Project Proposal Request for FY 2007 - FY 2009 Funding

Proposal 200003300: Walla Walla River Fish Passage Operations

Download this document in MS Word format
Open this document in PDF format

Table of Contents
Part 1. Administration and Budgeting
Section 1: General Administrative
Section 2: Project Location
Section 3: Project Species
Section 4: Past Accomplishments
Section 5: Relationship to Other Projects
Section 6: Biological Objectives
Section 7: Work Elements
Section 8: Budget
Section 9: Project Future
Section 10: Documents
Part 2. Reviews
Part 1 of 2. Administration and Budgeting
Section 1: General Administrative Information
Process Information:
Date Proposal Submitted & Finalized Status Form Generator
January 10, 2006 Finalized James Bronson

Proposal Type: Ongoing
Proposal Number: 200003300
Proposal Name: Walla Walla River Fish Passage Operations
BPA Project Manager: Sarah Branum
Agency, Institution or Organization: Confederated Tribes of the Umatilla Indian Reservation
Short Description: Increase survival of migrating salmonids in the Walla Walla Basin by coordinating the overall passage program including monitoring passage conditions and operation of passage facilities and transport equipment to provide adequate passage conditions.
Information Transfer: Project provides monthly reports to co-managers detailing passage issues in the subbasin.
 
Project Proposal Contacts
Contact Organization Address Phone/Email Roles Notes
Form Submitter
James Bronson CTUIR P.O. Box 638
Pendleton OR 97801
Ph: (541) 966-2398
Fax: (541) 276-4348
Email: prestonbronson@ctuir.com
Form Submitter
All Assigned Contacts
James Bronson CTUIR P.O. Box 638
Pendleton OR 97801
Ph: (541) 966-2398
Fax: (541) 276-4348
Email: prestonbronson@ctuir.com
Project Lead
Julie Burke Confederated Tribes of the Umatilla Indian Reserva 73239 Confederated Way P.O. Box 638
Pendleton OR 97801
Ph: 541.966.2372
Fax: 541.966.2397
Email: julieburke@ctuir.com
Administrative Contact
Gary James Confederated Tribes of the Umatilla Indian Reservation Old Mission Highway P.O. Box 638
Pendleton OR 97801
Ph: 541.966.2371
Fax: 541.966.2397
Email: garyjames@ctuir.com
Supervisor
Brian Zimmerman CTUIR PO Box 638
Pendleton, OR 97801
Ph: 541-276-4109
Fax: [left blank]
Email: brianzimmerman@ctuir.com
Supervisor

Section 2: Project Location
Sponsor Province: Columbia Plateau ARG Province: No Change
Sponsor Subbasin: Walla Walla ARG Subbasin: No Change
Location(s) at which the action will be implemented
Latitude Longitude Waterbody Location Description County/State Subbasin Primary?
46.04 118.51 Walla Walla River Garden City/ Lowden II Diversion Walla Walla County, Washington Walla Walla No
46.1 118.26 Walla Walla River Burlingame Dam and canal Walla Walla County, Washington Walla Walla No
45.56 118.23 Walla Walla River Little Walla Walla River diversion Umatilla, Oregon Walla Walla No
45.94 118.38 Walla Walla River Nursery Bridge Fishway Umatilla, Oregon Walla Walla No
Walla Walla River Walla Walla Subbasin including the mainstem Walla Walla River, Lower Touchet River, and Mill Creek , Walla Walla Yes

Section 3: Focal Species
Focal Species:
Primary Secondary Additional Species
All Anadromous Salmonids
Bull Trout
Pacific Lamprey

Section 4: Past Accomplishments
Past Accomplishments for Each Fiscal Year of This Project
Fiscal Year Accomplishments
2005 Operated and monitored passage facilities, operated adult traps and provided adult return data, drafted WW AOP, and provided technical input on passage and trapping facility designs.
2004 Operated and monitored passage facilities, operated adult traps and provided adult return data, drafted WW AOP, and provided technical input on passage and trapping facility designs.
2003 Operated and monitored passage facilities, operated adult traps and provided adult return data, drafted WW AOP, and provided technical input on passage and trapping facility designs.
2002 Operated and monitored passage facilities, operated adult traps and provided adult return data, drafted WW AOP, and provided technical input on passage and trapping facility designs.
2001 Operated and monitored passage facilities, operated adult traps and provided adult return data, drafted WW AOP, and provided technical input on passage and trapping facility designs.
2000 Operated and monitored passage facilities, operated adult traps and provided adult return data, drafted WW AOP, and provided technical input on passage and trapping facility designs.
1999 Operated and monitored passage facilities, operated adult traps and provided adult return data, drafted WW AOP, and provided technical input on passage and trapping facility designs.
1998 Operated and monitored passage facilities, operated adult traps and provided adult return data, drafted WW AOP, and provided technical input on passage and trapping facility designs.

Section 5: Relationships to Other Projects
Other Current Projects Related to this Project (any funding source)
Funding Source Related ID Related Project Title Relationship
BPA 198805301 Ne Or Hatchery Master Plan - N After completion of the hatchery facility, proposed project will provide adequate passage for juveniles produced at the facility and collect broodstock for production programs.
BPA 199601100 Juv Screens & Traps Wallawalla Proposed project identifies passage improvements to be completed under project 199601100. Also provides technical input on facility designs and operational criteria of facilities constructed under this proejct. Project 199601100 also provides O&M of facilities operated by the project.
BPA 200003900 Walla Walla River Basin Monito Proposed project provides adequate passage for natural adults and juveniles to and from natural production areas. Also provides adult return information to M&E project.

Section 6: Biological Objectives
Biological Objectives of this Proposed Project
Biological Objective Full Description Associated Subbasin Plan Strategy Page Nos
Increase survival of migrating salmonids The biological objective of the project is to increase survival of migrants by ensuring adequate passage conditions exist for both upstream and downstream migration by monitoring river conditions and passage facility operations. The project also provides technical review and input on passage facilities and coordinates the overall passage program through development of the Annual Operation Plan. Walla Walla Section 1.1.5.2 of the Final Addendum to the Walla Walla Subbasin Plan Pg 5.

Section 7: Work Elements
Work Elements and Associated Biological Objectives
Work Element Name Work Element Title Description Start Date End Date Estimated Budget
01: Operate and Maintain Habitat/Passage Monitor Passage Conditions Monitor channel morphology, hydrologic conditions, and passage facility operations. 1/1/2007 9/30/2009 $189,975
Biological Objectives Metrics
Increase survival of migrating salmonids
No Metrics for this Work Element

02: Coordination Coordinate Passage Facility Operations Coordinate operation and maintenance of passage facilities (Little Walla Walla River, Nursery Bridge Dam, Burlingame Canal, and Garden City/Lowden II) on a weekly basis with Passage Facility O&M staffs. Jon Brough (HBDIC) is main contact for the Oregon facilities and Stuart Durfee (GFID) is the main contact for the Washington passage facilities. Problems or issues related to coordination of the overall passage effort are documented in the project monthly and annual reports. 1/31/2007 9/30/2009 $46,525
Biological Objectives Metrics
Increase survival of migrating salmonids
No Metrics for this Work Element

03: Produce Plan Fish Passage Annual Operating Plan Produce Annual Fish Passage Operations Plan (AOP0. The final AOP is attached to the annual report 8/1/2007 9/30/2009 $15,508
Biological Objectives Metrics
Increase survival of migrating salmonids
No Metrics for this Work Element

04: Trap and Haul Little Walla Walla Trap and Haul Operate Little Walla Walla River juvenile trapping facility as needed to provide safe passage conditions for downstream migrants. Transport downstream migrants past inadequate passage condition areas. Collect data related to downstream migrant trap and haul operations. Dates of operation and all data will be reported in the project monthly and annual reports. 1/1/2007 9/30/2009 $19,385
Biological Objectives Metrics
Increase survival of migrating salmonids
No Metrics for this Work Element

05: Trap/Collect/Hold/Transport Fish - Hatchery Provide transportation assistance. Provide safe adult and juvenile transportation assistance for other basin project efforts as needed. Participation in these other transport activities is documented in the project monthly and annual reports. 1/1/2007 9/30/2009 $19,385
Biological Objectives Metrics
Increase survival of migrating salmonids
No Metrics for this Work Element

06: Provide Technical Review Provide Facility Design Technical Review Attend meetings, review designs and plans, and provide technical review and comments as required for passage improvement efforts in the Walla Walla subbasin. The project notes which passage projects it provides technical comments for in the monthly and annual reports but does not include the actual details of those technical comments. 1/1/2007 9/30/2009 $42,648
Biological Objectives Metrics
Increase survival of migrating salmonids
No Metrics for this Work Element

07: Manage and Administer Projects Project Management Submit annual budget package for 2007-2009, invoices, accruals, and metric information to BPA. 1/1/2007 9/30/2009 $23,262
Biological Objectives Metrics
Increase survival of migrating salmonids
No Metrics for this Work Element

08: Produce Status Report Prepare Status Reports Produce monthly status reports for BPA and other recipients including: Bureau of Reclamation, NOAA Fisheries, ODFW, Irrigation Districts, and Oregon Water Resources Department. Summary of monthly report information will be incorporated into the annual report. 1/1/2007 9/30/2009 $7,754
Biological Objectives Metrics
Increase survival of migrating salmonids
No Metrics for this Work Element

09: Other Produce Pisces Status Report Quarterly milestone reports in Pisces. 4/1/2007 9/30/2009 $2,327
Biological Objectives Metrics
Increase survival of migrating salmonids
No Metrics for this Work Element

10: Produce Annual Report Annual Report Produce annual reports for 2007-2009. 6/1/2007 9/30/2009 $19,384
Biological Objectives Metrics
Increase survival of migrating salmonids
No Metrics for this Work Element

11: Produce Environmental Compliance Documentation Environmental Compliance Maintain necessary permits to conduct project tasks. 1/1/2007 9/30/2009 $1,550
Biological Objectives Metrics
Increase survival of migrating salmonids
No Metrics for this Work Element


Section 8: Budget

Itemized Estimated Budget
Item Note FY 2007 Cost FY 2008 Cost FY 2009 Cost
Personnel [blank] $52,145 $54,752 $57,489
Fringe Benefits [blank] $17,341 $18,208 $19,118
Supplies [blank] $5,411 $5,682 $5,966
Travel [blank] $15,619 $16,400 $17,220
Overhead [blank] $32,467 $34,090 $35,795
Totals $122,983 $129,132 $135,588

Total Estimated FY 2007-2009 Budgets
Total Itemized Budget$387,703
Total Work Element budget$387,703

Cost sharing
Funding Source or Organization Item or Service Provided FY 2007 Est Value ($) FY 2008 Est Value ($) FY 2009 Est Value ($) Cash or in-kind? Status

Section 9: Project Future
Project Future Costs and/or Termination
FY 2010 Est Budget FY 2011 Est Budget Comments
$142,367 $149,485 Cost estimates are based on a projected 5% increase in the cost of living and other wage increases, rising fuel and other material costs, and associated administrative costs.
Future Operations & Maintenance Costs
 
Termination Date Comments
The project is viewed as a long term O&M project required for maintaining the survival advantages achieved by implementation of the fish passage and flow enhancement projects in the basin.
 
Final Deliverables

Section 10: Narrative
Document Type Size Date

Part 2 of 2. Reviews of Proposal
Administrative Review Group (ARG) Results
Account Type:
Expense
No changes were made to this proposal


NPCC Final Funding Recommendations (October 23, 2006) [Full NPCC Council Recs]

FY 2007 Budget
$129,234
FY 2008 Budget
$129,234
FY 2009 Budget
$129,234
Total NPCC Rec
$387,702
Budget Type:Expense
Budget Category:ProvinceExpense
Recommendation:Fund
Comments: ISRP fundable qualified: sponsors should address the ISRP M&E comments the next time they report to Bonneville (copy to Council staff).


NPCC Draft Funding Recommendations (September 15, 2006) [Full NPCC Council Recs]

FY 2007 Budget
$ 0
FY 2008 Budget
$ 0
FY 2009 Budget
$ 0
Total NPCC Rec
$ 0
FY 2007 MSRT Rec
$ 0
FY 2008 MSRT Rec
$ 0
FY 2009 MSRT Rec
$ 0
Total MSRT Rec
$ 0
Budget Category:ProvinceExpense
Comments:
NPCC Staff Comments: WA recommends 0 for now. This project will be reconsidered if 199601100 is capitalized. OR recommends $105k. Recommend that sponsors and Bonneville consider combining this project w/ 200721700 and find budget efficiencies. ISRP fundable qualified: sponsors should address the ISRP M&E comments the next time they report to Bonneville (copy to Council staff)..


Independent Scientific Review Panel Final Review (August 31, 2006) [Download full document]

Recommendation: Fundable (Qualified)
NPCC Comments: See comments on 199601100 - Walla Walla Juvenile and Adult Passage Improvements. Is there any evidence of improvement to fish numbers as a result of these efforts?


Independent Scientific Review Panel Preliminary Review (June 2, 2006) [Download full document]

Recommendation: Fundable (Qualified)