Project
Pisces Report
Project Status Work Funded

View Modification

Table of Contents
Part 1. Administration and Budgeting
Section 1: General Administrative Information
Section 2: Description
Section 3: Related Projects
Section 4: Planning and Design
Section 5: Construction/Implementation
Section 6: Operations and Maintenance
Section 7: Monitoring and Evaluation
Section 8: Total Budget
Section 9: Project Documents
Part 2. Current Status of Modification Request
Part 3. Comments on this Modification Request


Part 1 of 3. Administration and Budgeting
Section 1: General Administrative Information
Process Information:
Date Proposal Submitted & Finalized Status BOG Meeting Date
July 28, 2008 Finalized August 6, 2008

Modification Type: FY 2008 Within-Year Ongoing
BPA Project Number: 200731800
BPA Project Name: UPA Knapp-Wham Hanna Detwieler Irrigation Consolidation
COTR/BPA Project Manager: Cecilia Brown
Agency, Institution or Organization Requesting Rescheduling: Cascadia Conservation District
Funding Type: expense
Project Leader: Rich Malinowski
Province: Columbia Cascade
Subbasin: Entiat
 
Contact Person
First Name: Mike
Last Name Rickel
Address: 301 Yakima Street, Room 307
City, State Zip: Wenatchee, WA 98801
Phone: 509.664.0268
Fax: 509.664.0255
Email: mike.rickel@wa.nacdnet.net

Administrative Contacts
Primary Administrative Contact Secondary Administrative Contact:
Name Rich Malinowski Name
Address: 301 Yakima Street, Room 307 Address:
City, State Zip: Wenatchee, WA 98801 City, State Zip:
Phone: 509.664.0213 Phone:
Fax: 509.664.0255 Fax:
Email: rich.malinowski@wa.nacdnet.net Email:
Note: Note:

Section 2a: Description (Species Information)
Target Species Oncorhynchus mykiss (steelhead)
Salvelinus confluentus (bull trout)

Provide explanations as to why the following alternative funding solutions are not feasible and will jeopardize the project:
Reduction in existing scope of project: This is not a change in project scope. Rather, we are submitting this BOG entry to be transperant and inform the council of the project modifications needed to meet the biological objectives.
Deferral of existing work elements to later date: n/a

Section 2b: Description (Location Information)
Location(s) at which the action will be implemented
Latitude Longitude Location Description
No Locations Entered

Is this/Are these the same study location(s) that was/were identified in the original proposal? No

Condition/situation creating the need for the modification:
Is the situation the result of a catastrophic event that occurred within the existing location? No
Has a habitat/population/mechanical/structural dilemma developed in the proposed study location since the contract was signed with BPA? Yes

Section 2c: Description (Work Element Information)
What work elements in the existing proposal does the proposed modification address?
Work Element Work Element Title
B. 175 C. 165 D. 34 E. 82 B. Produce Engineering Designs and Technical Specifications C. Produce required permits D. Well development - New lines E. Replace diversions and protect instream water rights

Proposed action to achieve the objective(s) Upgrade the existing Keystone instream diversion to meet the irrigation needs rather than continue drilling wells that are not producing the amount needed. The Keystone diversion was not part of the original Knapp Wham irrigation diversion project since there was no need to alter the diversion if the wells were going to produce the expected water supply. In order to still achieve the biological objectives identified for the Entiat River we are modifing the original approach. Specifically, Keystone #1 well only produced 30 gallons per minute. Keystone #2 well produced 115 gallons per minute (GPM). These two wells scheduled to produce greater than 250 GPM and therefor the decision was made to not drill any more wells since it was unlikely that they would produce the amount of water needed. However, the Keystone Ranch does have an existing instream water diversion that will be upgraded to ESA compliance for fish screening and fish passage while providing the amount of water needed. We propose to enlarge the existing Keystone diversion from 800 GPM to 1,500 GPM. The estimated water conservation will be unchanged through the ditch consolidation. The saved water will be placed into the State of Washington's Trust Water Program estimated to be 0.5 cubic feet per second.

Does not implementing this modification jeopardize the ability to achieve existing biological objectives of this project, as well as other projects? Yes

Explain: see section 2.a

Section 2d: Description (BiOp Information)
NMFS and/or FWS Biological Opinion that this funding request addresses Strategy
NMFS &/or USFWS
How proposed actions will address the BiOp
(i.e., substrategy / limiting factor / metric to be achieved)
nmfs 2004 habitat unchanged from original proposal

Section 2e: Description (Objectives)
Objectives of this proposed project
Objective
(abbreviation)
Full Description
unchanged unchanged from original proposal

Section 3: Is This Funding Request Related to Other Projects in the Basin?

Other projects that are related to this request
Project # Project Title/Description Nature of Relationship
unchanged

Section 4: Estimated Budget for Planning & Design phase for this request (request amount only)

Work element-based estimated budget
Planning & Design
Objective Work Element Work Element Title Work Element Description Description of Metrics Task Duration
in FYs
Estimated Budget Subcontractor?

Outyear work element-based estimated 2009 - 2012 budget for this proposal
Planning & Design
Work Element Work Element Outyear Description Starting FY
numbers only
Ending FY
numbers only
Estimated cost

Outyear totals
Planning & Design

Section 5: Estimated Budget for Contruction/Implementation phase for this request (request amount only)

Work element-based estimated budget
Contruction/Implementation
Objective Work Element Work Element Title Work Element Description Description of Metrics Task Duration
in FYs
Estimated Budget Subcontractor?

Outyear work element-based estimated 2009 - 2012 budget for this proposal
Contruction/Implementation
Work Element Work Element Outyear Description Starting FY
numbers only
Ending FY
numbers only
Estimated cost

Outyear totals
Contruction/Implementation

Section 6: Estimated Budget for Operations & Maintenance phase for this request (request amount only)

Work element-based estimated budget
Operations & Maintenance
Objective Work Element Work Element Title Work Element Description Description of Metrics Task Duration
in FYs
Estimated Budget Subcontractor?

Outyear work element-based estimated 2009 - 2012 budget for this proposal
Operations & Maintenance
Work Element Work Element Outyear Description Starting FY
numbers only
Ending FY
numbers only
Estimated cost

Outyear totals
Operations & Maintenance

Section 7: Estimated Budget for Monitoring & Evaluation phase for this request (request amount only)

Work element-based estimated budget
Monitoring & Evaluation
Objective Work Element Work Element Title Work Element Description Description of Metrics Task Duration
in FYs
Estimated Budget Subcontractor?

Outyear work element-based estimated 2009 - 2012 budget for this proposal
Monitoring & Evaluation
Work Element Work Element Outyear Description Starting FY
numbers only
Ending FY
numbers only
Estimated cost

Outyear totals
Monitoring & Evaluation

Section 8: Total Budget Modification Request

Itemized Estimated Budget
Item Note FY 2008 Cost

Total Estimated Budget Modification
Total FY 2008 budget modification $ 0
Total FY 2008 budget for this project, including modification request $ 0

Outyear Budget Totals
Not applicable

Cost sharing associated with this modification
Organization Item or Service Provided Amount ($) Cash or in-kind?

Section 9: Narrative, Maps and Project Documents
Document Type Size Date

Part 2 of 3. Current Status of Modification Request
Meeting Date Status Record Entry Date Decision Group Adjustment Category Urgency Status Budget Impact Reconsider Date
8/6/2008  7/28/2008  NA      Submitted  $ 0   
Decision Comments Next Steps
   
8/6/2008  8/6/2008  BOG      Withdrawn  $ 0   
Decision Comments Next Steps
Project sponsor wanted to inform BOG any changes in this proposal.   