 7. Budget for Monitoring and Evaluation Phase

Task-based Budget

n/a or no information


Outyear Objective-Based Budget

n/a or no information


Outyear Budgets for Monitoring and Evaluation Phase

n/a or no information


Section 8. Estimated Budget Summary

Itemized Budget

Item Note FY 2001 Cost
Personnel FTE: Biologist and 2 technicians $ 90,611
Fringe 30% $ 38,841
Supplies Nets, traps, sampling equipment, miscellaneous field supplies $ 23,580
Travel Vehicle rental and maintenance; occasional overnight travel to meetings $ 11,000
Indirect 34.2% of total $102,609
Capital Radio-telemetry receivers (3) $ 33,000
PIT tags # of tags: 100 $ 240
Subcontractor Snowy Butte Helicopters $ 19,000
Total Itemized Budget $318,881


Total estimated budget

Total FY 2001 project cost $318,881
Amount anticipated from previously committed BPA Funds $ 0
Total FY 2001 budget request $318,881
FY 2001 forecast from 2000 $160,000
% change from forecast 99.3%


Reason for change in estimated budget

This increased budget reflects an increase in indirect costs from 19% to 34.2% , slightly increased personnel costs, and the addition of three new study components (Obj. 3, task b; Obj. 7, task a; and Obj. 8, task a; all are described in the following section). If FY 2001 work-tasks remain unchanged from FY 2000, the budget would be $185,000 (a 16% increase from projections). Combined, the budget increase for the three new study components is $133,881.


Reason for change in scope

The three added components address components of Pacific lamprey behavior, population dynamics, and biology that are unknown for the population in question and Pacific lamprey in general, but which are crucial information for management and recovery of this species. Obj. 3b: provides outmigrant abundance estimates and timing from the Cedar Creek tributary with highest ammocoete densities (to be determined). Obj. 7a: uses IR videography to provide longitudinal temperature and riparian vegetation profiles, for examining relationships between larval and adult lamprey habitat use, habitat characteristics, and stream temperatures. Stream temperature has been shown to be a critical variable in determining fish distribution and survival, both for lampreys and other species. Obj. 8a: provides adult immigration rates, movement patterns, and habitat associations during immigration, overwintering and spawning. This information is largely unknown for this species.


Cost Sharing

Not applicable
 

Outyear Budget Totals

2002 2003 2004
Construction/implementation $301,000 $316,000 $332,000
Total Outyear Budgets $301,000 $316,000 $332,000
 

Other Budget Explanation

Not applicable


Reviews and Recommendations

This information was not provided on the original proposals, but was generated during the review process.

CBFWA Funding Recommendation Recommendation:
Ongoing Funding: yes; New Funding: yes
Date:
Jul 14, 2000
2001
$185,000
Comment:
This increased budget reflects an increase in indirect costs from 19% to 34.2%, slightly increased personnel costs, and the addition of three new study components (Objective 3, task b; Objective 7, task a; and Objective 8, task a; all of which are described in the following section). If FY 2001 work-tasks remain unchanged from FY 2000, the budget would be $185,000 (a 16% increase from projections). Combined, the budget increase for the three new study components is $133,881.

The three added components address components of Pacific lamprey behavior, population dynamics, and biology that are unknown for the population in question and Pacific lamprey in general, but which are crucial information for management and recovery of this species. Objective 3b provides outmigrant abundance estimates and timing from the Cedar Creek tributary with highest ammocoete densities (to be determined). Objective 7a uses IR videography to provide longitudinal temperature and riparian vegetation profiles, for examining relationships between larval and adult lamprey habitat use, habitat characteristics, and stream temperatures. Stream temperature has been shown to be a critical variable in determining fish distribution and survival, both for lampreys and other species. Objective 8a provides adult immigration rates, movement patterns, and habitat associations during immigration, overwintering and spawning. This information is largely unknown for this species.


NWPPC Funding Recommendation Recommendation:
Fund
Date:
Sep 13, 2000
2001
$150,000
Comment:
Rationale: Budget increase inappropriate in this review.

NW Power and Conservation Council's FY 2006 Project Funding Review Funding category:
expense
Date:
May 2005
FY05 NPCC Start of Year:
$204,465
FY06 NPCC Staff Preliminary:
$204,465
FY06 NPCC July Draft Start of Year:
$204,465
Sponsor (USFWS) Comments (Go to Original on NPCC Website):