PropID Proposal Number Title Sponsor Type Sponsor Prop Type Province Subbasin Short Description Primary Species Type BPA Cap/Exp Review Comments BPA Cap/Exp Review Uncertainty FY07 Req Original FY08 Req Original FY09 Req Original FY07 Req Revised FY08 Req Revised FY09 Req Revised FY07 Req Difference FY08 Req Difference FY09 Req Difference
183 198201301 Coded-Wire Tag Recovery Federal Pacific States Marine Fisheries Commission (PSMFC) Ongoing Mainstem/Systemwide Systemwide Recovery of CWTs from salmonids sampled in the commercial/sport fisheries (Columbia R and Oregon ocean), spawning grounds and hatcheries. Provides critical stock identification information required to evaluate the status of Columbia Basin stocks. Anadromous $2,783,640 $2,894,985 $3,010,785 $2,783,640 $2,894,985 $3,010,785 $ 0 $ 0 $ 0
722 198201302 Annual Stock Assessment - Coded Wire Tag Program (ODFW) State Oregon Department of Fish & Wildlife (ODFW) Ongoing Mainstem/Systemwide Systemwide Apply coded-wire tags to production releases of coho and chinook salmon at ODFW Columbia Basin hatcheries for stock assessment of hatchery and wild salmon populations. Evaluate survival, contribution and stray rates of hatchery reared salmon. Anadromous $245,680 $250,593 $255,604 $245,680 $250,593 $255,604 $ 0 $ 0 $ 0
570 198201303 Coded Wire Tag - USFWS Federal US Fish & Wildlife Service (USFWS) Ongoing Mainstem/Systemwide Systemwide The Coded-Wire Tag (CWT) Recovery Project is an on-going data collection and data management program by ODFW, WDFW, and PSMFC that contributes to the annual assessment of hatchery and wild salmon populations throughout the Columbia Basin. specific, t Anadromous $115,538 $121,315 $127,987 $115,538 $121,315 $127,987 $ 0 $ 0 $ 0
383 198201304 Coded Wire Tag - WDFW State Washington Department of Fish and Wildlife (WDFW) Ongoing Mainstem/Systemwide Systemwide Apply coded-wire tags to production of coho and chinook salmon at WDFW Columbia Basin hatcheries for stock assessment of hatchery and wild populations. Evaluate survival, contribution and stray rates of hatchery reared fish and compare to wild fish. Anadromous $386,607 $389,092 $412,992 $386,607 $389,092 $412,992 $ 0 $ 0 $ 0
206 198331900 New Marking & Monitoring Tech Federal National Oceanic & Atmospheric Administration (NOAA) Ongoing Mainstem/Systemwide Systemwide The goal of this project is to develop and evaluate fish-tracking technologies needed to assess the effectiveness of management actions and strategies for recovery of ESA-listed fish populations. Anadromous $768,685 $1,357,243 $1,596,791 $768,685 $1,357,243 $1,596,791 $ 0 $ 0 $ 0
573 198335000 Nez Perce Tribal Hatchery Operations & Maintenance Tribe Nez Perce Tribe Ongoing Mountain Snake Clearwater Nez Perce Tribal Hatchery is a supplementation program using conventional and NATURES rearing techniques to rear spring and fall chinook salmon. Phase I production goals are set at 1.4 million fall chinook salmon and 625,000 spring chinook salmon. Anadromous $2,033,220 $2,094,217 $2,177,986 $2,033,220 $2,094,217 $2,177,986 $ 0 $ 0 $ 0
318 198335003 Nez Perce Tribal Hatchery M&E Tribe Nez Perce Tribe Ongoing Mountain Snake Clearwater This monitoring and evaluation (M&E) plan describes the implementation of a comprehensive monitoring and evaluation program for Phase 1 of Nez Perce Tribal Hatchery (NPTH). Anadromous $1,996,183 $2,031,097 $2,066,835 $1,996,183 $2,031,097 $2,066,835 $ 0 $ 0 $ 0
292 198343500 Umatilla Hatchery Satellite Facilities O&M Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau Umatilla Acclimate juvenile salmon and steelhead prior to release in the Umatilla Basin. Collect, hold, and spawn steelhead, coho, and chinook salmon and provide eggs to ODFW and other hatcheries for incubation, rearing, and later release in the Umatilla Basin. Anadromous $1,059,166 $1,102,743 $1,143,182 $1,059,166 $1,102,743 $1,143,182 $ 0 $ 0 $ 0
642 198343600 Umatilla Passage O&M Irrig.Dist. Westland Irrigation District Ongoing Columbia Plateau Umatilla Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facil Anadromous $502,253 $512,298 $522,544 $502,253 $512,298 $522,544 $ 0 $ 0 $ 0
489 198402100 Mainstem, Middle Fork, John Day Rivers Fish Habitat Enhancement Project State Oregon Department of Fish & Wildlife (ODFW) Ongoing Columbia Plateau John Day This project was initiated on July 1, 1984, (BPA) contract number DE A179-84 BP17460 and allows for initial landowner contacts, agreement development, project design, budgeting, and implementation for anadromous fish habitat on private lands. Anadromous $486,515 $519,262 $537,463 $486,515 $519,262 $537,463 $ 0 $ 0 $ 0
379 198402500 ODFW Blue Mountain Oregon Fish Habitat Improvement State Oregon Department of Fish & Wildlife (ODFW) Ongoing Blue Mountain Grande Ronde This project works with landowners, and other government and quasi-governmental agencies to protect and enhance habitat for federal ESA listed fish in the Blue Mountain Province of Oregon. Anadromous $377,900 $391,600 $410,300 $377,900 $391,600 $410,300 $ 0 $ 0 $ 0
538 198506200 Juvenile Fish Screen Evaluations in Columbia Plateau Province Federal Pacific Northwest National Laboratory Ongoing Columbia Plateau None Selected The goal of this project is to monitor and evaluate fish screen facilities to ensure they meet NMFS criteria for safe juvenile fish passage. Fish screens will be evaluated in most subbasins within the Columbia Plateau Province. Anadromous $91,717 $94,608 $97,981 $91,717 $94,608 $97,981 $ 0 $ 0 $ 0
371 198503800 Colville Hatchery Tribe Colville Confederated Tribes Ongoing Intermountain Columbia Upper This proposal will provide hatchery production of resident trout that support and enhance tribal subsistence fisheries and non-tribal recreational fisheries within the Colville Indian Reservation. Resident $1,015,504 $1,056,124 $1,098,369 $961,501 $1,003,774 $1,044,724 $54,003 $52,350 $53,645
103 198605000 White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam State Oregon Department of Fish & Wildlife (ODFW) Ongoing Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince Restore and mitigate for hydrosystem-caused loss loss of white sturgeon productivity through intensive fisheries management, supplementation, and modified hydropower system operation. Assess success of mitigation and restoration efforts. Resident $1,613,363 $1,591,637 $1,613,212 $1,613,363 $1,591,637 $1,613,212 $ 0 $ 0 $ 0
144 198710001 Umatilla Anad Fish Hab - CTUIR Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau Umatilla Instream and riparian habitat restoration for fisheries and wildlife in the Umatilla River Basin Anadromous $372,245 $385,085 $405,960 $372,245 $385,085 $405,960 $ 0 $ 0 $ 0
175 198710002 Umatilla Subbasin Fish Habitat Improvement Project State Oregon Department of Fish & Wildlife (ODFW) Ongoing Columbia Plateau Umatilla The ongoing Umatilla Subbasin Fish Habitat Improvement Project (19871-100-02) is aimed at protecting (where possible) and enhancing/rehabilitating (where required), degraded fish habitat on private lands using passive and active restoration techniques. Anadromous $321,767 $335,282 $349,395 $321,767 $335,282 $349,395 $ 0 $ 0 $ 0
132 198712700 Smolt Monitoring By Non-Feder Federal Pacific States Marine Fisheries Commission (PSMFC) Ongoing Mainstem/Systemwide Systemwide Daily passage data through the mainstem, Snake, Columbia and mid-Columbia Rivers to facilitate fish passage management decisions, including Biological Opinion implementation, is collected daily. Sampling and marking occur at 8 sites of the larger region. Anadromous $2,345,710 $2,436,778 $2,550,951 $2,345,710 $2,436,778 $2,550,951 $ 0 $ 0 $ 0
243 198802200 Umatilla Fish Passage Operations Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau Umatilla Increase survival of migrating juvenile and adult salmon and steelhead in the Umatilla Basin by operating passage facilities, flow enhancement measures, trapping facilities, and transport equipment to provide adequate passage conditions. Anadromous $380,238 $399,249 $419,211 $380,238 $399,249 $419,211 $ 0 $ 0 $ 0
355 198805301 Grande Ronde/Imnaha Endemic Spring Chinook Supplementation  Northeast Oregon Hatchery Tribe Nez Perce Tribe Ongoing Blue Mountain Grande Ronde Co-managers are utilizing this project to plan and develop salmon conservation and recovery programs, and the facilities necessary for implementation, in the Imnaha and Grande Ronde River subbasins. These programs are aimed at preventing extinction, rein Anadromous Capitalize land acquisition and construction $9,809,858 $3,478,059 $1,014,268 $9,809,858 $3,478,059 $1,014,268 $ 0 $ 0 $ 0
259 198805303 Hood River Production M&E - Ws Tribe Confederated Tribes of Warm Springs Reservation of Oregon Ongoing Columbia Gorge Hood Implement, monitor, and evaluate actions in the Hood River and Pelton Ladder Master Plans pertaining to smolt production, acclimation, and habitat. Anadromous $585,897 $544,920 $556,421 $585,897 $544,920 $556,421 $ 0 $ 0 $ 0
195 198805304 Hood River Production Program - ODFW M&E State Oregon Department of Fish & Wildlife (ODFW) Ongoing Columbia Gorge Hood Monitor and evaluate actions taken to re-establish spring chinook salmon, and improve wild production of summer and winter steelhead, in the Hood River subbasin. Data will be used to develop, and refine, management objectives for the HRPP. Anadromous $536,935 $583,381 $609,659 $536,935 $583,381 $609,659 $ 0 $ 0 $ 0
583 198805305 Northeast Oregon (NEOH) Outplanting Facilities Master Plan State Oregon Department of Fish & Wildlife (ODFW) Ongoing Blue Mountain Grande Ronde The Oregon Department of Fish and Wildlife (ODFW) is collaborating on preliminary design of new hatchery facilities and modifications to Lookingglass Hatchery with the Nez Perce and Umatilla Tribes and federal partners. Anadromous $18,870 $18,870 $18,870 $18,870 $18,870 $18,870 $ 0 $ 0 $ 0
266 198805307 Hood R Prod O&M - Ws/Odfw Tribe Confederated Tribes of Warm Springs Reservation of Oregon Ongoing Columbia Gorge Hood Restore and maintain populations of summer and winter steelhead, and re-establish and maintain the spring chinook population in the Hood River subbasin. Steelhead and chinook broodstock will be held and spawned at the Parkdale Fish Facility. Anadromous $270,282 $277,906 $285,530 $270,282 $277,906 $285,530 $ 0 $ 0 $ 0
366 198805308 Hood River Powerdale Dam Fish Trap/Oak Springs/Pelton Ladder -Operation and Maintenance State Oregon Department of Fish & Wildlife (ODFW) Ongoing Columbia Gorge Hood This ongoing proposal requests funding for the operation and maintenance of the Powerdale Dam Fish Trap, rearing of Hood River origin steelhead at Oak Springs Hatchery, and rearing of spring Chinook at Pelton Ladder associated with the HRPP. Anadromous $562,860 $589,337 $598,649 $562,860 $589,337 $598,649 $ 0 $ 0 $ 0
829 198805315 Hood River Adult Salmonid Trapping Facilities/Parkdale Fish Facility Expansion State Oregon Department of Fish & Wildlife (ODFW) Ongoing Columbia Gorge Hood Conduct environmental compliance and initiate construction on proposed adult salmonid trapping facilities in the Hood River Subbasin, and expansion of the Parkdale Fish Facilty to accomodate spring Chinook rearing. Anadromous $750,000 $250,000 $150,000 $750,000 $250,000 $150,000 $ 0 $ 0 $ 0
152 198806400 Kootenai River Native Fish Restoration and Conservation Aquaculture Tribe Kootenai Tribe of Idaho Ongoing Mountain Columbia Kootenai Prevent extinction and begin rebuilding healthy age class structure of sturgeon and burbot using conservation aquaculture techniques with wild broodstock. Reintroduce kokanee into westside tributaries. Provide fisheries program outreach. Resident $1,970,800 $2,739,146 $3,523,054 $1,970,800 $2,739,146 $3,523,054 $ 0 $ 0 $ 0
302 198806500 Kootenai R White Sturgeon Inve State Idaho Department of Fish & Game Ongoing Mountain Columbia Kootenai The main goals of this Kootenai River investigation is to determine limiting factors of key fish species, including thretened and endangered, and provide recommendations to their recovery as well as ecosystem rehabilitation through nutrient restoration. Resident $1,165,360 $1,169,924 $1,179,198 $1,165,360 $1,169,924 $1,179,198 $ 0 $ 0 $ 0
172 198810804 StreamNet (CIS/NED) Federal Pacific States Marine Fisheries Commission (PSMFC) Ongoing Mainstem/Systemwide Systemwide StreamNet is a data development & dissemination project that provides data related services to the FWP and the region's fish and wildlife agencies. It obtains, georeferences, standardizes and disseminates specific fish related data from multiple sources Anadromous $2,901,154 $3,040,961 $3,198,011 $2,901,154 $3,040,961 $3,198,011 $ 0 $ 0 $ 0
667 198811525 Ykfp - Design & Construction (Nelson Springs replacement facility) Tribe Yakama Confederated Tribes Ongoing Columbia Plateau Yakima This proposal supports design and construction of replacement YKFP M&E facilities at Nelson Springs, WA. Anadromous $628,701 $ 0 $ 0 $628,701 $ 0 $ 0 $ 0 $ 0 $ 0
590 198811535 Klickitat Fishery YKFP Design Tribe Yakama Confederated Tribes Ongoing Columbia Gorge Klickitat This YKFP Design & Construction proposal identifies facilities required to implement YKFP supplementation efforts and to successfully monitor results. Anadromous $5,611,530 $5,615,562 $5,619,753 $5,611,530 $5,615,562 $5,619,753 $ 0 $ 0 $ 0
439 198812025 Ykfp Management, Data, Habitat Tribe Yakama Confederated Tribes Ongoing Columbia Plateau Yakima Proposal provides for all YN management functions associated with the Yakima/Klickitat Fisheries Project including project planning, O&M, research, data management, and habitat improvement and acquisition actions in the Yakima Subbasin. Anadromous $1,237,239 $1,268,041 $2,284,582 $1,237,239 $1,268,041 $2,284,582 $ 0 $ 0 $ 0
230 198812035 YKFP Klickitat Management, Data, and Habitat Tribe Yakama Confederated Tribes Ongoing Columbia Gorge Klickitat Proposal provides for all YN management functions associated with the Yakima/Klickitat Fisheries Project including project planning, O&M, research, data management, and habitat improvement and acquisition actions in the Klickitat Subbasin. Anadromous $445,344 $458,674 $472,433 $445,344 $458,674 $472,433 $ 0 $ 0 $ 0
253 198902401 Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River Basin. State Oregon Department of Fish & Wildlife (ODFW) Ongoing Columbia Plateau Umatilla To evaluate migration patterns, abundance and survival of hatchery & natural smolts in the Umatilla basin using PIT tag technology; install an adult ladder detector at TMFD; assess affects of river variables on fish migration; monitor life history charac Anadromous $549,550 $398,065 $416,435 $549,550 $398,065 $416,435 $ 0 $ 0 $ 0
749 198902700 Power Repay Umatilla Basin Project Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau Umatilla Provide reimbursement of power costs to Umatilla Electric Coopeative and Pacific Powr & Light Company for the Umatilla Basin Project pumping plants that provide Columbia River water to irrigators in exchange for Umatilla River water left instream Anadromous $1,560,000 $1,560,000 $1,560,000 $1,560,000 $1,560,000 $1,560,000 $ 0 $ 0 $ 0
548 198903500 Umatilla Hatchery Operation and Maintenance and Fish Liberations State Oregon Department of Fish & Wildlife (ODFW) Ongoing Columbia Plateau Umatilla This proposal funds operation and maintenance of Umatilla Hatchery and fish transfers from the Umatilla, Cascade, Oxbow, Bonneville, and Little White hatcheries to acclimation facilities on the Umatilla River. Anadromous $951,664 $981,110 $1,011,412 $951,664 $981,110 $1,011,412 $ 0 $ 0 $ 0
218 198906201 Annual Work Plan CBFWA NPO Columbia Basin Fish & Wildlife Authority (CBFWA) Ongoing Mainstem/Systemwide Systemwide Coordinate fish and wildlife manager participation in regional mitigation activities for implementation of the NPCC's Program including RM&E, project and program review, subbasin plan implementation, program amendment recommendations, etc. All $2,253,787 $2,253,787 $2,253,787 $2,253,787 $2,253,787 $2,253,787 $ 0 $ 0 $ 0
368 198909600 Genetic Monitoring of Snake River Chinook Salmon and Steelhead Federal Northwest Fisheries Science Center Ongoing Mainstem/Systemwide Systemwide Direct and indirect estimates of reproductive success. Estimate selection gradients in hatchery and wild. Monitor changes in hatchery, natural (supplemented), and wild (unsupplemented) populations. Evaluate effectiveness of hatchery supplementation Anadromous $513,210 $527,980 $543,280 $513,210 $527,980 $543,280 $ 0 $ 0 $ 0
663 198909800 Idaho Supplementation Studies Multiple Idaho Department of Fish and Game/NPT/SBT/USFWS Ongoing Mountain Snake Salmon The goal of the Idaho Supplementation Studies is to evaluate supplementation as a recovery/restoration strategy for spring/summer Chinook salmon in Idaho. The project is a multi-agency effort, covering 30 streams throughout the Salmon and Clearwater subba Anadromous $2,014,483 $2,098,127 $2,207,751 $2,014,483 $2,098,127 $2,207,751 $ 0 $ 0 $ 0
121 198910700 Statistical Support For Salmonid Survival Studies Edu University of Washington Ongoing Mainstem/Systemwide Systemwide Improve monitoring and evaluation capabilities by developing state-of-the-art study designs and analysis tools to estimate juvenile and adult salmonid survival and survival relationships. Provide statistical guidance to investigators in the Northwest. Anadromous $371,546 $382,507 $391,038 $371,546 $382,507 $391,038 $ 0 $ 0 $ 0
612 199000500 Umatilla Hatchery - M&E State Oregon Department of Fish & Wildlife (ODFW) Ongoing Columbia Plateau Umatilla This proposal is for ongoing research, monitoring and evaluation of the Umatilla Hatchery program. The Umatilla Hatchery RM&E Project evaluates hatchery practices for steelhead supplementation and spring and fall Chinook salmon reintroduction. Anadromous $684,278 $714,367 $745,852 $684,278 $714,367 $745,852 $ 0 $ 0 $ 0
596 199000501 Umatilla Basin Natural Production Monitoring and Evaluation Project Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau Umatilla Salmonid Monitoring and Evaluation: Provide ecological information and technical services to decision makers in support of adaptive management for sustainable restoration, conservation, and preservation of salmonid and aquatic resources. Anadromous $779,657 $795,314 $831,704 $779,657 $795,314 $831,704 $ 0 $ 0 $ 0
124 199001800 Lake Roosevelt Rainbow Tr Hab/Pass Impr Prog Tribe Colville Confederated Tribes Ongoing Intermountain Sanpoil The Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project is a resident fish substitution project to mitigate for anadromous fish losses above Chief Joseph and Grand Coulee Dams. The goal of the project is to increase natural production. Resident $641,886 $742,850 $542,850 $679,384 $649,533 $499,533 $-37,498 $93,317 $43,317
167 199004400 Coeur D'Alene Reservation Habitat Enhancement (Coeur d'Alene Subbasin) Tribe Coeur D'Alene Tribe Ongoing Intermountain Coeur d'Alene Enhance critical habitat to mitigate limiting factors for westslope cutthroat in 4 target watersheds in the Coeur d'Alene subbasin. Complete monitoring of populations and physical habitat and promote coordination/participation among stakeholders. Resident $1,439,899 $1,483,127 $1,524,634 $1,439,899 $1,483,127 $1,524,634 $ 0 $ 0 $ 0
279 199004401 Lake Creek Land Acquisition Tribe Coeur D'Alene Tribe Ongoing Intermountain Coeur d'Alene This project is intended to protect, enhance, and maintain wetland and riparian habitat in the Lake Creek drainage to provide a minimum of 760 HUs to credit against construction and inundation losses attributed to the Albeni Falls Dam. Wildlife Capitalize land acquisition Land acquisition requirements $1,208,514 $1,215,826 $1,367,427 $1,208,514 $1,215,826 $1,367,427 $ 0 $ 0 $ 0
270 199005500 Idaho Steelhead Monitoring and Evaluation Studies State Idaho Department of Fish & Game Ongoing Mountain Snake Clearwater This project collects and monitors life history, genetic, and abundance data from wild steelhead populations in Idaho. Anadromous $810,260 $830,638 $759,695 $810,260 $830,638 $759,695 $ 0 $ 0 $ 0
288 199007700 Dev Of Systemwide Predator Control for Northern Pikeminnows. Federal Pacific States Marine Fisheries Commission (PSMFC) Ongoing Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince The Northern Pikeminnow Management Program is designed to remove predator-sized northern pikeminnows at an annual rate of 10-20%, resulting in the restructuring of their population which modeling shows could reduce predation on juvenile salmonids by 50%. Anadromous $3,884,045 $3,990,748 $4,102,784 $3,884,045 $3,990,748 $4,102,784 $ 0 $ 0 $ 0
106 199008000 Columbia Basin Pit-Tag Information System. Federal Pacific States Marine Fisheries Commission (PSMFC) Ongoing Mainstem/Systemwide Systemwide Provides basic infrastructure for all PIT tag related projects in Columbia River Basin. Operates and maintains long-term data repository for PIT tag information,.Operates and maintains permanent PIT tag interrogation sites. Supports other PIT research. Anadromous $2,531,577 $2,692,839 $2,800,553 $2,531,577 $2,692,839 $2,800,553 $ 0 $ 0 $ 0
161 199009200 Wanaket Wildlife Area Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau Umatilla Continue operations and maintenance of the 2,765 acre Wanaket Wildlife Area to provide 2,334 habitat units of protection credits and generate 2,495 habitat units of enhancement credits. Primary habitat types include wetland and shrub-steppe/grassland. Wildlife $233,337 $242,653 $251,401 $233,337 $242,653 $251,401 $ 0 $ 0 $ 0
549 199101901 Hungry Horse Mitigation/Flathead Lake Tribe Salish & Kootenai Confederated Tribes Ongoing Mountain Columbia Flathead This project mitigates the impacts of Hungry Horse Dam on downstream aquatic environments within the Flathead Indian Reservation. It includes components of monitoring, research, and implementation. Resident $174,000 $408,000 $412,000 $174,000 $408,000 $412,000 $ 0 $ 0 $ 0
496 199101903 Hungry Horse Mitigation Program State Montana Department of Fish, Wildlife and Parks Ongoing Mountain Columbia Flathead Fisheries mitigation for the construction and operation of Hungry Horse Dam. Implements habitat restoration, improves fish passage, protects and recovers native fish populations and reestablishes fish harvest opportunities. Resident $1,655,000 $1,815,000 $1,905,000 $1,655,000 $1,815,000 $1,905,000 $ 0 $ 0 $ 0
695 199101904 Hungry Horse Mitigation - Stocking of Offsite Waters - Creston NFH Federal Creston NFH Ongoing Mountain Columbia Flathead The Creston National Fish hatchery produces fish for offsite stocking locations to mitigate for losses to the Flathead Lake and River system caused by the construction and operation of Hungry Horse Dam. Resident $139,393 $143,619 $148,001 $139,393 $143,619 $148,001 $ 0 $ 0 $ 0
194 199102800 Pit Tagging Wild Chinook Federal National Oceanic & Atmospheric Administration (NOAA) Ongoing Mountain Snake Salmon Collect time series information to examine migration/survival characteristics of wild ESA-listed Snake River spring/summer chinook salmon stocks. PIT tag wild chinook salmon parr annually; then monitor as parr/smolts at instream monitors, traps, and dams. Anadromous $591,990 $609,749 $628,043 $591,990 $609,749 $628,043 $ 0 $ 0 $ 0
545 199102900 Research, monitoring, and evaluation of emerging issues and measures to recover the Snake River fall Chinook salmon ESU Federal US Fish & Wildlife Service (USFWS) Ongoing Mainstem/Systemwide Systemwide Our study seeks to identify the factors that contribute to changes in life history timing, growth, and survival of fall Chinook salmon juveniles so that decisions on hydrosystem operation and supplementation can be made informatively. Anadromous $499,731 $499,731 $499,731 $499,731 $499,731 $499,731 $ 0 $ 0 $ 0
466 199104600 Spokane Tribal (Galbr Sprgs) H Tribe Spokane Tribe Ongoing Intermountain Columbia Upper Operate and maintain the Spokane Tribal Hatchery to aid in the restoration and enhancement of the Lake Roosevelt and Banks Lake fisheries. Resident $974,000 $640,280 $670,720 $974,000 $640,280 $670,720 $ 0 $ 0 $ 0
151 199104700 Sherman Creek Hatchery - O&M State Washington Department of Fish and Wildlife (WDFW) Ongoing Intermountain Columbia Upper Operate and maintain Sherman Creek Hatchery and the Lake Roosevelt Net Pens to aid in the restoration and enhancement of the Lake Roosevelt and Banks Lake Fisheries. SCH is a key component of the Lake Roosevelt Fishery Enhancement Project. Resident $280,780 $294,816 $309,558 $280,780 $294,816 $309,558 $ 0 $ 0 $ 0
413 199105100 M&E Statistical Support For Life-Cycle Studies Edu University of Washington Ongoing Mainstem/Systemwide Systemwide Develop statistical methods for monitoring and evaluating salmonid recovery plans. Provide added-value analyses and statistical support on regional fisheries issues. Provide smolt migration timing predictions on the internet. Anadromous $473,086 $485,492 $498,267 $473,086 $485,492 $498,267 $ 0 $ 0 $ 0
165 199106000 Pend Oreille Wetlands Wildlife Mitigation Project - Kalispel Tribe Kalispel Tribe Ongoing Intermountain Pend Oreille The Pend Oreille Wetlands project is a 600-acre property to partially mitigate for wildlife habitat losses due to the construction and inundation at Albeni Falls Dam. Wildlife $112,967 $118,445 $124,000 $112,967 $118,445 $124,000 $ 0 $ 0 $ 0
346 199106100 Swanson Lake Wildlife Mitigation Project (Swanson Lakes Wildlife Area) State Washington Department of Fish and Wildlife (WDFW) Ongoing Columbia Plateau Crab Protect, increase, and maintain a viable sharp-tailed grouse meta population, increase mule deer use of the project site, and enhance habitat for shrubsteppe obligate species, as mitigation for losses associated with the Grand Coulee Dam. Wildlife $258,085 $236,322 $244,596 $258,085 $236,322 $244,596 $ 0 $ 0 $ 0
419 199106200 Spokane Tribe Wildlife Mitigation Tribe Spokane Tribe Ongoing Intermountain Spokane The project is the Spokane Tribes Wildlife Mitigation Project that acquires property as partial mitigation for construction and inundation losses at Grand Coulee Dam. FY07-09 will focus on the acquisition of Forest Capital lands on the Reservation. Wildlife Capitalize land acquisition Land acquisition requirements $2,360,000 $2,363,300 $2,366,700 $2,360,000 $2,363,300 $2,366,700 $ 0 $ 0 $ 0
286 199107100 Snake River Sockeye Salmon Habitat and Limnological Monitoring Tribe Shoshone Bannock Tribes Ongoing Mountain Snake Salmon This project will monitor and enhance (if necessary) rearing conditions for juvenile Snake River sockeye salmon. We will also investigate competition, growth rates, and survival for progeny released from the captive broodstock program. Anadromous $450,900 $456,591 $460,458 $450,900 $456,591 $460,458 $ 0 $ 0 $ 0
166 199107200 Redfish Lake Sockeye Salmon Captive Broodstock Program State Idaho Department of Fish & Game Ongoing Mountain Snake Salmon Establish captive broodstocks of Redfish Lake sockeye salmon. Spawn captive adults to produce eggs, juveniles, and adults for reintroduction and future broodstock needs. Evaluate juvenile out-migration and adult returns by release option. Anadromous $1,086,118 $1,135,362 $1,172,418 $1,086,118 $1,135,362 $1,172,418 $ 0 $ 0 $ 0
203 199107300 Idaho Natural Production Monit State Idaho Department of Fish & Game Ongoing Mountain Snake Salmon We propose to refine the description of population structure of spring/summer Chinook in Idaho, monitor juvenile production of Chinook/steelhead, evaluate survival/productivity of Chinook, and estimate annual abundance of Chinook redds in the upper Salmon Anadromous $960,900 $1,008,950 $1,059,410 $784,640 $784,640 $784,640 $176,260 $224,310 $274,770
565 199107800 Burlington Bottoms Wildlife Mitigation Project State Oregon Department of Fish & Wildlife (ODFW) Ongoing Lower Columbia Willamette This project will restore and maintain wildlife habitat for a variety of fish and wildlife species on 417 acres of wetlands & riparian forests. On-going work includes wetland restoration, O&M, as well as monitoring and evaluation of enhancement activitie Wildlife $112,735 $110,631 $111,609 $112,735 $110,631 $111,609 $ 0 $ 0 $ 0
216 199200900 Yakima Phase II/Huntsville Screen Operation & Maintenance State Washington Department of Fish and Wildlife (WDFW) Ongoing Columbia Plateau Yakima Continue to provide operation and maintenance to BPA's Phase II Fish Screen Facilities to ensure they provide maximum protection to all species and life stages of fish. This O&M function will include the addition of the Manastash basin facilities Anadromous $177,011 $182,322 $187,792 $177,011 $182,322 $187,792 $ 0 $ 0 $ 0
487 199201000 Habitat Imprvmnt/Enhnmnt - Fort Hall, Idaho Tribe Shoshone Bannock Tribes Ongoing Upper Snake Snake Upper Provide conditions to maintain a self-perpetuating trout fishery for the tribal membership and general public through implementation of habitat restoration, enhancement, and protection projects on the Fort Hall Reservation. Resident $245,641 $295,641 $283,718 $245,641 $295,641 $283,718 $ 0 $ 0 $ 0
479 199202601 Grand Ronde Model Watershed Program Habitat Restoration - Planning, Coordination and Implementation NPO Grande Ronde Model Watershed Foundation Ongoing Blue Mountain Grande Ronde The project coordinates BPA funded restoration activities in the Grande Ronde and Imnaha Subbasins working with tribes, agencies and landowners. The project annually implements 10-20 habitat restoration projects. Anadromous $1,346,055 $1,349,369 $1,352,869 $1,346,055 $1,349,369 $1,352,869 $ 0 $ 0 $ 0
240 199202603 Upper Salmon Basin Watershed Project (USBWP) provides technical and administrative support with project implementation guidance to landowners to implement fish habitat projects on private lands. State Idaho Soil Conservation Commission Ongoing Mountain Snake Salmon To provide local coordination, guidance, and implementation of on-the-ground projects that improve and enhance anadromous and resident fish habitat and fish passage. Anadromous $1,367,036 $1,377,730 $1,388,744 $1,367,036 $1,377,730 $1,388,744 $ 0 $ 0 $ 0
380 199202604 Investigate Life History Of Spring Chinook Salmon and Summer Steelhead in the Grande Ronde River Subbasin State Oregon Department of Fish & Wildlife (ODFW) Ongoing Blue Mountain Grande Ronde Investigate the abundance, migration patterns, survival, and life history characteristics of spring Chinook salmon and summer steelhead from supplemented and natural populations in the Grande Ronde River Subbasin. Anadromous $861,203 $900,222 $941,130 $861,203 $900,222 $941,130 $ 0 $ 0 $ 0
317 199204000 Redfish Lake Sockeye Salmon Captive Broodstock Rearing and Research Federal National Oceanic & Atmospheric Administration (NOAA) Ongoing Mountain Snake Salmon This ongoing project provides a safety net captive broodstock program preventing the extinction of Redfish Lake sockeye salmon. It also produces prespawning adults and eyed eggs for use in Idaho's recovery efforts for this ESA-listed endangered species. Anadromous $824,994 $857,994 $892,312 $824,994 $857,994 $892,312 $ 0 $ 0 $ 0
491 199204800 Colville Confederated Tribes Wildlife Mitigation Project Tribe Colville Confederated Tribes Ongoing Intermountain Columbia Upper The focus of the CCT Wildlife Mitigation Project is the protection/restoration/enhancement of critical winter habitat, riparian, shrub-steppe, and other species and habitats on lands purchased/managed for mitigation on the Colville Indian Reservation Wildlife $1,180,000 $1,200,000 $1,200,000 $953,334 $973,333 $973,333 $226,666 $226,667 $226,667
547 199205900 Amazon Basin/Eugene Wetlands - NPO Nature Conservancy Ongoing Lower Columbia Willamette Continue restoration and enhancement of Willow Creek Wildlife Wildlife Mitigation Area. Habitats being protected or restored include riparian zones of seasonal streams, wet prairie, upland prairie, forested wetland, oak woodland, and dry coniferous fores Wildlife $98,764 $583,766 $91,267 $98,764 $583,766 $91,267 $ 0 $ 0 $ 0
171 199206100 Albeni Falls Wildlife Mitigation State Albeni Falls Interagency Work Group Ongoing Intermountain Pend Oreille Protect, restore, enhance, and maintain wetland and wildlife habitat in Pend Oreille, Coeur d'Alene, and Kootenai Subbasins as ongoing mitigation for impacts associated with the construction and innundation of the Albeni Falls hydroelectric project. Wildlife Capitalize land acquisition Land acquisition requirements $7,949,297 $8,103,022 $8,342,004 $7,949,297 $8,103,022 $8,342,004 $ 0 $ 0 $ 0
459 199206200 Yakama Nation - Riparian/Wetlands Restoration Tribe Yakama Confederated Tribes Ongoing Columbia Plateau Yakima Continue implementation on YN Wetlands/Riparian Restoration Project by protecting and restoring native floodplain habitats along anadromous fish-bearing waterways in the agricultural area of the Yakama Reservation (~2,000 acres per year). Anadromous $1,575,163 $1,623,313 $1,673,842 $1,575,163 $1,623,313 $1,673,842 $ 0 $ 0 $ 0
197 199206800 Willamette Basin Mitigation State Oregon Department of Fish & Wildlife (ODFW) Ongoing Lower Columbia Willamette ODFW's proposal provides an integrative mitigation program that protects, conserves, and restores areas containing diverse habitats that assist the life history needs and resources for multiple terrestrial and aquatic species in the Willamette Basin. Wildlife Capitalize land acquisition and permanent easements Land acquisition requirements $2,816,657 $4,000,143 $4,012,310 $2,766,657 $3,950,143 $3,962,310 $50,000 $50,000 $50,000
472 199302900 Survival Estimates for the Passage of Juvenile Salmonids Through Snake and Columbia River Dams and Reservoirs Federal Northwest Fisheries Science Center Ongoing Mainstem/Systemwide Systemwide Provide precise measurements of survival of juvenile salmon as they migrate through dams and reservoirs in the Snake and Columbia Rivers and relate to adult returns. Anadromous $1,688,376 $1,739,026 $1,791,197 $1,688,376 $1,739,026 $1,791,197 $ 0 $ 0 $ 0
342 199303501 Red River Restoration O & M State Idaho Department of Fish & Game Ongoing Mountain Snake Clearwater Restore stream channel to a functioning system by establishing riparian shrub community on Red River within Red River WMA. Restoration critical to the development of high quality fish & wildlife habitat and streambank stabilization. Anadromous $104,993 $107,412 $56,870 $104,993 $107,412 $56,870 $ 0 $ 0 $ 0
351 199304000 Fifteenmile Creek Habitat Restoration and Monitoring Project State Oregon Department of Fish & Wildlife (ODFW) Ongoing Columbia Gorge Fifteenmile Provide continued operation and maintenance on previously installed fencing and instream habitat, monitor the success of all restoration efforts, and begin implementation to improve instream habitat complexity within the Fifteenmile Creek Subbasin. Anadromous $375,687 $388,463 $395,156 $375,687 $388,463 $395,156 $ 0 $ 0 $ 0
182 199305600 Research to advance hatchery reform, including captive broodstocks Federal Northwest Fisheries Science Center Ongoing Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince This project will provide guidance on management of Columbia River Basin hatcheries, including captive broodstocks. Research will focus on developing methods to improve broodstock management and fish quality and reduce negative ecological interactions. Anadromous $1,474,045 $1,512,513 $1,567,424 $1,474,045 $1,512,513 $1,567,424 $ 0 $ 0 $ 0
442 199306000 Select Area Fisheries Enhancement Project State Oregon Department of Fish & Wildlife (ODFW) Ongoing Columbia Estuary Columbia Estuary This project produces known stock anadromous salmonids for commercial and recreational harvest in Select Area and other regional fisheries. Anadromous $1,804,868 $1,779,000 $1,827,028 $1,804,868 $1,779,000 $1,827,028 $ 0 $ 0 $ 0
110 199306600 Oregon Fish Screens Project State Oregon Department of Fish & Wildlife (ODFW) Ongoing Columbia Plateau John Day The project provides immediate and long-term protection for anadromous and resident fish species in the John Day, Umatilla, and Walla Walla basins by the installation or replacement of out dated fish protection and passage devices on irrigation diversions Anadromous Expense - fish sreens not functionally interdependent $1,015,374 $1,073,876 $1,136,071 $1,015,374 $1,073,876 $1,136,071 $ 0 $ 0 $ 0
306 199401500 Idaho Fish Screening and Passage Improvements State Idaho Department of Fish & Game Ongoing Mountain Snake Salmon The project protects anadromous fish and improves fish passage in Idahos anadromous fish corridors by consolidation and elimination of irrigation diversions, conservation of water, and screening fish from gravity and pump water withdrawal systems. Anadromous Expense - fish sreens not functionally interdependent $974,740 $1,015,982 $998,842 $974,740 $1,015,982 $998,842 $ 0 $ 0 $ 0
133 199401805 Continued Implementation of Prioritized Asotin Creek Watershed Habitat Projects SWCD Asotin County Conservation District (ACCD) Ongoing Blue Mountain Asotin On-going project for prioritizing & implementing on-the-ground habitat projects for wild steelhead & Chinook salmon in Asotin watershed. Bull trout also benefit from this ridge-top-to-ridge-top approach with match from private landowners & other grants. Anadromous $275,000 $275,000 $275,000 $275,000 $275,000 $275,000 $ 0 $ 0 $ 0
117 199401806 Tucannon Stream and Riparian Protection, Enhancement, and Restoration SWCD Columbia Conservation District Ongoing Columbia Plateau Tucannon Implement habitat protection, enhancement, and recovery strategies to support Subbasin Plan identified ESA focal, cultural significant and species of interest recovery within the Tucannon Subbasin. Anadromous $330,780 $348,928 $365,502 $330,780 $348,928 $365,502 $ 0 $ 0 $ 0
163 199401807 Improve Habitat For Fall Chinook, Steelhead in the Lower Snake and Tucannon Subbasins SWCD Pomeroy County Soil & Water Conservation District (SWCD) Ongoing Columbia Plateau Tucannon To obtain funding to continue with the districts effort to reduce soil erosion on the uplands and along the streams of Garfield County to improve water quality and fish habitat. Anadromous $199,345 $200,237 $201,154 $199,345 $200,237 $201,154 $ 0 $ 0 $ 0
815 199402600 Pacific Lamprey Research and Restoration Project Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau Umatilla The purpose of this study is to provide the critical information to restore Pacific lampreys Lampetra tridentata in the Umatilla River that is called for in the Draft Umatilla/Willow Subbasin Plan. Anadromous $528,041 $507,930 $533,161 $528,041 $507,930 $533,161 $ 0 $ 0 $ 0
241 199404200 Trout Creek Fish Habitat Restoration Project State Oregon Department of Fish & Wildlife (ODFW) Ongoing Columbia Plateau Deschutes Construction, O&M, and M&E of numerous new and existing instream and riparian habitat restoration projects; Monitoring and Evaluation of summer steelhead smolt production and adult return. M&E of instream and riparian habitat restoration activities. Anadromous $475,545 $499,050 $533,900 $475,545 $499,050 $533,900 $ 0 $ 0 $ 0
332 199404300 Lake Roosevelt Fisheries Evaluation Program (formerly Data Collection) Tribe Spokane Tribe Ongoing Intermountain Columbia Upper The primary task of the LRFEP is to monitor the performance of the Lake Roosevelt hatchery programs. Other tasks included assessing hydro-operations and other factors that may impact hatchery and native fish and reservoir productivity. Resident $1,171,031 $1,219,306 $1,239,716 $1,171,031 $1,219,306 $1,239,716 $ 0 $ 0 $ 0
226 199404400 Enhance, protect and maintain shrub-steppe habitat on the Sagebrush Flat Wildlife Area (SFWA) State Washington Department of Fish and Wildlife (WDFW) Ongoing Columbia Cascade Columbia Upper Middle Protect and enhance habitat to expand and protect pygmy rabbit, sage grouse, sharp-tailed grouse and other shrub-steppe obligate species populations as mitigation for habitat loss associated with the construction of Grand Coulee and Chief Joseph Dams. Wildlife $382,479 $225,977 $239,628 $382,479 $225,977 $239,628 $ 0 $ 0 $ 0
143 199404700 Lake Pend Oreille Fishery Recovery Project: purpose to restore fisheries impacted by the federal hydropower system within the Idaho portion of the Pend Oreille drainage. State Idaho Department of Fish & Game Ongoing Intermountain Pend Oreille Proposal's primary focus is to finish studies to restore kokanee spawning habitat in Lake Pend Oreille and to meet bull trout recovery objectives by balancing predator/prey ratios in the lake and removing the threat of interspecific competition. Resident $944,262 $980,176 $975,483 $944,262 $980,176 $975,483 $ 0 $ 0 $ 0
224 199404900 Kootenai River Ecosystem Improvements Project Tribe Kootenai Tribe of Idaho Ongoing Mountain Columbia Kootenai The Kootenai River Ecosystem Improvements Project proposes to continue monitoring key ecological functions of the Kootenai River ecosystem and to mitigate for nutrients lost to hydro operations at Libby Dam. Habitat complexity evaluation is proposed. Resident $1,785,104 $1,782,556 $1,831,206 $1,785,104 $1,782,556 $1,831,206 $ 0 $ 0 $ 0
486 199405000 Salmon River Habitat Enhancement Tribe Shoshone Bannock Tribes Ongoing Mountain Snake Salmon Continue to monitor and evaluate previous habitat enhancemnet efforts and the effects of mine impacts. Complete preliminary data collection and feasability studies on two new locations for habitat enhancements in the Upper Salmon River Subbasin. Anadromous $408,911 $425,702 $393,311 $408,911 $425,702 $393,311 $ 0 $ 0 $ 0
434 199405400 Migratory Patterns, Structure, Abundance and Status of Bull Trout Populations in Subbasins of the Columbia Gorge, Columbia Plateau and Blue Mountain Provinces State Oregon Department of Fish & Wildlife (ODFW) Ongoing Mainstem/Systemwide Systemwide Proposed objectives address distribution and temperature associations of subadults in Mill Cr./Walla Walla R.) migration characteristics of Hood River bull trout and development of bull trout monitoring plan for the Grand Ronde and John Day subbasins. Resident $466,260 $460,337 $453,849 $466,260 $460,337 $453,849 $ 0 $ 0 $ 0
164 199405900 Yakima Basin Environmental Education Program Private Eco-Northwest Ongoing Columbia Plateau Yakima Educate teachers, students, and public about local watershed natural resources and involve them in positive action projects. Anadromous $177,000 $177,000 $177,000 $177,000 $177,000 $177,000 $ 0 $ 0 $ 0
320 199500100 Kalispel Tribe Resident Fish P Tribe Kalispel Tribe Ongoing Intermountain Pend Oreille This project works to assess and restore native salmonids in tributaries to and enhance largemouth bass populations in the lower Pend Oreille River. Activities include habitat and population assessments, habitat restoration, and non-native fish removals. Resident $520,815 $544,049 $568,061 $520,815 $544,049 $568,061 $ 0 $ 0 $ 0
500 199500400 Libby Mitigation Program State Montana Department of Fish, Wildlife and Parks Ongoing Mountain Columbia Kootenai Fisheries mitigation for the construction and operation of Libby Dam. Implements habitat restoration, improves fish passage, protects and recovers native fish populations and reestablishes fish harvest opportunities. Resident $816,935 $841,925 $843,710 $816,935 $841,925 $843,710 $ 0 $ 0 $ 0
463 199500900 Lake Roosevelt Rainbow Trout N NPO Lake Roosevelt Development Association Ongoing Intermountain Columbia Upper Operate and maintain the Lake Roosevelt Rainbow Trout Net Pen Rearing Project to aid volunteer efforts to participate in fishery restoration and enhancement activities. Resident $144,000 $145,000 $146,000 $144,000 $145,000 $146,000 $ 0 $ 0 $ 0
361 199501100 Chief Joseph Kokanee Enhancement Tribe Colville Confederated Tribes Ongoing Intermountain Columbia Upper Protect/enhance natural origin kokanee in the blocked area through hatchery supplementation and habitat improvements. Conduct feasibility studies and implement work elements. Resident $599,802 $681,642 $599,802 $418,749 $418,968 $457,529 $181,053 $262,674 $142,273
229 199501300 Resident Fish Substitution Program Tribe Nez Perce Tribe Ongoing Mountain Snake Clearwater Maintain fish harvest opportunities to partially mitigate for anadromous fisheries losses resulting from migration blockage posed by Dworshak Dam on the North Fork Clearwater River. Resident $252,725 $260,406 $268,369 $188,190 $193,773 $199,537 $64,535 $66,633 $68,832
398 199501500 Duck Valley Fisheries Project  Operations, Maintenance, Monitoring and Evaluation Tribe Shoshone Paiute Tribes Ongoing Middle Snake Owyhee The Shoshone-Paiute Tribes propose to continue with the operations, maintenance, monitoring, and evaluation of three closed reservoir systems on the DVIR as partial mitigation for the loss of anadromous fishes. Resident $508,497 $518,066 $527,779 $508,497 $518,066 $527,779 $ 0 $ 0 $ 0
696 199502700 Lake Roosevelt White Sturgeon Recovery Project Tribe Spokane Tribe Ongoing Intermountain Columbia Upper Project goals are to restore natural recruitment, implement an interim aquaculture program until natural recruitment is restored, and continue to collect baseline stock assessment data to identify and evaluate restoration and management activities. Resident $547,517 $484,318 $477,305 $547,517 $484,318 $477,305 $ 0 $ 0 $ 0
212 199502800 Piscivorous Avian Resource Utilization of Moses Lake and the Relationship to Other Systems State Washington Department of Fish and Wildlife (WDFW) Ongoing Columbia Plateau Crab Recent findings lead us to believe predatory birds may be impacting the resident fishery of lakes within the Columbia Basin including Moses Lake and potentially anadromous fishes within the Mainstem Columbia. All $298,000 $298,000 $298,000 $298,000 $298,000 $298,000 $ 0 $ 0 $ 0
824 199503300 O&M Yakima Basin Fish Screens Federal Bureau of Reclamation Ongoing Columbia Plateau Yakima This proposal provides for continuation of funding for the existing comprehensive operation & maintenance program by the USBR of BPA owned Yakima Phase II fish screening and trapping facilities. Anadromous $95,480 $98,350 $101,300 $95,480 $98,350 $101,300 $ 0 $ 0 $ 0
678 199505700 S Idaho Wildlife Mitigation State Idaho Department of Fish & Game Ongoing Upper Snake Snake Upper This is for on-going coordination within the Council's CBF&W Program; and for operation, maintenance, monitoring and evaluation at wildlife mitigation properties previously acquired with BPA funding, for the Southern Idaho Wildlife Mitigation project. Wildlife $400,738 $406,360 $371,961 $400,738 $406,360 $371,961 $ 0 $ 0 $ 0
758 199505701 S Idaho Wildlife Mitigation State Idaho Department of Fish & Game Ongoing Middle Snake Boise This is for on-going coordination within the Council's CBF&W Program; and for on-going annual operation, maintenance, and monitoring for the Krueger property, purchased by BPA 1999 as part of the Southern Idaho Wildlife Mitigation Project. Wildlife $21,614 $21,570 $22,131 $21,614 $21,570 $22,131 $ 0 $ 0 $ 0
399 199505703 Southern Idaho Wildlife Mitigation Tribe Shoshone Paiute Tribes Ongoing Middle Snake Owyhee The Shoshone-Paiute Tribes propose to protect, enhance/restore and maintain native habitats through land acquisition in the Middle Snake Province as mitigation for the construction of Anderson Ranch, Deadwood, and Black Canyon hydroelectric projects. Wildlife Capitalize land acquisition Land acquisition requirements $2,581,215 $2,664,071 $2,668,763 $2,581,215 $2,664,071 $2,668,763 $ 0 $ 0 $ 0
178 199506001 Iskuulpa Watershed Project Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau Umatilla Continue operations and maintenance of the Iskuulpa Watershed to protect and enhance watershed resources to provide benefits for seven HEP Target Species and anadromous and resident salmonids. Wildlife $180,983 $187,222 $193,764 $180,983 $187,222 $193,764 $ 0 $ 0 $ 0
184 199506325 Yakima Klickitat Fisheries Project - Monitoring And Evaluation Multiple Yakama Nation and WDFW Ongoing Columbia Plateau Yakima Umbrella proposal for monitoring and evaluation of natural production, harvest, ecological and genetic impacts for spring chinook, fall chinook, and coho fisheries enhancement projects in the Yakima Basin. M&E results guide adaptive management decisions. Anadromous $4,529,256 $4,548,515 $4,703,475 $4,529,256 $4,548,515 $4,703,475 $ 0 $ 0 $ 0
481 199506335 YKFP - Klickitat Subbasin Monitoring and Evaluation Tribe Yakama Confederated Tribes Ongoing Columbia Gorge Klickitat Monitoring and evaluation of spring chinook, steelhead, fall chinook, and coho fisheries enhancement projects in the Klickitat Subbasin. M&E results guide adaptive management decisions. Anadromous $2,594,240 $1,350,659 $1,367,010 $2,594,240 $1,350,659 $1,367,010 $ 0 $ 0 $ 0
105 199506425 YKFP Policy/Plan/Technical State Washington Department of Fish and Wildlife (WDFW) Ongoing Columbia Plateau Yakima This project provides the policy and technical support for WDFW participation in the Yakima/Klicktat Fisheries Project. Anadromous $234,101 $241,404 $248,877 $234,101 $241,404 $248,877 $ 0 $ 0 $ 0
723 199600500 ISAB NPO Northwest Power and Conservation Council Ongoing Mainstem/Systemwide Systemwide Provide independent scientific advice and recommendations on issues related to regional fish and wildlife recovery programs under the Northwest Power Act, the Endangered Species Act, and tribal treaties. All $566,718 $583,945 $601,703 $566,718 $583,945 $601,703 $ 0 $ 0 $ 0
309 199601100 Walla Walla Juvenile and Adult Passage Improvements Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau Walla Walla Provide safe passage for migrating juvenile and adult salmonids in the Walla Walla Subbasin by constructing and maintaining passage facilities at irrigation diversion dams and canals and other passage barriers. Anadromous Expense tentative - still under review at this time (functional interdependence issues) $270,000 $950,000 $1,105,000 $270,000 $950,000 $1,105,000 $ 0 $ 0 $ 0
273 199601900 Technical Management Team (TMT) Edu University of Washington Ongoing Mainstem/Systemwide Systemwide The project provides single-point, internet-based access to a subset of information to guide and support BPA's independent decisions pertaining to its responsibilities under the Power Act and Endangered Species Act, as well as tools for data analysis. Anadromous $597,642 $552,925 $578,067 $597,642 $552,925 $578,067 $ 0 $ 0 $ 0
683 199602000 Pit Tagging Spring/Summer Chin Federal Columbia River Fisheries Program Office Ongoing Mainstem/Systemwide Systemwide Adult and juvenile PIT tag recovery data are analyzed to compare survival estimates for transported fish of known origin, downriver stocks, wild and hatchery transported fish and fish handled and not handled at dams. Anadromous $1,757,000 $1,788,425 $1,831,615 $1,757,000 $1,788,425 $1,831,615 $ 0 $ 0 $ 0
640 199602100 Gas Bubble Disease Research & Monitoring of Juvenile Salmonids Federal Columbia River Research Laboratory Ongoing Mainstem/Systemwide Systemwide The States require smolt monitoring for signs of gas bubble disease. We provide training and QA/QC of the monitors with this project. Anadromous $23,946 $25,081 $26,906 $23,946 $25,081 $26,906 $ 0 $ 0 $ 0
219 199603501 Yakama Reservation Watersheds Project Tribe Yakama Confederated Tribes Ongoing Columbia Plateau Yakima The YRWP works to restore natural function to the Satus, Toppenish and Ahtanum Watersheds. Our restoration and monitoring efforts take a comprehensive approach to the restoration of habitat for fisheries resources including steelhead and bull trout. Anadromous $1,074,742 $1,140,151 $1,211,446 $1,074,742 $1,140,151 $1,211,446 $ 0 $ 0 $ 0
223 199604000 Mid-Columbia Coho Restoration Project Tribe Yakama Confederated Tribes Ongoing Columbia Cascade Wenatchee The long term vision of this restoration project is to restore coho salmon to the Wenatchee and Methow river basins at biologically sustainable levels that will support harvest in most years. Anadromous Expense until completion of Step 3 $3,500,945 $2,962,228 $2,884,222 $3,500,945 $2,962,228 $2,884,222 $ 0 $ 0 $ 0
502 199604200 Restore and Enhance Anadromous Fish Populations and Habitat in Salmon Creek Tribe Colville Confederated Tribes Ongoing Columbia Cascade Okanogan This project is directed at reconnecting a productive tributary of the Okanogan River, Salmon Creek. This project involves a 12-year water lease with the Okanogan Irrigation District and construction of a low flow channel within the lower reach. Anadromous Expense - not greater than 15 year life $371,425 $474,922 $1,961,653 $371,425 $474,922 $1,961,653 $ 0 $ 0 $ 0
188 199604300 Johnson Creek Artificial Propagation Enhancement Project Tribe Nez Perce Tribe Ongoing Mountain Snake Salmon The Johnson Creek Artificial Propagation and Enhancement (JCAPE) project is a small-scale (100,000 smolts) supplementation initiative integrated with a monitoring and evaluation program designed to prevent the extirpation of the Johnson Creek stock. Anadromous $1,275,001 $1,330,000 $1,287,999 $1,275,001 $1,330,000 $1,287,999 $ 0 $ 0 $ 0
242 199604601 Walla Walla River Basin Fish Habitat Enhancement Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau Walla Walla The proposed project is a continued effort by the CTUIR to protect and restore habitat critical to the recovery of salmonid fish populations in the Walla Walla River Basin. Anadromous $321,373 $337,443 $354,315 $321,373 $337,443 $354,315 $ 0 $ 0 $ 0
356 199606700 Manchester Spring Chinook Captive Broodstock Project Federal National Oceanic & Atmospheric Administration (NOAA) Ongoing Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince Smolt to adult seawater rearing of spring and summer chinook salmon broodstocks from Idaho's Salmon River and Oregon's Grande Ronde River sub-basins. Provides adult fish for spawning or direct release in recovery programs for ESA-listed stocks. Anadromous $795,407 $636,326 $572,694 $795,407 $636,326 $572,694 $ 0 $ 0 $ 0
125 199607000 Mckenzie Focus Watershed NPO McKenzie Watershed Alliance Ongoing Lower Columbia Willamette Continued administration of McKenzie River Focus Watershed for coordinated planning and monitoring of fish, wildlife and water quality improvement projects and improved resource stewardship through public outreach and education. Anadromous $162,070 $169,121 $176,474 $162,070 $169,121 $176,474 $ 0 $ 0 $ 0
390 199607702 Protect and Restore Lolo Creek Watershed Tribe Nez Perce Tribe DFRM Watershed Division Ongoing Mountain Snake Clearwater Protect and restore the Lolo Creek Watershed to provide quality habitat for anadromous and resident fish. This will be accomplished by watershed resotration projects such as culvert replacement, road obliteration, and streambank stabilization. Anadromous $675,877 $693,099 $634,355 $675,877 $693,099 $634,355 $ 0 $ 0 $ 0
647 199607703 Protect and Restore Waw'aalamnime to 'Imnamatnoon Creek Analysis Area Tribe Nez Perce Tribe DFRM Watershed Division Ongoing Mountain Snake Clearwater This project will protect, restore, and return critical spawning and rearing habitat to the Analysis Area using a holistic approach to restoration. Projects will be coordinated with the USFS. Anadromous $367,843 $367,843 $367,844 $367,843 $367,843 $367,844 $ 0 $ 0 $ 0
115 199607705 Restore McComas Meadows/ Meadow Creek Watershed Tribe Nez Perce Tribe DFRM Watershed Division Ongoing Mountain Snake Clearwater Protect, restore, and enhance the Meadow Creek Watershed to provide quality habitat for anadromous and resident fish. This will be accomplished by watershed resotration projects such as culvert replacement, road obliteration, and streambank stabilization. Anadromous $700,463 $660,022 $732,452 $700,463 $660,022 $732,452 $ 0 $ 0 $ 0
200 199608000 Ne Oregon Wldf Proj (Npt) Precious Lands Tribe Nez Perce Tribe Ongoing Blue Mountain Grande Ronde This project provides an estimated 20,015 Habitat Units for mitigation credits for the Lower Snake Dam complex. It provides 16,286 acres of wildlife habitat and protects 16.6 miles of listed steelhead habitat within the lower Grande Ronde Subbasin. Wildlife $431,426 $492,872 $499,203 $431,426 $492,872 $499,203 $ 0 $ 0 $ 0
231 199608300 CTUIR Grande Ronde Subbasin Restoration Project Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Blue Mountain Grande Ronde The CTUIR Grande Ronde Subbasin Restoration Project plans, designs, implements, maintains, and monitors habitat enhancement and restoration projects in the Grande Ronde Subbasin. Planned FY 2007-09 projects include Meadow Cr, End Cr, Ladd Cr, and main GR Anadromous $190,000 $200,000 $200,000 $190,000 $200,000 $200,000 $ 0 $ 0 $ 0
293 199608600 Clearwater Focus Program, Idaho SCC State Idaho Soil Conservation Commission Ongoing Mountain Snake Clearwater Idaho State co-coordinator of the Clearwater Focus Program to provide technical and management assistance to habitat restoration groups, performs staff functions for Clearwater PAC, and interagency liaison for program development. Anadromous $107,136 $107,136 $107,136 $107,136 $107,136 $107,136 $ 0 $ 0 $ 0
181 199608701 Montana Focus Watershed Coordi Tribe Salish & Kootenai Confederated Tribes Ongoing Mountain Columbia Flathead This program fosters grass roots public involvement, interagency cooperation and cooperative cost-sharing for habitat restoration to offset impacts to fishery resources in the Flathead watershed. Resident $95,650 $101,460 $106,450 $95,650 $101,460 $106,450 $ 0 $ 0 $ 0
328 199609401 Scotch Creek Wildlife Area State Washington Department of Fish and Wildlife (WDFW) Ongoing Columbia Cascade Okanogan Protect, increase, and maintain a viable sharp-tailed grouse population and increase mule deer use of the project site. Enhance shrub-steppe and forested habitats for sharp-tailed grouse, mule deer and other obligate species. Wildlife $407,693 $385,890 $426,739 $407,693 $385,890 $426,739 $ 0 $ 0 $ 0
765 199700100 Idaho Chinook Salmon Captive R State Idaho Department of Fish & Game Ongoing Mountain Snake Salmon The IDFG captive rearing program was developed to increase the number of naturally spawning adults and maintain metapopulation structure in selected populations at high risk of extinction while avoiding the impacts of multigenerational hatchery culture. Anadromous $594,773 $612,747 $631,665 $594,773 $612,747 $631,665 $ 0 $ 0 $ 0
126 199700400 Resident Fish Stock Status Above Chief Joseph and Grand Coulee Dams Tribe Kalispel Tribe Ongoing Intermountain None Selected The Joint Stock Assessment Project goals are to assess the current resident fish and habitat conditions of the blocked area and implement management recommedations based on research results. Resident $622,049 $692,120 $663,233 $622,049 $692,120 $663,233 $ 0 $ 0 $ 0
233 199701100 Shoshone-Paiute Habitat Enhanc Tribe Shoshone Paiute Tribes Ongoing Middle Snake Owyhee The Shoshone-Paiute Tribes propose to continue O&M and implementation of spring and stream enhancement projects that protect wild fish stocks and improve the function of key watershed processes. Resident $309,587 $315,926 $323,149 $309,587 $315,926 $323,149 $ 0 $ 0 $ 0
252 199701325 Yakima/Klickitat Fisheries Project Operations and Maintenance Tribe Yakama Confederated Tribes Ongoing Columbia Plateau Yakima The O & M sub-proposal currently covers the following YKFP fish production and research facilities: the Cle Elum Supplementation and Research Facility (CESRF), the Prosser Fish Facility, and the Marion Drain Fish Facility. Anadromous $2,823,155 $2,865,761 $2,999,028 $2,823,155 $2,865,761 $2,999,028 $ 0 $ 0 $ 0
745 199701335 Klickitat Fishery YKFP O & M Tribe Yakama Confederated Tribes Ongoing Columbia Gorge Klickitat YKFP O&M activities to acclimate 1,000,000 coho and 2,000,000 fall chinook at the Wahkiacus Hatchery and Acclimation Facility consistent with Hatchery Scientific Review Group recommendations. Anadromous $ 0 $ 0 $250,000 $ 0 $ 0 $250,000 $ 0 $ 0 $ 0
298 199701501 Imnaha River Smolt to Adult Return Rate and Smolt Monitoring Project Tribe Nez Perce Tribe Ongoing Blue Mountain Imnaha This project will estimate total juvenile emigrant abundance, smolt survival and smolt-to-adult return rates (SAR) of wild/natural chinook salmon and steelhead at Lower Granite and McNary Dams and support the Smolt Monitoring Program and NEOH M&E Projects Anadromous $324,987 $340,062 $355,135 $324,987 $340,062 $355,135 $ 0 $ 0 $ 0
205 199701900 Evaluate the Life History of Native Salmonids in the Malheur Subbasin Tribe Burns Paiute Tribe Ongoing Middle Snake Malheur The proposed project is to collect critical information for the effective management of native salmonids in the Malheur River Subbasin. The project will identify and provide a monitoring and evaluation plan to track population trend of native salmonids. Resident $352,558 $312,261 $257,719 $352,558 $312,261 $257,719 $ 0 $ 0 $ 0
666 199702400 Avian Predation on Juvenile Salmonids in the Lower Columbia River Edu Oregon State University Ongoing Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince Determine predation rates by waterbirds on juvenile salmonids, evaluate the efficacy of management initiatives to reduce avian predation, and assist resource managers in the development of plans for long-term management of avian predation, as warranted. Anadromous $700,000 $860,000 $900,000 $700,000 $860,000 $900,000 $ 0 $ 0 $ 0
323 199703000 Chinook Salmon Adult Abundance Monitoring [Formerly - Listed Stock Adult Escapement] Tribe Nez Perce Tribe Ongoing Mountain Snake Salmon This project collects data for long-term monitoring of trends in wild adult salmon stock abundance and productivity in a control or reference stream in the South Fork Salmon River for use in management and listed species recovery metrics monitoring Anadromous $305,071 $314,076 $323,350 $305,071 $314,076 $323,350 $ 0 $ 0 $ 0
201 199703800 Listed Stock Chinook Salmon Gamete Preservation Tribe Nez Perce Tribe Ongoing Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince Preserve genetic diversity of endemic Snake River basin Chinook Salmon and steelhead using cryogenic technology. Anadromous $339,525 $354,522 $362,233 $339,525 $354,522 $362,233 $ 0 $ 0 $ 0
244 199705100 Yakima Basin Side Channels Tribe Yakama Nation -YKFP Ongoing Columbia Plateau Yakima The Yakima Side Channels project strives to protect the most productive alluvial floodplains through acquisition. The upper watershed is experiencing unprecedented residential growth which threatens to seriously degrade watershed productivity. Anadromous $1,050,000 $1,050,000 $1,050,000 $1,050,000 $1,050,000 $1,050,000 $ 0 $ 0 $ 0
305 199705600 Klickitat Watershed Enhancement Project Tribe Yakama Confederated Tribes Ongoing Columbia Gorge Klickitat KWEP works to restore, enhance, and protect watershed function within the Klickitat subbasin. Project work is emphasized in watersheds and reaches that aid recovery of native salmonid stocks (rainbow/steelhead, sping Chinook, cutthroat, & bull trout). Anadromous $559,671 $1,076,040 $1,067,747 $559,671 $1,076,040 $1,067,747 $ 0 $ 0 $ 0
781 199706000 Focus Watershed Coordinator - Nez Perce Tribe Tribe Nez Perce Tribe Ongoing Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince Manage and implement a comprehensive system to coordinate multiple jurisdictions, agencies, and private landwoners within the Nez Perce Tribe's Treaty Territory. These efforts work toward protecting, restoring, and enhancing watersheds. Anadromous $411,315 $431,469 $459,510 $411,315 $431,469 $459,510 $ 0 $ 0 $ 0
315 199800200 Snake River Native Salmonid Assessment State Idaho Department of Fish & Game Ongoing Middle Snake Snake Upper Middle The goal is to secure long-term persistence of native salmonids in the Upper Snake River Basin, ideally at self-sustaining harvestable levels, by: 1) assessing current status; 2) identifying limiting factors; 3) developing recovery plans where necessary. Resident $341,520 $351,766 $362,320 $341,520 $351,766 $362,320 $ 0 $ 0 $ 0
365 199800300 Spokane Tribe Wildlife Mitigation Operations & Maintenance Tribe Spokane Tribe Ongoing Intermountain Spokane Proposal will be for continued Wildlife Mitigation O&M and enhancement for lands acquired as partial mitigation for Grand Coulee Dam wildlife losses. Project will focus on the management of existing and/or new lands acquired during the project period. Wildlife $287,588 $295,522 $303,710 $287,588 $295,522 $303,710 $ 0 $ 0 $ 0
557 199800401 Columbia Basin Bulletin Private Intermountain Communications Ongoing Mainstem/Systemwide Systemwide Delivers by e-mail (and posted on the web) to policymakers, Basin stakeholders, and general public a weekly electronic newsletter containing objective, timely, summary information about Columbia Basin fish and wildlife mitigation and ESA recovery issues. All $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $ 0 $ 0 $ 0
354 199800702 Gd Ronde Supp Lostine O&M/M&E Tribe Nez Perce Tribe Dept. Fisheries Resource Management Watershed Division Ongoing Blue Mountain Grande Ronde Supplementation and concurrent monitoring and evaluation of Lostine River spring Chinook salmon are accomplished by this project. O&M activities acclimate smolts, trap adults, and spawn adults. M&E provides abundance and life history performance measures. Anadromous $622,578 $640,219 $657,320 $622,578 $640,219 $657,320 $ 0 $ 0 $ 0
204 199800703 Grande Ronde Supplementation Operations and Maintenance Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Blue Mountain Grande Ronde This project conducts O and M for a supplementation program in the upper Grande Ronde River and Catherine Creek. CTUIR operates an acclimation facility and an adult broodstock capture facility on each tributary. Anadromous $766,699 $637,577 $676,840 $766,699 $637,577 $676,840 $ 0 $ 0 $ 0
632 199800704 Grande Ronde Basin Endemic Spring Chinook Supplementation Project: Northeast Oregon hatcheries implementation-ODFW State Oregon Department of Fish & Wildlife (ODFW) Ongoing Blue Mountain Grande Ronde This proposal augments Northeast Oregon spring Chinook programs with funds for Artificial production, fish health, and Redd count surveys to implement the Grande Ronde Basin Spring Chinook Supplementation Project. Anadromous $222,041 $232,878 $244,321 $222,041 $232,878 $244,321 $ 0 $ 0 $ 0
314 199801001 Grande Ronde Captive Brood O&M State Oregon Department of Fish & Wildlife (ODFW) Ongoing Blue Mountain Grande Ronde Captive rearing and spawning of threatened spring Chinook salmon from Catherine Creek, upper Grande Ronde River and Lostine River. Research to evaluate the effectiveness of rearing protocols and treatment and prevention of bacterial kidney disease. Anadromous $829,250 $867,556 $907,684 $829,250 $867,556 $907,684 $ 0 $ 0 $ 0
128 199801003 Spawning distribution of Snake River fall Chinook salmon Federal US Fish & Wildlife Service (USFWS) Ongoing Blue Mountain Snake Hells Canyon Monitor the status and distribution of fall Chinook in the Snake River using redd counts. Report results of all redd searches in the Snake River basin each year. Anadromous $52,000 $52,000 $52,000 $52,000 $52,000 $52,000 $ 0 $ 0 $ 0
311 199801004 Monitor and Evaluate Performance of Juvenile Snake River Fall Chinook Salmon from Fall Chinook Acclimation Facilities Tribe Nez Perce Tribe Ongoing Blue Mountain Snake Hells Canyon Monitor post-release performance and survival of yearling and subyearling fall Chinook from the Fall Chinook Acclimation Project (FCAP) facilities to evaluate success of the fall Chinook supplementation program above Lower Granite Dam. Anadromous $371,780 $365,467 $373,361 $371,780 $365,467 $373,361 $ 0 $ 0 $ 0
307 199801005 Pittsburg Landing Fall Chinook Acclimation Project (FCAP) Tribe Nez Perce Tribe Ongoing Blue Mountain Snake Hells Canyon Supplement natural production of Snake River fall Chinook above Lower Granite Dam through acclimation and final rearing of Lyons Ferry Hatchery yearling and sub-yearlings at two sites on the Snake River and one site on the Clearwater River. Anadromous $760,629 $786,486 $809,565 $760,629 $786,486 $809,565 $ 0 $ 0 $ 0
304 199801006 Captive Broodstock Artificial Propagation Tribe Nez Perce Tribe Ongoing Blue Mountain Grande Ronde Implements the captive broodstock project through the collection of juvenile salmon from the wild and maintaining them in captivity. The founding generation is spawned at maturity and the resulting F1 generation is released back to the parental stream. Anadromous $182,861 $187,940 $193,173 $182,861 $187,940 $193,173 $ 0 $ 0 $ 0
569 199801400 Ocean Survival Of Salmonids Federal National Oceanic & Atmospheric Administration (NOAA) Ongoing Mainstem/Systemwide Systemwide Assess the role of the Columbia River plume and California Current on growth and survival of juvenile salmon from the Columbia River basin. Develop ocean condition indicators that can be used to forecast salmon returns and assess climate change impact. Anadromous $2,499,879 $2,578,533 $2,655,894 $2,499,879 $2,578,533 $2,655,894 $ 0 $ 0 $ 0
477 199801600 Salmonid Productivity, Escapement, Trend, and Habitat Monitoring in the John Day River Subbasin State Oregon Department of Fish & Wildlife (ODFW) Ongoing Columbia Plateau John Day Research monitoring and evaluation project that monitors anadromous salmonid status and trends in life-stage abundance, survival, and distribution and status and trend in their habitats. Anadromous $997,800 $1,034,705 $1,082,220 $997,800 $1,034,705 $1,082,220 $ 0 $ 0 $ 0
220 199801700 North Fork/Mid-John Day Fish Passage Improvement SWCD Monument & Wheeler SWCDs Ongoing Columbia Plateau John Day We will replace problematic irrigation diversions and culverts in the Lower North Fork and Mid-mainstem John Day Watersheds with fish-friendly structures that ensure fish passage and improve riparian habitat while efficiently meeting landmanagers' needs. Anadromous Expense - Not functionally interdependent $516,795 $498,720 $313,249 $516,795 $498,720 $313,249 $ 0 $ 0 $ 0
363 199801800 John Day Watershed Restoration Tribe Confederated Tribes of Warm Springs Reservation of Oregon Ongoing Columbia Plateau John Day Continue implementation of protection and restoration actions, planned under the John Day Subbasin Plan, to improve water quality, water quantity, and riparian habitat, and to eliminate passage barriers for anadromous and resident fish. Anadromous Expense - small independent projects not capital $1,011,616 $962,383 $924,329 $1,011,616 $962,383 $924,329 $ 0 $ 0 $ 0
455 199801900 Wind River Watershed Restoration SWCD Underwood Conservation District Ongoing Columbia Gorge Wind This project is a continuation of the 2001-2006 Wind River project. The project involves continued montioring of fish populations, project effectiveness, restoration work, public involvement, and technical assistance to landowners. Anadromous $767,217 $775,382 $849,551 $767,217 $775,382 $849,551 $ 0 $ 0 $ 0
209 199802100 Hood River Fish Habitat Tribe Confederated Tribes of Warm Springs Reservation of Oregon Ongoing Columbia Gorge Hood Implement habitat improvement actions in the Hood River subbasin that will support wild fish and supplementation efforts of the Hood River Production Program (HRPP). Anadromous Expense - small independent projects not capital $699,852 $699,825 $699,799 $699,852 $699,825 $699,799 $ 0 $ 0 $ 0
109 199802200 Pine Creek Conservation Area: Wildlife Habitat and Watershed Management on 33,557-acres to benefit grassland, shrub-steppe, riparian, and aquatic species. Tribe Confederated Tribes of Warm Springs Reservation of Oregon Ongoing Columbia Plateau John Day Ongoing wildlife habitat and watershed management on the Pine Creek Conservation Area in FY2007-2009 (includes Pine Creek Ranch and Wagner Ranch acquisitions). Wildlife $278,836 $309,615 $409,792 $278,836 $309,615 $409,792 $ 0 $ 0 $ 0
699 199802800 Trout Creek Watershed Restoration Project SWCD Jefferson County Soil & Water Conservation District (SWCD) Ongoing Columbia Plateau Deschutes Implementation of numerous riparian and upland habitat improvement projects on private lands in the Trout Creek watershed, Deshutes basin. Monitoring and evaluation of current and past projects. Anadromous $263,287 $281,870 $295,428 $263,287 $281,870 $295,428 $ 0 $ 0 $ 0
703 199803100 Implement Wy-Kan-Ush-Mi Wa-Kis Tribe Columbia River Inter-Tribal Fish Commission (CRITFC) Ongoing Mainstem/Systemwide Systemwide This project will provide effective and efficient watershed restoration through coordination and support of tribal restoration planning and project implementation consistent with Wy-Kan-Ush-Mi Wa-Kish-Wit and the NWPCC Fish and Wildlife Program. Anadromous $234,205 $234,205 $234,205 $234,205 $234,205 $234,205 $ 0 $ 0 $ 0
104 199900301 Evaluate Spawning of Fall Chinook and Chum Salmon Just Below the Four Lowermost Mainstem Dams State Oregon Department of Fish & Wildlife (ODFW) Ongoing Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince Monitor, protect, and enhance the spawning populations of fall chinook and chum below Bonneville Dam. Search for evidence of fall chinook spawning below The Dalles, John Day, and McNary dams. Anadromous $1,183,925 $1,216,893 $1,263,378 $1,183,925 $1,216,893 $1,263,378 $ 0 $ 0 $ 0
415 199901000 Pine Hollow/Jackknife Habitat SWCD Sherman County Soil & Water Conservation District (SWCD) Ongoing Columbia Plateau John Day Implement practices to reduce erosion, flooding, and protect critical areas in the stream corridor which will allow natural recovery of riparian vegetation and channel stability in the Pine Hollow and Jackknife watersheds. Anadromous $23,609 $23,609 $23,609 $23,609 $23,609 $23,609 $ 0 $ 0 $ 0
396 199901500 Big Canyon Fish Habitat SWCD Nez Perce Soil & Water Conservation District (SWCD) Ongoing Mountain Snake Clearwater Proposal funds installation of BMPs to address agricultural and forestry related habitat degradations. Anadromous $376,943 $370,826 $369,583 $161,631 $161,631 $161,631 $215,312 $209,195 $207,952
759 199901600 Protect & Restore the Big Canyon Creek Watershed Tribe Nez Perce Tribe Dept. Fisheries Resource Management Watershed Division Ongoing Mountain Snake Clearwater This project is to protect, restore, and return critical spawning and reareing habitat using a ridgetop to ridge top approach, based on a complete watershed assessment and following the Clearwater Subbasin Management Plan. Anadromous $455,312 $478,301 $507,369 $165,226 $172,795 $180,819 $290,086 $305,505 $326,550
505 199901700 Protect and Restore Lapwai Creek Watershed Tribe Nez Perce Tribe DFRM Watershed Division Ongoing Mountain Snake Clearwater This project will protect, restore and return critical spawning and rearing fish habitat using a ridge top to ridge top approach, based on a complete watershed assessment. Anadromous $738,199 $760,332 $797,824 $389,770 $398,359 $414,877 $348,429 $361,973 $382,947
493 199901900 Restore Salmon River (Challis, Idaho) SWCD Custer County Soil & Water Conservation District (SWCD) Ongoing Mountain Snake Salmon Passive restoration by securing easements will assist restoration efforts via the Corps 206 Program. The development of side channels will help create a more naturally functioning floodplain, provide a wide array of environmental and ecological benefit. Anadromous Expense -No anadromous fish crediting to meet requirements $480,295 $480,295 $480,295 $480,295 $480,295 $480,295 $ 0 $ 0 $ 0
671 199902000 Analyze Chinook Salmon Spatial and Temporal Dynamics and Persistence Federal US Forest Service (USFS) - Rocky Mt Research Station Ongoing Mainstem/Systemwide Systemwide We propose continuation of research applying a continuous, spatially explicit, and temporally extensive redd database to advance understanding of the spatial and temporal dynamics and factors influencing persistence of wild Chinook salmon populations. Anadromous $88,154 $92,485 $97,035 $88,154 $92,485 $97,035 $ 0 $ 0 $ 0
514 199902500 Sandy River Delta Habitat Restoration Federal US Forest Service (USFS) - Hood River Ongoing Lower Columbia Sandy Restoration of riparian bottomland forest, wetlands and restoration of the original Sandy River channel. Anadromous $188,350 $133,950 $2,091,250 $188,350 $133,950 $2,091,250 $ 0 $ 0 $ 0
382 200000100 Anadromous Fish Habitat & Pass Tribe Colville Confederated Tribes Ongoing Columbia Cascade Okanogan The Tribe proposes continuing habitat rehabilitation efforts to decrease sediment loads and improve passage for anadromous steelhead and salmon. In addition, monitoring and evaluation efforts will assess effectiveness of ongoing activities. Anadromous $186,330 $187,502 $190,440 $186,330 $187,502 $190,440 $ 0 $ 0 $ 0
207 200000400 Monitor, Protect, and Rehabilitation of Bull Trout and Westslope Cutthroat Trout Habitat in the Upper Kootenay River Subbasin State Ministry of Environment Ongoing Mountain Columbia Kootenai Protect Upper Kootenay River bull trout and westslope cutthroat trout from inappropriate reservoir operating regimes and other resource practises by monitoring bull trout spawner returns, their habitat and then rehabilitating their habitat where required. Resident $63,000 $180,000 $297,000 $63,000 $180,000 $297,000 $ 0 $ 0 $ 0
339 200000900 Logan Valley Wildlife Mitigation Site Tribe Burns Paiute Tribe Ongoing Middle Snake Malheur Logan Valley Wildlife Mitigation Site is an ongoing project allowing the Tribe to manage 1760 acres of wet meadow, wetland, forest and sagebrush steppe habitats at the headwaters of the Malheur River while addressing multiple goals for fish and wildlife. Wildlife $146,840 $146,840 $146,840 $151,245 $155,782 $160,455 $-4,405 $-8,942 $-13,615
654 200001200 Evaluate Factors Limiting Columbia River Chum Salmon Federal USFWS-Columbia River Fisheries Program Office Ongoing Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince We propose to evaluate factors limiting Columbia River gorge chum salmon populations. This is to provide an understanding of factors affecting chum salmon spawning primarily in Hardy Creek and Hamilton Springs. Anadromous $304,626 $319,879 $335,131 $304,626 $319,879 $335,131 $ 0 $ 0 $ 0
653 200001400 Evaluate Population Dynamics And Habitat Use Of Lampreys In Cedar Creek (Lewis River Subbasin), Washington. Federal USFWS-Columbia River Fisheries Program Office Ongoing Lower Columbia Lewis The distribution, abundance and status of lamprey in the Columbia River Basin is largely unknown. We propose to investigate these characteristics as well as the methods used to assess these characteristics for lamprey in Cedar Creek. Anadromous $295,350 $254,000 $268,400 $295,350 $254,000 $268,400 $ 0 $ 0 $ 0
102 200001500 Oxbow Conservation Area Management Tribe Confederated Tribes of Warm Springs Reservation of Oregon Ongoing Columbia Plateau John Day The 1,022-acre Oxbow Conservation Area project is a mitigation property acquired by the CTWSRO through BPA funding. This proposal aims to continue the O&M, M&E, and habitat improvement projects on this valuable anadromous fish property. Anadromous $264,366 $211,073 $341,261 $264,366 $211,073 $341,261 $ 0 $ 0 $ 0
670 200001600 Tualatin River NWR Additions Federal Tualatin River NWR Ongoing Lower Columbia Willamette Continue restoration of Oleson Tracts 1 & 2 in accordance with approved 5-year restoration and management plan. Project benefits wildlife and anadromous fish. Wildlife $145,361 $96,685 $372,304 $145,361 $96,685 $372,304 $ 0 $ 0 $ 0
427 200001700 Recondition Wild Steelhead Kelt Tribe Columbia River Inter-Tribal Fish Commission (CRITFC) Ongoing Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince This is an evaluation of kelt steelhead reconditioning and the feasiblity of reestablishing this life history strategy that has been suppressed by the hydrosystem. The program utilizes wild fish that would otherwise become mortalities. Anadromous $945,906 $953,835 $985,931 $945,906 $953,835 $985,931 $ 0 $ 0 $ 0
316 200001900 Tucannon River Spring Chinook Captive Broodstock Program State Washington Department of Fish and Wildlife (WDFW) Ongoing Columbia Plateau Tucannon Conduct the final years of the Tucannon River Spring Chinook Captive Broodstock Program to spawn remaining adult captive broodstock and rear and mark progeny. Release progeny (smolts) into the Tucannon River to help rebuild the run and prevent extinction Anadromous $125,000 $102,000 $58,000 $125,000 $102,000 $58,000 $ 0 $ 0 $ 0
129 200002100 Securing Wildlife Mitigation Sites - Oregon Ladd Marsh WMA and Grande Ronde Subbasin Wetlands State Oregon Department of Fish & Wildlife (ODFW) Ongoing Blue Mountain Grande Ronde Maintain wetland restoration projects on Ladd Marsh WMA. Identify, prioritize, implement and maintain other potential wetland restoration projects in the Grande Ronde subbasin. Wildlife $95,551 $97,650 $100,691 $95,551 $97,650 $100,691 $ 0 $ 0 $ 0
232 200002600 Rainwater Wildlife Area Operations and Maintenance Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau Walla Walla Focus of project is to protect, enhance, maintain, and mitigate fish and wildlife impacted by the Federal Mainstem Columbia River Hydropower System. Project also contributes to anadromous fish (summer steelhead and bull) and habitat in the Walla Walla. Wildlife $304,926 $304,926 $304,926 $304,926 $304,926 $304,926 $ 0 $ 0 $ 0
464 200002700 Acquisition Of Malheur River Wildlife Mitigation Project Tribe Burns Paiute Tribe Ongoing Middle Snake Malheur Malheur River Wildlife Mitigation Site is an ongoing project allowing the Tribe to manage 6385 deeded acres of wet meadow, wetland and sagebrush steppe habitats along the Malheur River while addressing multiple goals for fish, wildlife and tribal members. Wildlife $324,607 $324,607 $324,607 $334,345 $344,375 $354,706 $-9,738 $-19,768 $-30,099
211 200002800 Eval Pacific Lamprey In Clearw State Idaho Department of Fish & Game Ongoing Mountain Snake Clearwater This ongoing project investigates all aspects of Pacifc lamprey life history/ecology in Idaho and defines their present status and distribution in Idaho. This project will continue to add to our knowlege and provide direction for future management. Anadromous $140,365 $137,932 $144,829 $140,365 $137,932 $144,829 $ 0 $ 0 $ 0
256 200003100 North Fork John Day Basin Anadromous Fish Habitat Enhancement Project Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau John Day Increase habitat for Chinook salmon and steelhead on private and public-owned lands via implementing fencing, off-stream water development, revegetation, culvert replacement, pool development, mine tailing removal and large wood placement projects. Anadromous $269,609 $283,090 $297,244 $269,609 $283,090 $297,244 $ 0 $ 0 $ 0
327 200003300 Walla Walla River Fish Passage Operations Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau Walla Walla Increase survival of migrating salmonids in the Walla Walla Basin by coordinating the overall passage program including monitoring passage conditions and operation of passage facilities and transport equipment to provide adequate passage conditions. Anadromous $122,983 $129,132 $135,588 $122,983 $129,132 $135,588 $ 0 $ 0 $ 0
127 200003500 Rehabilitate Newsome Creek - S Tribe Nez Perce Tribe Ongoing Mountain Snake Clearwater Protect and restore Newsome Creek Watershed for the benefit of both anadromous and resident fish using an overall watershed approach. This project is a cooperative effort between the Nez Perce Tribe and the Nez Perce National Forest. Anadromous $766,830 $657,029 $463,784 $766,830 $657,029 $463,784 $ 0 $ 0 $ 0
391 200003600 Protect And Restore Mill Creek Tribe Nez Perce Tribe DFRM Watershed Division Ongoing Mountain Snake Clearwater Protect, restore, and enhance the Mill Creek Watershed to provide quality habitat for anadromous and resident fish. This will be accomplished by watershed resotration projects such as culvert replacement and riparian restoration. Anadromous $245,076 $231,573 $112,707 $245,076 $231,573 $112,707 $ 0 $ 0 $ 0
139 200003800 NEOH Walla Walla Hatchery - Three Step Master Planning Process Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau Walla Walla Complete 3-Step Master Planning process for NEOH Walla Walla Hatchery to produce spring chinook salmon for release in the Walla Walla River Basin. Anadromous $268,675 $225,375 $254,950 $268,675 $225,375 $254,950 $ 0 $ 0 $ 0
381 200003900 Walla Walla Subbasin Collaborative Salmonid Monitoring & Evaluation Project Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau Walla Walla To provide ecological information and technical services to decision makers in support of adaptive management for restoration, conservation, and preservation of cultural, social, and economic salmonid resources. Anadromous $1,417,375 $1,377,482 $1,421,356 $1,417,375 $1,377,482 $1,421,356 $ 0 $ 0 $ 0
535 200100300 Adult Pit Detector Installation Federal Pacific States Marine Fisheries Commission (PSMFC) Ongoing Mainstem/Systemwide Systemwide This project installs and evaluates extended-range interrogation systems for adult and juvenile salmonids. It also assesses the potential impact of adopting alternative technologies such as a new tag model before the technology is adopted or installed. Anadromous $245,491 $184,235 $134,742 $245,491 $184,235 $134,742 $ 0 $ 0 $ 0
725 200102100 15 Mile Creek Riparian Buffers SWCD Wasco County Soil & Water Conservation District (SWCD) Ongoing Columbia Gorge Fifteenmile This proposal develops riparian buffer systems on streams in the Fifteenmile Subbasin and other direct tributaries to the Columbia River in northern Wasco County. Implementation of buffer plans developed under this proposal are fully funded by USDA. Anadromous $86,168 $88,500 $91,887 $86,168 $88,500 $91,887 $ 0 $ 0 $ 0
708 200102600 Status, Genetics, and Life History of Coastal Cutthroat Trout above Bonneville Dam Federal US Geological Survey (USGS) - Cook Ongoing Columbia Gorge Columbia Gorge In an effort to fill a large information need, WDFW and USGS biologists propose to conduct extensive and intensive sampling for coastal cutthroat trout in subbassins of the Columbia River watershed above Bonneville Dam. Anadromous $258,294 $259,033 $252,916 $258,294 $259,033 $252,916 $ 0 $ 0 $ 0
291 200102700 Western Pond Turtle Recovery - Columbia River Gorge - Washington State Washington Department of Fish and Wildlife (WDFW) Ongoing Columbia Gorge Columbia Gorge This project will continue with recovery efforts for the western pond turtle in the Columbia River Gorge. Emphasis will be habitat improvement and predator control. Population augmentation will continue at select sites to aid in recovery. Wildlife $194,387 $175,260 $175,260 $194,387 $175,260 $175,260 $ 0 $ 0 $ 0
297 200102800 Banks Lake Fishery Evaluation Project State Washington Department of Fish and Wildlife (WDFW) Ongoing Columbia Plateau Crab The Banks Lake Fishery Evaluation Project proposes to finish current M&E on kokanee stocking strategies and harvest, evaluate acute predation during stocking events, and construct a brood stock development plan. Resident $482,076 $609,631 $471,756 $294,475 $293,463 $293,463 $187,601 $316,168 $178,293
150 200102900 Ford Hatchery Operations & Maintenance State Washington Department of Fish and Wildlife (WDFW) Ongoing Intermountain Columbia Upper To operate and maintain Ford Hatchery to enhance recreational and subsistence Kokanee Fisheries in Lake Roosevelt and Banks Lake, and boltser put and take resident trout fishing lakes in region1. Resident $121,190 $127,254 $133,623 $121,190 $127,254 $133,623 $ 0 $ 0 $ 0
530 200103100 Intermountain Province Resident Fish Conference and E-Library NPO Lake Roosevelt Forum Ongoing Intermountain Columbia Upper Host conference and e-library to facilitate innovative coordination, planning and assessment of resident fish and related programs in the Intermountain Province, thus improving information exchange among managers, policy makers, scientists and the public. Resident $25,000 $45,000 $45,000 $25,000 $45,000 $45,000 $ 0 $ 0 $ 0
258 200103200 Coeur D'Alene Fisheries Enhancement, Hangman Creek Tribe Coeur D'Alene Tribe Ongoing Intermountain Spokane This project will restore Redband trout (Oncorhynchus mykiss gairdeni) habitat in Hangman Creek and it's tributaries. Resident $542,020 $607,168 $671,139 $542,020 $607,168 $671,139 $ 0 $ 0 $ 0
277 200103300 Hangman Restoration Project Tribe Coeur D'Alene Tribe Ongoing Intermountain Spokane This project will manage approximately 1,200 acres in the Upper Hangman Watershed for wildlife HU crediting against Albeni Falls Dam and protect additional native trout habitats through purchase of concervation easements, leases and possibly fee title. Resident Expense -No resident fish crediting to meet requirements $1,359,863 $1,500,050 $1,507,841 $1,359,863 $1,500,050 $1,507,841 $ 0 $ 0 $ 0
280 200104101 Forrest Conservation Area Management Tribe Confederated Tribes of Warm Springs Reservation of Oregon Ongoing Columbia Plateau John Day The Forrest Conservation Area consists of 4,232 acres and contains 8.5 miles of critical fish habitat in the Upper Mainstem and Middle Fork John Day River systems. Management prioritizes protection of fish, wildlife and their associated habitats. Anadromous $318,783 $278,947 $200,597 $318,783 $278,947 $200,597 $ 0 $ 0 $ 0
283 200105300 Reintroduction of Chum Salmon into Duncan Creek Federal Pacific States Marine Fisheries Commission (PSMFC) Ongoing Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince Monitor and evaluate the reintroduction of chum salmon to Duncan Creek. Three different reintroduction strategies are being evaluated: recolonization via straying, direct adult supplementation to spawning channels and hatchery reared fed-fry releases. Anadromous $326,113 $350,266 $375,029 $326,113 $350,266 $375,029 $ 0 $ 0 $ 0
245 200200200 Restore Natural Recruitment of Kootenai River White Sturgeon Tribe Kootenai Tribe of Idaho Ongoing Mountain Columbia Kootenai Design, implement, and evaluate habitat improvement and creation actions and altered hydro operations, monitor responses, and refine physical and hydraulic models to characterize sturgeon recruitment requirements, implement actions to restore recruitment. Resident $3,452,000 $3,642,000 $3,593,000 $3,452,000 $3,642,000 $3,593,000 $ 0 $ 0 $ 0
344 200200300 Secure & Restore Resident Fish Habitat Tribe Salish & Kootenai Confederated Tribes Ongoing Mountain Columbia Flathead The Confederated Salish and Kootenai Tribes and Montana Fish, Wildlife & Parks will jointly pursue the protection of fisheries habitat through land acquisitions and conservation easements to offst losses due tho the construction of Hungry Horse Dam. Resident Capitalize acquisition and permanent easement Land acquisition requirements $5,265,000 $5,905,000 $5,911,000 $5,265,000 $5,905,000 $5,911,000 $ 0 $ 0 $ 0
810 200200800 Reconnect Kootenai River with the historic floodplain Tribe Kootenai Tribe of Idaho Ongoing Mountain Columbia Kootenai Investigate and implement actions to reconnect the Kootenai River with its historic floodplain. Project objectives are based on ecosystem restoration principles consistent with the subbasin plan, Biological opinion, and White Sturgeon recovery plan. Resident $241,500 $512,000 $551,500 $241,500 $512,000 $551,500 $ 0 $ 0 $ 0
465 200201100 Kootenai Floodplain Operational Loss Assessment Tribe Kootenai Tribe of Idaho Ongoing Mountain Columbia Kootenai Produce an Operational Loss Assessment Tool to estimate aquatic, riparian and associated terrestrial ecological losses due to Libby Dam operations in the Kootenai River floodplain and is applicable to other post-development large river-floodplain systems. Wildlife $774,699 $785,361 $801,901 $774,699 $785,361 $801,901 $ 0 $ 0 $ 0
122 200201301 Water Entity (RPA 151) NWPPC NPO National Fish & Wildlife Foundation Ongoing Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince Fund water right transactions that restore streamflows and focused riparian easements on criticial fish-bearing Columbia Basin tributaries. Implemented as the Columbia Basin Water Transactions Program (CBWTP) in a partnership between BPA and NFWF Anadromous $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 $ 0 $ 0 $ 0
387 200201400 Sunnyside Wildlife Mitigation State Washington Department of Fish and Wildlife (WDFW) Ongoing Columbia Plateau Yakima Maintain funding for ongoing O&M and enhancement of floodplain and shrub-steppe focal habitats on the Sunnyside Wildlife Area. These subbasin plan priorities will partially meet BPA's Columbia River mitigation obligations. Wildlife $375,540 $363,884 $316,590 $375,540 $363,884 $316,590 $ 0 $ 0 $ 0
287 200201500 Provide Coordination and Technical Assistance to Watershed Councils and Individuals in Sherman County, Oregon SWCD Sherman County Soil & Water Conservation District (SWCD) Ongoing Columbia Plateau John Day One watershed council coordinator and three planner/designers will provide support to four watershed councils in Sherman County. All future conservation projects will be based on watershed plans and individual ranch plans developed by these positions. Anadromous $112,352 $116,360 $118,799 $112,352 $116,360 $118,799 $ 0 $ 0 $ 0
525 200201600 Evaluate the Status of Pacific Lamprey in the Lower Deschutes River Subbasin, Oregon Tribe Confederated Tribes of Warm Springs Reservation of Oregon Ongoing Columbia Plateau Deschutes The goal of this project is to determine the status of Pacific lamprey and their habitat in the Deschutes subbasin. Adult escapement and tribal harvest will be estimated. Adult spawning habitat will be described and redd production determined. Anadromous $167,016 $157,686 $161,351 $167,016 $157,686 $161,351 $ 0 $ 0 $ 0
290 200201800 Tapteal Greenway Riparian Corridor Enhancement, Protection and Education Outreach--Phase II (Tapteal Bend and Horn Rapids). NPO Sunday & Associates, Inc for NPO Tapteal Greenway Association Ongoing Columbia Plateau Yakima Continued riparian restoration & erosion control and native tree plantings for shoreline enhancement and sources of LWD, continued salmon life cycle education for schools, and critical habitat purchase, conservation easements and research site monitoring. Anadromous $300,813 $43,785 $43,785 $300,813 $43,785 $43,785 $ 0 $ 0 $ 0
742 200201900 Wasco Riparian Buffers SWCD Wasco County Soil & Water Conservation District (SWCD) Ongoing Columbia Plateau Deschutes This proposal develops riparian buffer systems in southern Wasco County in the lower Deschutes and lower John Day subbasins of the Columbia Plateau Province. Implementation of buffer plans developed under this proposal is fully funded by USDA. Anadromous $85,582 $87,782 $91,032 $85,582 $87,782 $91,032 $ 0 $ 0 $ 0
108 200202501 Yakima Tributary Access & Habitat Program NPO South Central Washington Resource Conservation and Development Ongoing Columbia Plateau Yakima The Yakima Tributary Access and Habitat Program intends to: a) screen diversion structures; b) provide for fish passage at man-made barriers; c) assist landowners improve stream habitat; and, d) coordinate the acquisition of riparian buffer easements. Anadromous Expense - small independent projects not capital $1,008,500 $1,054,300 $1,105,000 $1,008,500 $1,054,300 $1,105,000 $ 0 $ 0 $ 0
372 200202600 Morrow County Riparian Buffers Umatilla County Riparian Buffers SWCD Morrow County Soil & Water Conservation District (SWCD) Ongoing Columbia Plateau Umatilla The Morrow County Riparian Buffers Initiative is requesting funding during fiscal years 2007 through 2009 in conjunction with the Columbia Basin F&W Program and addressed needs identified in the subbasin plan. Anadromous $176,471 $175,097 $178,516 $176,471 $175,097 $178,516 $ 0 $ 0 $ 0
636 200202700 Forecasting Hydrosystem Operations to Benefit Anadromous Fish Migration Federal US Department of Energy (DOE) Ongoing Mainstem/Systemwide Systemwide We propose to apply state-of-the-art computer models that describe the complex power-generation, hydrodynamic, and water quality environment in the lower Snake and lower Columbia rivers and to relate this information back to impacts on migrating salmon. Anadromous $446,547 $451,931 $454,888 $446,547 $451,931 $454,888 $ 0 $ 0 $ 0
706 200203000 Develop Progeny Marker for Salmonids to Evaluate Supplementation Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau Umatilla We propose to assess the relative reproductive success of Umatilla summer steelhead using a pedigree analysis and a laboratory-tested strontium progeny marker injection. Anadromous $304,726 $319,563 $335,711 $304,726 $319,563 $335,711 $ 0 $ 0 $ 0
251 200203100 Growth modulation in salmon supplementation Federal National Oceanic & Atmospheric Administration (NOAA) Ongoing Columbia Plateau Yakima This project assesses and develops methods to control high rates of early male maturation in salmon supplementation programs. Reductions in early male maturation will increase smolt to adult survival and reduce negative genetic and ecological impacts Anadromous $355,378 $373,601 $392,693 $355,378 $373,601 $392,693 $ 0 $ 0 $ 0
704 200203200 Snake River fall Chinook salmon life history investigations Federal US Geological Survey (USGS) - Cook Ongoing Mainstem/Systemwide Systemwide This project investigates the consequences of ocean- and reservoir-type life histories on passage timing, travel rate, survival, and SAR calculations for Snake River fall chinook salmon. Mechanisms and prevalence of these life histories are explored. Anadromous $4,416,192 $3,991,426 $4,094,349 $4,416,192 $3,991,426 $4,094,349 $ 0 $ 0 $ 0
517 200203400 Wheeler Co Riparian Buffers SWCD Wheeler County Soil & Water Conservation District (SWCD) Ongoing Columbia Plateau John Day This proposal will provide technical support and planning needed to implement riparian buffer contracts (CREP) on streams within Wheeler County. Ripairan buffers address many of the limiting factors identified in the John Day Sub-basin Plan Anadromous $89,780 $94,769 $94,094 $89,780 $94,769 $94,094 $ 0 $ 0 $ 0
378 200203500 Gilliam Co Riparian Buffers SWCD Gilliam Soil & Water Conservation District Ongoing Columbia Plateau John Day We seek BPA funding to continue our riparian buffer position. This job entails making 10-15 year contracts with private landowners to establish riparian areas. Non-BPA monies are then leveraged to develop, maintain and enhance fish and wildlife resourc Anadromous $80,221 $84,806 $91,839 $80,221 $84,806 $91,839 $ 0 $ 0 $ 0
808 200203600 Restore Walla Walla River Flow NPO Walla Walla Basin Watershed Council Ongoing Columbia Plateau Walla Walla Irrigation efficiency and shallow aquifer recharge will improve Walla Walla River flows on flow -impaired priority restoration reaches at times of the year that are critical for steelhead, spring Chinook, and bull trout passage and habitat use. Anadromous $469,458 $469,458 $469,458 $469,458 $469,458 $469,458 $ 0 $ 0 $ 0
177 200203700 Freshwater Mussel Research and Restoration Project Tribe Confederated Tribes of the Umatilla Indian Reservation Ongoing Columbia Plateau Umatilla The purpose of this study is to provide information essential for restoration of freshwater mussels in the Umatilla River. Mussel restoration complements the Tribes efforts to rebuild ecosystem diversity, and traditional and cultural opportunities. Resident $294,953 $293,713 $352,316 $294,953 $293,713 $352,316 $ 0 $ 0 $ 0
278 200204500 Coeur D'Alene Fish Habitat Acq Tribe Coeur D'Alene Tribe Ongoing Intermountain Coeur d'Alene This project aims to protect westslope cutthroat trout habitats by acquiring land management rights through purchase of easements, long term leases and possibly fee title. Priority areas have been previously defined by a Prioritization Plan (2003). Resident Expense -No resident fish crediting to meet requirements $1,018,210 $1,021,167 $1,024,283 $1,018,210 $1,021,167 $1,024,283 $ 0 $ 0 $ 0
389 200205000 Continued Riparian Buffer Projects on Couse/Tenmile and other Salmonid Bearing Streams in Asotin County. SWCD Asotin County Conservation District (ACCD) Ongoing Blue Mountain Asotin On-going project to continue implementation of prioritized habitat protection on private property for ESA listed steelhead, Chinook salmon and bull trout as identified in the Asotin Subbasin Plan. Cost share provided by private landowners & other sources Anadromous $240,000 $240,000 $240,000 $240,000 $240,000 $240,000 $ 0 $ 0 $ 0
773 200205300 Assess Salmonids Asotin Cr Ws State Washington Department of Fish and Wildlife (WDFW) Ongoing Blue Mountain Asotin The goal of this project is to assess the status of anadromous salmonid populations in the Asotin Creek watershed. This project implements the RM&E criteria in the Asotin Subbasin Plan for ESA-listed species, primarily steelhead trout, and Chinook salmon. Anadromous $320,516 $213,711 $221,572 $320,516 $213,711 $221,572 $ 0 $ 0 $ 0
331 200205400 Protect & Restore the Asotin Creek Watershed Tribe Nez Perce Tribe DFRM Watershed Division Ongoing Blue Mountain Asotin Continuation and enhancement of cooperative project to protect and restore critical riparian/stream habitat in the Asotin Creek Subbasin thru road decommissioning, streambank stablization and fish passage restoration. Anadromous $392,575 $399,703 $376,783 $392,575 $399,703 $376,783 $ 0 $ 0 $ 0
516 200205900 Yankee Fork Salmon River Dredge Tailings Restoration Project Tribe Shoshone Bannock Tribes Ongoing Mountain Snake Salmon Reconnect the Yankee Fork River to its floodplain and restore natural channel characteristics and processes in a segment impacted by dredge-mining. Integrate biological and physical data with project experiences to develop future restoration alternatives. Anadromous $1,182,328 $1,943,014 $1,305,292 $678,386 $637,367 $629,835 $503,942 $1,305,647 $675,457
589 200206000 Nez Perce Harvest Monitoring Tribe Nez Perce Tribe Ongoing Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince The NPT Harvest Monitoring project collects, analyses, and reports catch data pursuant to pre-planned statistical sampling designs to assure conduct of biologicaly sound harvest strategies for Nez Perce treaty fisheries that may affect ESA listed species. Anadromous $336,447 $346,538 $356,934 $336,447 $346,538 $356,934 $ 0 $ 0 $ 0
650 200206100 Restore Potlatch R Watershed SWCD Latah County Soil & Water Conservation District (SWCD) Ongoing Mountain Snake Clearwater Implementation stage for the Potlatch River Watershed Management Plan with focus on restoration of A-run steelhead spawning and rearing habitat through the implementation of best management practices on private agricultural, forest and range lands. Anadromous $482,106 $476,576 $485,376 $482,106 $476,576 $485,376 $ 0 $ 0 $ 0
397 200207000 Lapwai Cr Anadromous Habitat SWCD Nez Perce Soil & Water Conservation District (SWCD) Ongoing Mountain Snake Clearwater This project restores, protects and enhances steelhead spawing and rearing habitat in the Lapwai Creek Watershed. Information is collected to fill data gaps and BMPs are installed on agricultural and forestlands to achieve biological objectives. Anadromous $485,610 $483,672 $453,104 $261,901 $259,651 $259,651 $223,709 $224,021 $193,453
176 200207200 Protect & Restore Red River Watershed Tribe Nez Perce Tribe Ongoing Mountain Snake Clearwater Protect and restore the Red River Watershed for the benefit of both anadromous and resident fish using an overall watershed approach. This project is a cooperative effort between the Nez Perce Tribe and the Nez Perce National Forest. Anadromous $592,236 $633,002 $550,207 $592,236 $633,002 $550,207 $ 0 $ 0 $ 0
651 200207400 Protect and Restore Crooked Fork to Colt Killed Analysis Area Tribe Nez Perce Tribe DFRM Watershed Division Ongoing Mountain Snake Clearwater This project will protect, restore, and return critical spawning and rearing habitat to the Analysis Area using a holistic approach to restoration. Projects will be coordinated with the Clearwater National Forest. Anadromous $484,395 $484,395 $484,395 $484,395 $484,395 $484,395 $ 0 $ 0 $ 0
269 200300100 Manastash Crk Passage & Screening SWCD Kittitas County Conservation District Ongoing Columbia Plateau Yakima The Manastash Creek Project will provide fish passage, diversion screening and seek instream flow to support fish recovery in the Yakima Basin. This proposal is for Phase 1: screening/passage. Phase 2: instream flow will be a second proposal. Anadromous Capitalize construction (good functionally interdependent example) parts appear functionally interdependent $1,181,220 $492,290 $445,190 $484,630 $607,375 $128,155 $696,590 $-115,085 $317,035
766 200300600 Effectiveness Monitoring of Estuary Restoration in the Grays River and Chinook River Watersheds NPO Columbia River Estuary Study Taskforce (CREST) Ongoing Columbia Estuary Columbia Estuary This project will evaluate the effectiveness of a suite of estuary restoration projects in the Grays River and Chinook River watersheds. Anadromous $163,946 $163,946 $163,946 $163,946 $163,946 $163,946 $ 0 $ 0 $ 0
467 200300700 Lower Columbia River and Estuary Ecosystem Monitoring NPO Lower Columbia River Estuary Partnership (LCREP) Ongoing Columbia Estuary Columbia Estuary This project creates a consistent approach to protocol development and status and trends monitoring of estuarine habitats. The goal is to develop an ecosystem based monitoring program focused on increasing the survival of juvenile salmonids. Anadromous $1,557,223 $2,277,718 $1,734,127 $1,557,223 $2,277,718 $1,734,127 $ 0 $ 0 $ 0
646 200300900 Canada-Usa Shelf Salmon Survival Study Federal Canada Department Of Fisheries & Oceans Ongoing Mainstem/Systemwide Systemwide The primary objective of this research is to determine how the ocean environment and climate affect the production of Columbia River salmon by sampling juvenile salmon and oceanographic data in an area of critical importance to Columbia River salmon. Anadromous $604,400 $598,900 $604,400 $604,400 $598,900 $604,400 $ 0 $ 0 $ 0
542 200301000 Historic Habitat Opportunities and Food-Web Linkages of Juvenile Salmon in the Columbia River Estuary and Their Implications for Managing River Flows and Restoring Estuarine Habitat Federal National Oceanic & Atmospheric Administration (NOAA) Ongoing Columbia Estuary Grays This Phase II estuary project will reconstruct historic changes in rearing opportunities and food web linkages of salmon in the Columbia River estuary and evaluate their implications for managing river flows and restoring estuarine habitats. Anadromous $769,214 $750,067 $756,971 $769,214 $750,067 $756,971 $ 0 $ 0 $ 0
469 200301100 Columbia R/Estuary Habitat NPO Lower Columbia River Estuary Partnership (LCREP) Ongoing Columbia Estuary Columbia Estuary The Lower Columbia River Estuary Partnership seeks to continue its on-the-ground restoration for salmonid species through a continuation of an ecosystem-based effort to identify/implement restoration actions that will assist in species recovery Anadromous $1,532,265 $2,077,056 $2,028,879 $1,532,265 $2,077,056 $2,028,879 $ 0 $ 0 $ 0
310 200301200 Shillapoo Wildlife Area State Washington Department of Fish and Wildlife (WDFW) Ongoing Lower Columbia Columbia Lower The Shillapoo Wildlife Area's principal purpose is to provide high quality habitat for migrating and wintering sandhill cranes, waterfowl and several other key species as mitigation for losses associated with Bonneville, John Day and The Dalles dams. Wildlife $262,023 $291,239 $280,776 $262,023 $291,239 $280,776 $ 0 $ 0 $ 0
710 200301300 Grays River Watershed Restoration NPO Columbia River Estuary Study Taskforce (CREST) Ongoing Columbia Estuary Grays Project restores habitat-forming processes important to enhance chum salmon as well as other declining populations in the Grays River following recommendations being developed during the ongoing BPA-sponsored Grays River Watershed Assessment. Anadromous $589,092 $537,621 $175,054 $589,092 $537,621 $175,054 $ 0 $ 0 $ 0
563 200301700 Integrated Status and Effectiveness Monitoring Program (ISEMP): The design and evaluation of monitoring tools for salmon populations and habitat in the Interior Columbia River Basin. Federal Northwest Fisheries Science Center Ongoing Mainstem/Systemwide Systemwide ISEMP is a collaborative effort to design, implement and evaluate Status and Trends Monitoring for salmon and steelhead populations and habitat and watershed-scale Effectiveness Monitoring for restoration actions impacting salmon habitat in the CRB. Anadromous $3,950,858 $4,520,935 $4,749,337 $3,950,858 $4,520,935 $4,749,337 $ 0 $ 0 $ 0
480 200302200 Okanogan Basin Monitoring and Evaluation Project (OBMEP) Tribe Colville Confederated Tribes Ongoing Columbia Cascade Okanogan Monitor and evaluate important biological, water quality, and physical habitat indicators for anadromous fish throughout the Okanogan River subbasin to establish a long-term status and trend data set and determine responses from habitat restoration effort Anadromous $870,710 $897,898 $924,641 $870,710 $897,898 $924,641 $ 0 $ 0 $ 0
147 200302300 Chief Joseph Hatchery Program Tribe Colville Confederated Tribes Ongoing Columbia Cascade Okanogan CJHP is designed to increase the abundance, productivity, distribution, & diversity of naturally spawning pop. of S/F Chinook salmon in the Okanogan & Columbia Rivers above Wells Dam & reintroduce extirpated spring Chinook salmon to historical habitats. Anadromous Capitalize land acquisition and construction $2,752,798 $16,811,650 $11,748,946 $2,752,798 $16,811,650 $11,748,946 $ 0 $ 0 $ 0
827 200302900 Assess the feasibility of the Upper Malheur Watershed to support the reintroduction of anadromous Fish populations above the Beulah and Warm Springs Reservoirs. Tribe Burns Paiute Tribe Ongoing Middle Snake Malheur Assess the feasibility of the Upper Malheur Watershed to support the reintroduction of anadromous Fish populations above the Beulah and Warm Springs Reservoirs. Complete a pathogen study on all existing pathogens in the Malheur Subbasin Anadromous $91,384 $91,385 $ 0 $91,384 $91,385 $ 0 $ 0 $ 0 $ 0
312 200303600 CBFWA Collaborative Systemwide Monitoring and Evaluation Program NPO Columbia Basin Fish & Wildlife Authority (CBFWA) Ongoing Mainstem/Systemwide Systemwide CSMEP seeks to undertake additional metadata inventories of Columbia subbasin fish data, expand their strength and weaknesses analyses of this existing data, and broaden their collaborative design of improved M&E methods for the Columbia RIver Basin. Anadromous $1,024,245 $1,024,245 $1,024,245 $1,024,245 $1,024,245 $1,024,245 $ 0 $ 0 $ 0
621 200303800 Evaluate Restoration Potential of Snake River Fall Chinook Salmon Spawning Habitat Federal Pacific Northwest National Laboratory Ongoing Mainstem/Systemwide Systemwide The research to be conducted under this proposal will evaluate the restoration potential of mainstem habitats for the Snake River Chinook salmon fall-run ESU. Anadromous $289,960 $378,972 $311,739 $289,960 $378,972 $311,739 $ 0 $ 0 $ 0
160 200303900 Monitor Repro In Wenat/Tuc/Kal Multiple WDFW and NOAA Ongoing Columbia Cascade Wenatchee We propose to continue our quantitative evaluation of the relative reproductive success and survival of naturally spawning hatchery and natural origin spring Chinook salmon in the Wenatchee River watershed above Tumwater Dam. Anadromous $572,670 $582,399 $592,537 $572,670 $582,399 $592,537 $ 0 $ 0 $ 0
353 200304100 Evaluate Hydropwer System-related Latent Mortality Associated with Passage of Yearling Chinook Salmon through Snake River Dams Federal Northwest Fisheries Science Center Ongoing Mainstem/Systemwide Systemwide Determine if downstream migration through three Snake River dams and reservoirs results in latent mortality in Snake River yearling Chinook salmon smolts as hypothesized during the PATH process. Anadromous $1,328,500 $1,346,306 $1,364,645 $1,328,500 $1,346,306 $1,364,645 $ 0 $ 0 $ 0
407 200305000 Eval Of Reprod Of Steelhead Edu University of Washington Ongoing Mainstem/Systemwide Systemwide Evaluate the individual reproductive success of naturally spawning hatchery steelhead relative to that of native wild steelhead using genetic tools and methods. Anadromous $320,447 $259,894 $259,978 $320,447 $259,894 $259,978 $ 0 $ 0 $ 0
845 200305400 Repro Of Steelhead In Hood Riv Edu Oregon State University Ongoing Mainstem/Systemwide Systemwide Continue estimating the reproductive fitness of traditional and supplementation hatchery stocks relative to that of wild fish. New data to include summer run supplem stock vs wild, and effects of mixing 1st generation supplem fish back into hatchery. Anadromous $339,575 $353,157 $371,558 $339,575 $353,157 $371,558 $ 0 $ 0 $ 0
358 200306200 Evaluate the Relative Reproductive Success of Reconditioned Kelt Steelhead Tribe Columbia River Inter-Tribal Fish Commission (CRITFC) Ongoing Mainstem/Systemwide Systemwide Our proposed study will directly measure the reproductive success of natural-origin, hatchery-origin, and reconditioned kelt steelhead in natural streams. This will yield quantitative data replicated geographically and temporally. Anadromous $612,083 $645,912 $672,115 $612,083 $645,912 $672,115 $ 0 $ 0 $ 0
180 200306500 Klickitat River Cooperative Evaluation Program (Formerly Bull Trout Presence, Origin, and Movements In Bonneville Reservoir) State Washington Department of Fish and Wildlife (WDFW) Ongoing Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince Joint operations with Yakama Nation to determine and evaluate anadromous salmon and bull trout population baselines within Klickitat River. Anadromous $305,000 $320,249 $336,261 $250,882 $258,408 $266,160 $54,118 $61,841 $70,101
199 200307200 Habitat and Biodiversity Information System For Columbia River Basin NPO Northwest Habitat Institute Ongoing Mainstem/Systemwide Systemwide A principal habitat and biodiversity informational source for ecoprovinces and subbasins within the Columbia River Basin, within the region it is considered a "Key Informational Source", "Best Available Science", and as "Best Practices". Wildlife $997,107 $1,068,287 $1,030,199 $997,107 $1,068,287 $1,030,199 $ 0 $ 0 $ 0
729 200311400 Acoustic Tracking For Survival Private Kintama Research Ongoing Mainstem/Systemwide Systemwide A large-scale array is being constructed that will allow establishing ocean movements and survival of Columbia R salmon directly for the first time. This proposal describes the application of this technology to several key resource management issues. Anadromous $1,499,816 $1,499,816 $1,499,816 $1,499,816 $1,499,816 $1,499,816 $ 0 $ 0 $ 0
254 200400200 Pnamp Funding Federal US Geological Survey (USGS) - Cook Ongoing Mainstem/Systemwide Systemwide PNAMP requires a Coordinator to serve as lead staff, liaison, point of contact, and support efforts to coordinate state, federal, and tribal monitoring efforts in the region. This proposal requests funding for a portion of total cost of Coordination only. Anadromous $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $ 0 $ 0 $ 0
506 200500100 Ecology of Yearling and Subyearling Salmonids in Shallow Tidal Freshwater Habitats in the Vicinity of the Sandy River Delta in the Lower Columbia River Federal Pacific Northwest National Laboratory Ongoing Lower Columbia Columbia Lower This study addresses juvenile salmonid use of shallow water habitats (0-5 m) in Columbia R. tidal freshwater between Portland and Bonneville (RM 110-146). Anadromous $737,298 $705,440 $735,950 $737,298 $705,440 $735,950 $ 0 $ 0 $ 0
522 200500200 Operation of the Lower Granite Dam Adult Trap Federal Northwest Fisheries Science Center Ongoing Mainstem/Systemwide Systemwide Operation of the adult salmonid trap in the fish ladder at Lower Granite Dam. Anadromous $283,220 $291,717 $300,469 $283,220 $291,717 $300,469 $ 0 $ 0 $ 0
795 200600100 Mcintyre Dam Feasibility Study Tribe Colville Confederated Tribes Ongoing Columbia Cascade Okanogan Providing fish passage at McIntyre Dam will allow anadromous salmon access historic habitats and improve the conditions experienced by fish moving downstream through the dam. The irrigation flume will also be screened to prevent fish entrainment. Anadromous Expense - Planning costs less than $1M, Construction costs could be capitalized if greater than $1M $1,565,050 $428,385 $72,360 $1,565,050 $428,385 $72,360 $ 0 $ 0 $ 0
337 200600300 Desert Wildlife Area O&M (Wetland Enhancement) State Washington Department of Fish and Wildlife (WDFW) Ongoing Columbia Plateau Crab Completion of, and operation/maintenance for, six wetland enhancement construction projects initiated with BPA funding (MOA and FY06 contract) on the Desert Wildlife Area. Wildlife $320,138 $365,205 $222,705 $320,138 $365,205 $222,705 $ 0 $ 0 $ 0
319 200600400 Wenas Wildlife Area O&M State Washington Department of Fish and Wildlife (WDFW) Ongoing Columbia Plateau Yakima Provide and enhance riparian and shrub-steppe habitats for focal species as partial mitigation for the habitat losses associated with the construction and inundation of the Grand Coulee, McNary and John Day hydroelectric dams. Wildlife $482,857 $529,755 $533,300 $482,857 $529,755 $533,300 $ 0 $ 0 $ 0
462 200600500 Asotin Creek Wildlife Area O&M (Schlee Acquisitions) State Washington Department of Fish and Wildlife (WDFW) Ongoing Blue Mountain Asotin The Asotin Creek Wildlife Area (Schlee Acquisitions) provide habitat for salmonid species residing in George Ck and Asotin Creek as well as upland wildlife as mitigation for losses of wildlife habitat due to dams on the lower Snake and Columbia rivers. Wildlife $150,532 $106,147 $109,049 $150,532 $106,147 $109,049 $ 0 $ 0 $ 0
633 200600600 Habitat Evaluation Procedures (HEP) NPO Columbia Basin Fish & Wildlife Authority (CBFWA) Ongoing Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince This proposal is to conduct Habitat Evaluation Procedures (HEP)independently and/or with assistance from W/L managers on extant and new mitigation project lands and to provide technical oversight, review, and/or audit of current/past HEP data. Wildlife $341,828 $348,308 $364,036 $341,828 $348,308 $364,036 $ 0 $ 0 $ 0
357 200700100 Aquatic survey protocol comparison Federal US Forest Service - National Headquarters New Mainstem/Systemwide Systemwide This project seeks to evaluate the accuracy, precision, and comparability of aquatic protocols used by different management and research organizations within the Pacific Northwest. Anadromous $450,000 $450,000 $450,000 $450,000 $450,000 $450,000 $ 0 $ 0 $ 0
113 200700300 Dworshak Dam Resident Fish Mitigation State Idaho Department of Fish & Game New Mountain Snake Clearwater Improve resident fisheries as mitigation for losses and continuing impacts from construction and operation of Dworshak Dam by reducing entrainment, increasing kokanee size and abundance, and enhancing reservoir productivity. Resident $405,100 $1,300,600 $257,100 $405,100 $1,300,600 $257,100 $ 0 $ 0 $ 0
185 200700700 Determine Status and Limiting Factors of Pacific Lamprey in Fifteenmile Subbasin, Oregon Tribe Confederated Tribes of Warm Springs Reservation of Oregon New Columbia Gorge Fifteenmile Determine the status of Pacific lamprey including distribution, escapement and harvest.Identify limiting factors that may prevent optimal lamprey production in the Fifteenmile Subbasin. Anadromous $136,798 $122,850 $125,548 $136,798 $122,850 $125,548 $ 0 $ 0 $ 0
364 200700900 A Spatially Explicit & Web-accessible Database for Managing the Impacts of Expanding Colonial Waterbird Populations on Juvenile Salmonids (Oncorhynchus spp.) in the Columbia River Basin Federal Northwest Fisheries Science Center New Mainstem/Systemwide Systemwide We are proposing to develop a spatially explicit and web-accessible database (and spatial analysis tools) to facilitate access to juvenile salmonid (O. spp.) mortality data from avian predation based on PIT tag detections; Columbia River Basin Anadromous $102,930 $52,930 $29,273 $102,930 $52,930 $29,273 $ 0 $ 0 $ 0
137 200701300 Convert BPA Term Riparian Lease Agreements to Permanent Riparian Conservation Easements NPO John Day Basin Trust New Columbia Plateau John Day The John Day Basin Trust requests program operations funding and a "set aside" allocation of purchase funding to pursue the conversion of current and expired riparian lease agreements to permanent riparian conservation easements. Anadromous $433,690 $427,811 $433,145 $433,690 $427,811 $433,145 $ 0 $ 0 $ 0
138 200701400 Stock specific run timing and upstream migration mortality of adult Chinook and sockeye salmon and steelhead through PIT tagging and genetic analyses at Bonneville Dam. Tribe Columbia River Inter-Tribal Fish Commission (CRITFC) New Mainstem/Systemwide Systemwide Sockeye and chinook salmon and steelhead sampled at the Bonneville Dam Adult Fish Facility will be classified using genetics and PIT tagged to assess upstream timing and survival. Anadromous $318,986 $314,300 $334,609 $318,986 $314,300 $334,609 $ 0 $ 0 $ 0
142 200701700 Lower Columbia Slough Off-Channel and Floodplain Habitat Restoration Project - Phase Two NPO Columbia Slough Watershed Council New Lower Columbia Willamette The Project seeks to restore 5 acres of historic tidal floodplain wetland habitat in the Ramsey Wetland Complex while principally restoring hydrologic connectivity and ecological function in the lower Willamette River benefiting native fish and wildlife. Anadromous $97,000 $36,000 $20,000 $97,000 $36,000 $20,000 $ 0 $ 0 $ 0
420 200701800 Stock Assessment for salmon, steelhead, and other fish species in Lower Crab Creek, Washington State Washington Department of Fish and Wildlife (WDFW) New Columbia Plateau Crab The overall objectives of this project are to identify the origin and abundance of Lower Crab Creek salmonids; to identify the habitats they use in the stream, and to characterize changes in the environmental conditions they face. Anadromous $269,000 $259,000 $254,000 $269,000 $259,000 $254,000 $ 0 $ 0 $ 0
335 200702000 Manastash Instream Flow Enhancement SWCD Kittitas County Conservation District New Columbia Plateau Yakima This proposal seeks to enhance instream flow by working with water users to implement irrigation conveyance and onfarm water use efficiency projects, to trust water to the creek and investigate diversion timing to assist steelhead migration. Anadromous $529,950 $666,195 $496,750 $298,880 $344,030 $273,050 $231,070 $322,165 $223,700
454 200702200 Characterizing stress responses in lampreys: assessments based on cDNA microarrays Federal Columbia River Research Laboratory New Mainstem/Systemwide Systemwide This project will evaluate the efficacy of cDNA microarrays for documenting the molecular and physiological responses of lampreys to a variety of common environmental stressors Resident $191,116 $226,225 $225,658 $191,116 $226,225 $225,658 $ 0 $ 0 $ 0
162 200702300 Integrated Fruit Production in Fifteenmile and Hood River Subbasin Orchards NPO Wyeast Resource Conservation & Development Area Council New Columbia Gorge Hood A project to reduce the impact of Organophosphate pesticides from entering streams and rivers in Hood River County Oregon Anadromous $141,860 $141,860 $141,290 $141,860 $141,860 $141,290 $ 0 $ 0 $ 0
168 200702400 Coeur d'Alene Trout Ponds Tribe Coeur D'Alene Tribe New Intermountain Coeur d'Alene Tribal trout ponds provide alternative fishing opportunities for tribal harvest while reducing/eliminating adverse pressure on native stocks within targeted tributaries on the CDA Reservation in both the CD'A and Spokane subbasins. Resident $201,345 $236,007 $220,998 $201,345 $236,007 $220,998 $ 0 $ 0 $ 0
787 200702500 Project Compliance Monitoring Private XLSolutions New Mainstem/Systemwide Systemwide The project compliance monitoring determines whether specified project criteria are being met. All $459,790 $459,790 $403,883 $459,790 $459,790 $403,883 $ 0 $ 0 $ 0
367 200702600 Historic Changes in Organic Nutrient Sources and Productivity Proxies in the Columbia River Estuary in Relation to Juvenile Salmon Habitat Restoration Priorities Federal Pacific Northwest National Laboratory New Columbia Estuary Columbia Estuary We propose to establish the historical trends of organic nutrient sources and productivity proxies in existing sediment cores from the Columbia River Estuary to prioritize habitat restoration opportunities for salmon survival. Anadromous $100,177 $95,896 $103,205 $100,177 $95,896 $103,205 $ 0 $ 0 $ 0
807 200702700 Colville Confederated Tribes Acquisition Project Tribe Colville Confederated Tribes New Intermountain Columbia Upper This project will fulfill the obligation of the BPA to mitigate the remaining 11,223 HU's the CCT has left, by acquiring key habitats to be enrolled into the CCT Mitigation Project where they can be protected, enhanced and restored. Wildlife Capitalize land acquisition - medium certainty Land acquisition requirements $1,500,000 $1,500,000 $1,500,000 $1,500,000 $1,500,000 $1,500,000 $ 0 $ 0 $ 0
190 200702800 Pend Oreille River Basin Watershed Protection and Enhancement Project Tribe Kalispel Tribe New Intermountain Pend Oreille Identify and implement larger scale projects to improve local watershed conditions within the Pend Oreille Subbasin. Resident $336,890 $285,550 $292,265 $336,890 $285,550 $292,265 $ 0 $ 0 $ 0
192 200703000 Determination of steelhead smolt production and smoltification genes in the Yakima River Tribe Columbia River Inter-Tribal Fish Commission (CRITFC) New Columbia Plateau Yakima This study focuses on the use of neutral and quantitative genetic markers to evaluate population specific smolt production in the Yakima River and smoltification potential of resident rainbow trout to contribute to recovery of steelhead populations. Anadromous $172,950 $219,400 $201,720 $123,266 $169,979 $127,647 $49,684 $49,421 $74,073
208 200703100 Identifying prioritized action plans from subbasin strategies using a scenario-based decision support system Federal Northwest Fisheries Science Center New Lower Columbia Columbia Lower Improving, testing, and applying a transparent method for developing an efficient habitat action list using multiple models. The proposed project builds on a decision support system that has successfully been applied in the Lewis River basin. Anadromous $226,116 $296,840 $234,464 $226,116 $296,840 $234,464 $ 0 $ 0 $ 0
855 200703200 Potential effects of the invasive New Zealand mudsnail in tributaries of Bonneville Reservoir and the Deschutes River, (Potamopyrgus antipodarum). Federal US Geological Survey (USGS) - Cook New Columbia Gorge Columbia Gorge Evaluate the potential effects of the New Zealand mudsnail on important salmonid rearing habitats in the Columbia Gorge Subbasin Anadromous $27,500 $27,500 $25,000 $247,196 $317,221 $184,925 $-219,696 $-289,721 $-159,925
202 200703300 Monitor sub adult and adult bull trout passage through Lower Granite, Little Goose and Lower Monumental juvenile bypass facilities. Federal US Fish & Wildlife Service (USFWS) New Mainstem/Systemwide Systemwide Enumerate bull trout passage through Lower Snake River dams' juvenile bypass systems. Evaluate as a potential source of take through the incidental barging of migratory bull trout. Determine most likely origin of bull trout utilizing these facilities. Resident $141,912 $113,729 $120,090 $141,912 $113,729 $120,090 $ 0 $ 0 $ 0
222 200703400 Columbia Cascade Pump Screen Correction State Washington Department of Fish and Wildlife (WDFW) New Columbia Cascade Columbia Upper Middle This project proposes to start a voluntary compliance pump screen correction program in the Methow, Entiat, and Wenatchee River basins in order to reduce juvenile fish losses due to entrapment in water diversions as called for in the most recent FCRPS BiO Anadromous $316,666 $300,416 $309,428 $316,666 $300,416 $309,428 $ 0 $ 0 $ 0
227 200703500 UPA Project - Methow Basin Riparian Enhancement NPO Methow Salmon Recovery Foundation New Columbia Cascade Methow MSRF proposes to partner with Bureau of Reclamation and Methow Conservancy to identify and prioritize riparian enhancement projects that will add value to passage, access and conservation projects. All projects will focus on TES species and habitat. Anadromous $252,464 $197,243 $158,932 $252,464 $197,243 $158,932 $ 0 $ 0 $ 0
214 200703600 Mid-Columbia Trophic Dynamics Project State Washington Department of Fish and Wildlife (WDFW) New Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince Conduct a trophics dynamic project using conventional fish capture methods, bioenergetics modeling and stable isotope analysis as well as mobile hydroacoustics surveys to quantify the impacts of predators on salmonids within the Mid-Columbia Anadromous $633,000 $533,000 $533,000 $633,000 $533,000 $533,000 $ 0 $ 0 $ 0
215 200703700 North Fork Toutle River Fish Passage Private Steward and Associates New Lower Columbia Cowlitz The goal of the proposed project is to reconnect and maximize isolated salmonid habitat in the North Fork Toutle River watershed upstream of the Sediment Retention Structure (SRS). Anadromous $98,910 $89,670 $121,270 $98,910 $89,670 $121,270 $ 0 $ 0 $ 0
228 200703800 Preserving/Enhancing Bull Trout and Westslope Cutthroat Trout within the Upper Pend Oreille Basin. State Idaho Department of Fish & Game New Intermountain Pend Oreille This project will try to identify populations of bull trout and westslope cutthroat trout for restoration and conservation purposes. We will also try to identify the limiting factors associated with westslope cutthroat trout population declines. Resident $373,233 $356,401 $330,308 $373,233 $356,401 $330,308 $ 0 $ 0 $ 0
373 200704000 Upper Columbia Landowner Incentive Program State Washington Department of Fish and Wildlife (WDFW) New Intermountain Columbia Upper A new, competitive, incentive-based grant program, adiminstered by WDFW, will be developed to provide financial assistance to private landowners for implementation of priority objectives and strategies of the Upper Columbia Subbasin Plan. Resident $450,227 $450,227 $450,227 $450,227 $450,227 $450,227 $ 0 $ 0 $ 0
236 200704100 Kalispell Riparian Road Removal State Washington Department of Fish and Wildlife (WDFW) New Intermountain Pend Oreille This project will reduce sediment delivery to Kalispell Creek, a tributary to Priest Lake in the Pend Oreille Subbasin, by 200-400 tons per year. Sediment pollution has been identified as a key limiting factor for native salmonids in Kalispell Creek. Resident $73,117 $159,093 $20,781 $73,117 $159,093 $20,781 $ 0 $ 0 $ 0
374 200704200 UPA Wenatchee Passage Program NPO Chelan County Natural Resources Department New Columbia Cascade Wenatchee To replace 9 barrier culverts in Alder Creek, Clear Creek and Beaver Creek with fish-friendly structures to provide 4.0 miles of spawning and rearing habitat for ESA listed Upper Columbia steelhead. Anadromous $60,131 $501,187 $25,931 $60,131 $501,187 $25,931 $ 0 $ 0 $ 0
238 200704300 Lower Columbia Fish Enhancement Group Community-Based Multi-Sub-Basin Habitat Restoration Program NPO Lower Columbia Fish Enhancement Group New Lower Columbia None Selected The Lower Columbia Fish Enhancement Group seeks program-level support to continue community-based salmon and steelhead habitat restoration program and activities directly linked to implementation of Sub-Basin and Recovery Plan Priorities. Anadromous $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $ 0 $ 0 $ 0
239 200704400 Kettle River Tributaries Riparian Habitat Improvement Project SWCD Ferry Conservation District New Intermountain Columbia Upper Working in cooperation with the Colville National Forest, we will install off-stream water sources for livestock grazing on National Forest land in the northeast corner of Ferry County. This will improve water quality, and enhance upland game range. Resident $52,617 $32,817 $15,817 $52,617 $32,817 $15,817 $ 0 $ 0 $ 0
369 200704500 Beebe Property Upland, Riparian, and Wetland Enhancements State Washington Department of Fish and Wildlife (WDFW) New Columbia Cascade Columbia Upper Middle WDFW will initiate riparian, wetland, instream, and upland habitat restoration on the Beebe Springs property. This work will compliment Beebe Creek restoration and development of interpretive and educational projects currently underway. Anadromous $739,765 $120,432 $58,488 $739,765 $120,432 $58,488 $ 0 $ 0 $ 0
247 200704600 Steelhead Spawning Ground Surveys, Flow, and Temperature Monitoring of Small Tributaries of the Upper Middle Mainstem Columbia River. State Washington Department of Fish and Wildlife (WDFW) New Columbia Cascade Columbia Upper Middle Twelve small tributaries of the Columbia River, between Crab Creek and the Entiat River, will be surveyed to determine the abundance of steelhead redds, presence of adult steelhead, collect carcasses, and monitor flow and water temperature. Anadromous $60,350 $56,699 $57,776 $60,350 $56,699 $57,776 $ 0 $ 0 $ 0
248 200704700 Hydrography Spatial Data Enhancement Project - WDFW & WDNR Operational Data Updates and Integration to the PNW Hydrography Clearinghouse for the WA Columbia Basin State Interagency Committee (IAC) New Mainstem/Systemwide Systemwide Synchronize Washington States regulatory data improvements with the regions hydrography data. WDFW and WDNR, data additions and updates from their stream typing and fish habitat databases with be identified and assessed for inclusion. Anadromous $606,879 $477,786 $261,511 $606,879 $477,786 $261,511 $ 0 $ 0 $ 0
249 200704800 Transboundary Watershed Coordination in the Kootenai River Basin NPO Kootenai River Network, Inc. New Mountain Columbia Columbia Upper Fosters "grass-roots" public involvement and interagency cooperation for habitat restoration to offset deleterious impacts to the Kootenai River watershed fisheries by information transfer and public interface. Resident $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $ 0 $ 0 $ 0
456 200704900 Efficacy of carcass analogs for restoring the productivity of nutrient limited salmonid streams Federal Columbia River Research Laboratory New Columbia Gorge Wind This project will assess the influence of seasonal additions of salmon carcass analogs on various measures of stream productivity and nutrient flow through the aquatic community. Anadromous $442,707 $476,635 $501,996 $442,707 $476,635 $501,996 $ 0 $ 0 $ 0
261 200705100 Assessment of Interactions between Hatchery and Wild Summer Steelhead in the John Day River Subbasin Tribe Confederated Tribes of Warm Springs Reservation of Oregon New Columbia Plateau John Day The goal of this project is to collect data that will address the question of whether interactions between hatchery stray summer-steelhead have the potential to impact recovery of the wild population in the John Day River subbasin. Anadromous $265,615 $219,285 $223,802 $265,615 $219,285 $223,802 $ 0 $ 0 $ 0
262 200705200 Chum Salmon Evaluations Within Bonneville Reservoir State Washington Department of Fish and Wildlife (WDFW) New Columbia Gorge Columbia Gorge Evaluate and expand upon existing data for chum salmon movement patterns, habitat preferences, and population dynamics within Bonneville Reservoir with the intent to establish a viable spawning population of chum salmon. Anadromous $246,972 $259,320 $272,286 $197,721 $203,652 $209,762 $49,251 $55,668 $62,524
536 200705300 Upper Lolo Creek Watershed Restoration Federal US Forest Service: Lolo National Forest New Mountain Columbia Bitterroot Decommission roads in the Upper Lolo Creek Watershed for resident fish benefit. The primary objective is to reduce cumulative effects associated with roads and road-related management activities, in large part fine sediment generation and delivery. Resident $447,453 $184,553 $142,953 $447,453 $184,553 $142,953 $ 0 $ 0 $ 0
265 200705400 Entiat River - UPA - Stillwater Restoration Project SWCD Chelan County Conservation District (SWCD) New Columbia Cascade Entiat Enhance instream habitat complexity and reduce sediment delivery to salmonid spawing habitat from rapidly eroding streambank using LWD placement in 0.5 miles of the Stillwater Reach of the Middle Entiat AU. Riparian revegetation will occur along 0.1 mile Anadromous $267,544 $32,320 $9,459 $267,544 $32,320 $9,459 $ 0 $ 0 $ 0
267 200705500 Entiat River - UPA - Lower Entiat River Off-Channel Restoration Project SWCD Chelan County Conservation District (SWCD) New Columbia Cascade Entiat The Lower Entiat River Off-Channel enhancement project will provide 0.28 miles of off-channel habitat to benefit Upper Columbia ESA listed steelhead, spring Chinook, and bull trout. An irrigation channel will be enhanced for rearing and spawning habitat. Anadromous $54,580 $5,388 $ 0 $54,580 $5,388 $ 0 $ 0 $ 0 $ 0
828 200705600 IDL Pend Oreille Area Fish Passage #2 State Idaho Department of Lands New Intermountain Pend Oreille This project will replace two culverts in County roads associated with IDL lands that are fish passage barriers. Implementation of this project will increase the available habitat for bull trout. This project will be cooperative with Bonner County, ID. Resident $ 0 $250,000 $100,000 $ 0 $250,000 $100,000 $ 0 $ 0 $ 0
272 200705700 Potlatch River Basin Conservation Easement Private Potlatch Corporation New Mountain Snake Clearwater This proposal is for the sale of a conservation easement covering riparian areas in the Potlatch River basin owned by Potlatch Corporation. Anadromous Expense -No anadromous fish crediting to meet requirements $4,008,000 $ 0 $ 0 $4,008,000 $ 0 $ 0 $ 0 $ 0 $ 0
276 200705900 Determining the Effects of Predation on Reintroduced Anadromous Salmonids in Cle Elum Lake, Washington State Washington Department of Fish and Wildlife (WDFW) New Columbia Plateau Yakima The goal of this proposal is to maximize salmon smolt production from Cle Elum Lake by 1) assessing predation effects on reintroduced salmon smolts, and 2) recommending management actions that will reduce production bottlenecks, if they occur. Anadromous $373,544 $367,132 $364,075 $280,974 $291,721 $305,218 $92,570 $75,411 $58,857
281 200706000 Lake Pend Oreille Invasive Fish State Idaho Department of Fish & Game New Intermountain Pend Oreille Overall Project Goal: To insure that the recovery of native species (bull trout and westslope cutthroat trout) and sport-fish (kokanee) in Lake Pend Oreille is not jeopardized by the recent establishment of smallmouth bass and walleyes. Resident $182,400 $190,529 $199,035 $144,000 $144,000 $ 0 $38,400 $46,529 $199,035
282 200706100 Deschutes Sub-basin Riparian Restoration through USDA Conservation Reserve Enhancement Program (CREP) NPO Wyeast Resource Conservation & Development Area Council New Columbia Plateau Deschutes Develop riparian buffer systems on streams using the Conservation Reserve Enhancement Program (CREP) to restore and enhance riparian areas in the Trout Creek Watershed and other high priority stream reaches identified in the Deschutes Sub-basin Plan Anadromous $103,557 $99,257 $99,257 $103,557 $99,257 $99,257 $ 0 $ 0 $ 0
285 200706300 Use of drift nets to monitor production and limiting factors in recruitment of larval Pacific lamprey Edu Oregon State University New Mainstem/Systemwide Systemwide The primary purpose of this proposal is to assess a larval drift protocol for general application throughout the CRB, describe local spawning stock - larval recruitment relationships, and quantify factors limiting early recruitment of Pacific lamprey. Anadromous $122,284 $124,379 $126,713 $122,284 $124,379 $126,713 $ 0 $ 0 $ 0
289 200706400 Protect and Restore Slate Creek Tribe Nez Perce Tribe Dept. Fisheries Resource Management Watershed Division New Mountain Snake Salmon Restore and protect the Slate Creek Watershed for the benefit of both resident and anadromous fish using an overall watershed approach. Restoration and protection efforts will be done cooperatively with the Nez Perce National Forest. Anadromous $223,768 $330,044 $399,440 $223,768 $330,044 $399,440 $ 0 $ 0 $ 0
294 200706500 Coordinate and implement tributary habitat restoration in the Little Salmon River and lower Salmon River Idaho SWCD Idaho Soil and Water Conservation District New Mountain Snake Salmon Implement fish habitat restoration on private lands dominated by agricultural practices using cost sharing by Bonneville, Idaho Pacific Coast Salmon Recovery Funds, Idaho Water Quality Program for Agriculture, and landowner participation. Requests pending Anadromous $409,363 $407,362 $423,362 $409,363 $407,362 $423,362 $ 0 $ 0 $ 0
296 200706700 Lawyer Creek Idaho A-Run Steelhead Spawning and Rearing Restoration and Enhancement SWCD Lewis Soil Conservation District New Mountain Snake Clearwater Implement habitat restoration on private lands dominated by agriculture with funding from Bonneville, Idaho Pacific Coast Salmon Recoveyr Funds, Idaho Water Quality Program for Agriculture, and land owner particiation. Funding from all sources pending Anadromous $220,692 $220,692 $220,692 $220,692 $220,692 $220,692 $ 0 $ 0 $ 0
684 200706900 Determine status of migratory bull trout in the South Fork Payette River. State Idaho Department of Fish & Game New Middle Snake Payette The project is designed to evaluate population status migratory populations of bull trout in the South Fork Payette River. Resident $137,197 $108,061 $107,955 $137,197 $108,061 $107,955 $ 0 $ 0 $ 0
301 200707000 Fish Passage Facility Final Design and Construction - Clear Lake Dam (NF Tieton R.). State Washington Department of Fish and Wildlife (WDFW) New Columbia Plateau Yakima Complete value engenering study, final design, acquire environmental permits and construct a fish ladder and temperature control curtain at Clear Lake Dam; restore habitat diversity, productivity, and extend the range of bull trout. Cost share with USBR Resident Capitalize construction - low certainty (FS/BPA MOU) FCRPS responsibility $ 0 $ 0 $1,930,000 $ 0 $ 0 $1,930,000 $ 0 $ 0 $ 0
308 200707200 Flathead Subbasin Flowering Rush and Yellowflag Iris Project Edu Salish Kootenai College/University of Montana New Mountain Columbia Flathead This research, demonstration, and education project on the environmenal impacts of flowering rush and yellowflag iris on wetland and aquatic habitats will help determine the biological potential and identify the future impact and test control measures. Resident $332,640 $291,358 $291,360 $332,640 $291,358 $291,360 $ 0 $ 0 $ 0
313 200707300 Dynamics of Gravel Spawning Beds in Lake Pend Oreille, ID Edu Woods Hole Oceanographic Institution New Intermountain Pend Oreille Observations and modeling of the effects of waves and currents on sediments in kokanee spawing habitat in Lake Pend Oreille, ID. The long-term goal is to provide tools to manage lake levels & shoreline sediments to optimize habitat for bull trout forage. Resident $235,068 $361,079 $290,357 $235,068 $361,079 $290,357 $ 0 $ 0 $ 0
347 200707700 Hemlock Dam Removal Federal Gifford Pinchot National Forest New Columbia Gorge Wind This project will remove a 26-ft high dam on Trout Creek, a tributary to the Wind River. Trout Creek provides spawning and rearing habitat for LCR steelhead. The project will restore unimpeded fish passage and improve water quality and habitat. Anadromous $345,000 $2,351,000 $56,000 $345,000 $2,351,000 $56,000 $ 0 $ 0 $ 0
348 200707800 Characterizing the Geographic Distribution of Freshwater Mussels in the Columbia Basin Using Museum Collection Data. State Washington Department of Fish and Wildlife (WDFW) New Mainstem/Systemwide Systemwide All available collection records will be examined for accuracy, species identifications will be checked, and location and date of collection will be recorded. Species occurrence data will be plotted in a GIS and made available online. Resident $30,500 $8,200 $ 0 $30,500 $8,200 $ 0 $ 0 $ 0 $ 0
349 200707900 Salmon & Steelhead Habitat Restoration and Protection in the Yakima Basin NPO Mid-Columbia Fisheries Enhancement Group New Columbia Plateau Yakima Implement a non-regulatory, basin-wide effort to involve landowners in restoration and protection projects in priority areas identified in Yakima Subbasin Plan. Work includes riparian planting, fencing, fish passage, and instream habitat improvements. Anadromous $78,000 $184,400 $185,100 $78,000 $184,400 $185,100 $ 0 $ 0 $ 0
352 200708100 WRIA-Based Restoration Project Feasibility Assessment and Prioritization, Coweeman River NPO Lower Columbia Fish Enhancement Group New Lower Columbia Cowlitz Conduct geomorphic and engineering assessment of Tier 1 & 2 reaches in Coweeman basin to identify/develop site-specific restoration projects to address limiting factors. Projects will be ranked, prioritized, and concept designs will be prepared. Anadromous $161,000 $14,000 $ 0 $151,000 $14,000 $ 0 $10,000 $ 0 $ 0
360 200708300 Grande Ronde Cooperative Salmonid Monitoring and Evaluation Project Tribe Confederated Tribes of the Umatilla Indian Reservation New Blue Mountain Grande Ronde This is a continuation of an ongoing O&M/RM&E program. It has been seperated from its O&M component for this solicitation.Monitor status and detect changes in salmonid abundance, productivity, diversity, and spatial structure in the Grande Ronde Subbasin Anadromous $455,000 $477,750 $501,642 $455,000 $477,750 $501,642 $ 0 $ 0 $ 0
362 200708400 Shrubsteppe Habitat Acquisition for Terrestrial Species in Need of Conservation in the Upper Mid-Columbia Subbasin. State Washington Department of Fish and Wildlife (WDFW) New Columbia Cascade Columbia Upper Middle To acquire key land parcels that improve or maintain the conservation values, or ecological connectivity, of existing land owned by Washington Department of Fish and Wildlife. Shrubsteppe dependant pygmy rabbit, sharptail, and sage grouse are the focus. Wildlife Capitalize land acquisition - medium certainty Land acquisition requirements $44,400 $1,776,700 $42,400 $44,400 $1,776,700 $42,400 $ 0 $ 0 $ 0
375 200708500 UPA Nason Creek Oxbow Reconnection Project NPO Chelan County Natural Resources Department New Columbia Cascade Wenatchee Project proposes to install two bottomless arch culverts in SR 207 to successfully reconnect 0.64 miles of historic oxbow habitat to the mainchannel Nason Creek. This project will increase Spring Chinook salmonid abundance by 25-50% in the Nason A.U. Anadromous Expense - not construction $1,212,692 $10,000 $ 0 $1,212,692 $10,000 $ 0 $ 0 $ 0 $ 0
376 200708600 UPA Wenatchee Subbasin Riparian Enhancement Proposal NPO Chelan County Natural Resources Department New Columbia Cascade Wenatchee The Wenatchee Riparian proposal will involve planting native vegetation and fencing to establish a properly functioning riparian buffer in the Wenatchee Assessment Units. This project will benefit Upper Columbia steelhead, spring Chinook and bull trout. Anadromous $99,898 $96,648 $96,646 $99,898 $96,648 $96,646 $ 0 $ 0 $ 0
385 200708900 Monitoring Invasive Species in the mainstem Columbia River: the development of a design to monitor the status and trends and provide for the early detection of invasive species Federal US Geological Survey (USGS) - Cook New Mainstem/Systemwide Systemwide We propose to formulate a survey design to monitor the status and trends and to provide for the early detection of invasive species in the mainstem Columbia River. Anadromous $350,902 $403,695 $221,763 $350,902 $403,695 $221,763 $ 0 $ 0 $ 0
386 200709000 Effects of the marine environment on the growth and survival of Columbia Basin spring Chinook and sockeye salmon stocks. Tribe Columbia River Inter-Tribal Fish Commission (CRITFC) New Mainstem/Systemwide Systemwide This project will examine the role of marine growth, as measured by scale imcrement data, in controlling the survival of Columbia Basin spring chinook and sockeye salmon. Anadromous $70,319 $58,694 $9,124 $70,319 $58,694 $9,124 $ 0 $ 0 $ 0
388 200709100 The evaluation of limiting factors on resident and anadromous salmonids in Lake Wenatchee, Washington State Washington Department of Fish and Wildlife (WDFW) New Columbia Cascade Wenatchee This project will evaluate predation, water quality and the available prey base on bull trout, spring chinook salmon and sockeye salmon survival in Lake Wenatchee. Bioenergetics modeling will quantify consumption rates of piscivores to determine impacts. Anadromous $489,210 $433,814 $447,380 $489,210 $433,814 $447,380 $ 0 $ 0 $ 0
392 200709200 Restore Selway River Watershed Tribe Nez Perce Tribe DFRM Watershed Division New Mountain Snake Clearwater Protect, restore, and enhance the Selway River Watershed to provide quality habitat for anadromous and resident fish. This will be accomplished by resotration projects such as culvert replacement, noxious weed removal, and streambank stabilization. Anadromous $306,650 $317,511 $318,092 $306,650 $317,511 $318,092 $ 0 $ 0 $ 0
393 200709300 Restore Middle Fork Clearwater Face Drainages Tribe Nez Perce Tribe DFRM Watershed Division New Mountain Snake Clearwater Restore Middle Fork drainages to provide quality habitat for anadromous and resident fish. This will be accomplished by watershed resotration projects such as culvert replacement, road inventory and road obliteration. Resident $308,484 $379,436 $372,786 $308,484 $379,436 $372,786 $ 0 $ 0 $ 0
394 200709400 Protect & Restore Clear Creek Watershed Tribe Nez Perce Tribe DFRM Watershed Division New Mountain Snake Clearwater Restore Clear Creek drainage to provide quality habitat for anadromous and resident fish. This will be accomplished by watershed resotration projects such as culvert replacement, road inventory and road obliteration. Anadromous $284,000 $405,276 $411,834 $284,000 $405,276 $411,834 $ 0 $ 0 $ 0
403 200709600 Wildlife Inventory and Habitat Evaluation of Duck Valley Indian Reservation Tribe Shoshone Paiute Tribes New Middle Snake Owyhee The purposes of this project are threefold: (1) to gather information on wildlife species composition, distribution and relative abundance on the DVIR; (2) to assess the condition of existing habitat; and (3) to enable informed land management decisions. Wildlife $159,480 $162,666 $142,228 $159,480 $162,666 $142,228 $ 0 $ 0 $ 0
404 200709700 Restoring connectivity to a floodplain wetland on Multnomah Channel NPO Ducks Unlimited, Inc. New Lower Columbia Willamette A creek will be realigned into its historic channel to maintain water in a wetland and run a fish ladder. A fish ladder will be installed adjacent to an existing water-control structure to increase connectivity between Multnomah Channel and the floodplain Anadromous $30,000 $160,000 $5,000 $30,000 $160,000 $5,000 $ 0 $ 0 $ 0
406 200709900 Gold Creek (Lakeview District) Bull Trout Habitat and Migration Protection State Idaho Department of Environmental Quality New Intermountain Pend Oreille Gold Creek is critically important bull trout spawning stream in the fragmented Pend Orielle Lake watershed. Migration and spawning habitat is threatened by a massive sediment source. The project would remove this threat and enhance water quality. Resident $599,826 $ 0 $ 0 $599,826 $ 0 $ 0 $ 0 $ 0 $ 0
412 200710200 Subbasin Scale Monitoring and Plan Implementation Monitoring for the Yakima Subbasin Plan NPO Yakima Subbasin Fish and Wildlife Planning Board New Columbia Plateau Yakima Provide the Planning Board, with tools to contribute to the NPCCs Fish and Wildlife Program, the Project Proposal /Review Process, meet the goals of the Power Act, the and move toward normative conditions in the Yakima Subbasin. Anadromous $288,500 $146,500 $130,000 $288,500 $146,500 $130,000 $ 0 $ 0 $ 0
414 200710300 Skookumchuck Watershed State Washington Department of Fish and Wildlife (WDFW) New Columbia Cascade Columbia Upper Middle DRAFT: The Skookumchuck Watershed project is a multi-phased effort to protect a right bank tribuatry of the Columbia River that supports threatened steelhead. Anadromous $700,000 $30,198 $31,426 $700,000 $30,198 $31,426 $ 0 $ 0 $ 0
416 200710400 Protect and Restore White Bird Creek Tribe Nez Perce Tribe Dept. Fisheries Resource Management Watershed Division New Mountain Snake Salmon Restore and protect the White Bird Watershed for the benefit of both resident and anadromous fish using an overall watershed approach. Restoration and protection efforts will be done cooperatively with the Nez Perce National Forest. Anadromous $246,804 $215,897 $285,294 $246,804 $215,897 $285,294 $ 0 $ 0 $ 0
417 200710500 Protecting & Restoring the Wallowa River Watershed Tribe Nez Perce Tribe New Blue Mountain Grande Ronde This project seeks to continue protecting existing high quality habitat. It further seeks to restore and enhance habitat where feasible and opportunity exists. Another component of this proposal is education and outreach. Anadromous $881,762 $897,291 $926,487 $881,762 $897,291 $926,487 $ 0 $ 0 $ 0
418 200710600 Spokane Tribe Fish and Wildlife Planning and Coordination Tribe Spokane Tribe New Mainstem/Systemwide Systemwide To ensure adequate Spokane Tribal representation at regional meetings. This project would secure funding for Spokane Tribal Fish and Wildlife Managers to attend regional and provincial meeting to assist in development of work plans within Columbia River All $93,100 $93,100 $93,100 $93,100 $93,100 $93,100 $ 0 $ 0 $ 0
421 200710700 What was old is new again: evaluate the pound net and beach seine as innovative live capture selective harvest gears State Washington Department of Fish and Wildlife (WDFW) New Mainstem/Systemwide Systemwide We will evaluate the pound net and beach seine as live capture, selective harvest gears. These gears are expected to increase bycatch survival while providing innovative methods for harvestable hatchery fish. Anadromous $365,514 $405,459 $406,792 $365,514 $405,459 $406,792 $ 0 $ 0 $ 0
422 200710800 Regional Coordination for Upper Columbia United Tribes Tribe Upper Columbia United Tribes New Mainstem/Systemwide Systemwide Facilitate and coordinate five UCUT member Tribes' participation in regional activities involving implementation of the FWP, annual project and funding recommendations, rolling provincial review, subbasin planning, program amendment recommendations, etc. All $69,594 $73,346 $80,053 $69,594 $73,346 $80,053 $ 0 $ 0 $ 0
584 200710900 Aquatic Nuisance Species monitoring and outreach program for the Mountain Columbia province (Montana portion) of the Columbia River Basin State Montana Department of Fish, Wildlife and Parks New Mountain Columbia None Selected Establishment of an Aquatic Nuisance Species (ANS) monitoring program, identify potential ANS vectors and continue and expand ANS public awareness efforts within the Mountain Columbia province. Resident $51,739 $43,473 $43,473 $51,739 $43,473 $43,473 $ 0 $ 0 $ 0
685 200711000 Differences in Functional Genes Between Hatchery and Wild Chinook Salmon Edu University of Idaho - Aquaculture Research Institute New Mainstem/Systemwide Systemwide This project will examine functional genetic differences between hatchery and wild Chinook salmon with the goal of identifying and reducing negative hatchery effects through modified hatchery practices. Anadromous $472,018 $611,167 $506,241 $472,018 $611,167 $506,241 $ 0 $ 0 $ 0
425 200711100 Assess impacts of flow augmentation on bull trout in the North Fork and Lower Clearwater Rivers State Idaho Department of Fish & Game New Mountain Snake Clearwater Determine the downriver effects of cold water releases from Dworshak Dam on bull trout populations inhabiting the North Fork Clearwater River tailrace and lower mainstem Clearwater River. Resident $188,269 $186,264 $185,210 $188,269 $186,264 $185,210 $ 0 $ 0 $ 0
426 200711200 Teanaway Watershed - Protect critical habitat from development, reduce water temperatures and increase instream flows, restore habitat forming processes in the floodplain. NPO Kittitas Conservation Trust New Columbia Plateau Yakima Teanaway watershed supports viable salmonid populations with complex spatial structure and diversity. Maximizing abundance and productivity of focal species requires protecting critical habitat, augmenting instream flows, & restoring floodplain functions Anadromous $828,000 $724,000 $492,000 $828,000 $724,000 $492,000 $ 0 $ 0 $ 0
430 200711300 Cowiche Restoration and Protection Project (Easement/Fee Simple Acquisition) State Washington Department of Fish and Wildlife (WDFW) New Columbia Plateau Yakima The goal of this project is to protect stream and riparian habitat, and floodplain functions along the Cowiche Creek. The project will acquire conservation easements protecting more than five miles of critical, high quality, steelhead and coho habitat. Anadromous $300,000 $ 0 $ 0 $300,000 $ 0 $ 0 $ 0 $ 0 $ 0
431 200711400 Vulcan Mountain Weed Control for Mule Deer and Bighorn Sheep Habitat Improvement State Washington Department of Fish and Wildlife (WDFW) New Intermountain Columbia Upper This project will eliminate invasive noxious weeds, including hoary alyssum, spotted and diffuse knapweed, and musk thistle, from 1,500 acres of privately-owned mule deer winter and spring range and bighorn sheep habitat in the Upper Columbia Subbasin. Wildlife $35,465 $33,713 $33,713 $35,465 $33,713 $33,713 $ 0 $ 0 $ 0
433 200711600 Lostine River Watershed Restoration Tribe Nez Perce Tribe New Blue Mountain Grande Ronde This project seeks to continue protecting existing high quality habitat. It further seeks to restore and enhance habitat where feasible and opportunity exists. Another component of this proposal is education and outreach. Anadromous $1,077,679 $1,102,253 $1,132,926 $1,077,679 $1,102,253 $1,132,926 $ 0 $ 0 $ 0
435 200711700 Comprehensive Assessment of Coho Salmon Restoration Efforts in the Mid-Columbia and Mid-Snake River Basins Tribe Columbia River Inter-Tribal Fish Commission (CRITFC) New Mainstem/Systemwide Systemwide This project will coordinate exchange of data among managers tribal programs to reintroduce extirpated coho salmon, and comprehensive assessment of methodologies and results to address uncertainites relative to the feasibity of reintroduction/restoration. Anadromous $59,421 $65,898 $71,683 $59,421 $65,898 $71,683 $ 0 $ 0 $ 0
436 200711800 Protect and Restore Anadromous Fish Habitat in Little Naches River Watershed. Federal US Forest Service (USFS) - Wenatchee National Forest New Columbia Plateau Yakima Purchase 2560 acres of Plum Creek Timber Co. holdings in the Little Naches drainage to protect key spawning reaches of steelhead and salmon under federal management. Restore riparian habitat in Little Naches watershed Anadromous $30,000 $130,000 $5,155,000 $30,000 $130,000 $5,155,000 $ 0 $ 0 $ 0
437 200711900 Restore Access to Upper Musselshell Creek Tribe Nez Perce Tribe DFRM Watershed Division New Mountain Snake Clearwater Enhance the upper Musselshell Creek Watershed to restore access and provide quality habitat for all aquatic species by reversing past mining activities that have diverted a portion of Musselshell Creek creating a passage barrier. Anadromous $125,998 $132,972 $124,617 $125,998 $132,972 $124,617 $ 0 $ 0 $ 0
438 200712000 Malheur Subbasin Habitat Restoration and Fish Enhancement  Logan Valley Project Tribe Burns Paiute Tribe New Middle Snake Malheur This project proposes the acquisition of up to 1120 acres of deeded land in the headwaters of the Malheur River to restore and protect native species habitat and provide an opportunity of the development of interim fishery for the tribe. Resident $2,029,209 $91,206 $246,181 $2,029,209 $91,206 $104,000 $ 0 $ 0 $142,181
443 200712200 White Salmon River watershed assessment above and below Condit Dam before anadromous fish reintroduction. Federal Columbia River Research Laboratory New Columbia Gorge Big White Salmon Assessment fish population structure and habitat conditons above and below Condit Dam prior to the re-introduction of anadromous salmonids. Anadromous $341,115 $305,689 $323,804 $341,115 $305,689 $323,804 $ 0 $ 0 $ 0
445 200712400 Okanogan County Irrigation Water Management Improvement Project SWCD Okanogan Soil & Water Conservation District (SWCD) New Columbia Cascade Methow To provide money and technical assistance to local landowners for irrigation system improvements in the interest of improving water quality and quantity throughout Okanogan County for fish habitat. Anadromous $281,209 $373,909 $372,659 $281,209 $373,909 $372,659 $ 0 $ 0 $ 0
452 200712500 Protect and Restore the Tucannon River Watershed - Nez Perce Tribe Tribe DFRM Watershed Division New Columbia Plateau Tucannon A cooperative project to reduce sediment, protect and restore critical riparian/stream habitat and increase fish survivability in the Tucannon Subbasin thru road decommissioning streambank stabilization and native plant restoration. Anadromous $174,527 $204,106 $216,106 $174,527 $204,106 $216,106 $ 0 $ 0 $ 0
447 200712600 Protect and Restore the Lower Snake Tributary and Pataha Streams/Watersheds - Nez Perce Tribe Tribe Nez Perce Tribe DFRM Watershed Division New Columbia Plateau Snake Lower Fill critical data gap in the Lower Snake Subbasin tributary streams as well as the Pataha Creek drainage within the Tucannaon River Subbasin through inventory, assessment, prioritization of fish passage barriers for removal, rennovation or replacement . Anadromous $217,823 $215,022 $180,102 $217,823 $215,022 $180,102 $ 0 $ 0 $ 0
448 200712700 Reestablish Connectivity and Restore Fish Habitat in the East Fork of the South Fork Salmon River Watershed Tribe Nez Perce Tribe DFRM Watershed Division New Mountain Snake Salmon This project will reestablish fish passage through a 30-foot tall cascade using natural channel design and rehabilitate one mile of fish habitat through an anthropogenically degraded reach of the upper mainstem East Fork of the South Fork Salmon River. Anadromous $325,000 $489,200 $332,800 $325,000 $489,200 $332,800 $ 0 $ 0 $ 0
449 200712800 Protect and Restore the Little Salmon Watershed Tribe Nez Perce Tribe DFRM Watershed Division New Mountain Snake Salmon This project entails conducting road/stream crossing surveys and analysis, implementing fish barrier remediation, and riparian protection/restoration in the Little Salmon watershed. Interagency coordination and watershed planning will also be targeted. Anadromous $327,000 $318,600 $365,600 $327,000 $318,600 $365,600 $ 0 $ 0 $ 0
458 200713100 Screening diversions for conservation of fish populations in the Columbia River Basin: entrainment losses, prioritization, and the efficacy of alternative technology designs Federal Columbia River Research Laboratory New Mainstem/Systemwide Systemwide This project will estimate entrainment of fishes in unscreened diversions in the CRB to help set priorities for screening. We will also conduct hydraulic and biological evaluations of alternative technology fish screens in the field. Anadromous $407,735 $375,200 $338,824 $407,735 $375,200 $338,824 $ 0 $ 0 $ 0
460 200713200 NEOH Monitoring & Evaluation Implementation (Formerly a component of 198805301) Multiple Tribe: Nez Perce Tribe, State: Oregon Department of Fish and Wildlife New Blue Mountain Grande Ronde Implement the ISRP-reviewed NEOH M&E Plan. It will guide evaluation of the NEOH production program, give empirical evidence of effects and fill knowledge gaps regarding supplementation and its uncertainty as an enhancement tool. Anadromous $1,806,428 $1,770,842 $1,892,140 $1,806,428 $1,770,842 $1,892,140 $ 0 $ 0 $ 0
461 200713300 Systemwide distribution of genetic variation within and among populations of the white sturgeon (Acipenser transmontanus) Edu University of California at Davis New Mainstem/Systemwide Systemwide We will analyze microsatellite genetic variation within and among white sturgeon populations throughout their range to assess both the interrelationships of populations to one another and the genetic health of the populations within the Columbia basin. Resident $303,737 $247,741 $245,704 $303,737 $247,741 $245,704 $ 0 $ 0 $ 0
471 200713400 Restore and Protect Crooked River Watershed Tribe Nez Perce Tribe New Mountain Snake Clearwater Protect and restore the Crooked River Watershed for the benefit of both anadromous and resident fish using an overall watershed health approach. This project is a cooperative effort between the Nez Perce Tribe and Nez Perce National Forest. Anadromous $525,397 $453,405 $300,813 $525,397 $453,405 $300,813 $ 0 $ 0 $ 0
473 200713500 Lower Columbia Salmon Recovery Planning: Habitat Restoration Project List Development and Modeling State Washington Department of Fish and Wildlife (WDFW) New Lower Columbia None Selected Develop a prioritized habitat recovery project list for chinook, coho, chum, and steelhead in all Lower Columbia sub-basins. Estimate whether these actions will result in populations reaching recovery targets. Anadromous $323,994 $289,031 $309,730 $323,994 $289,031 $309,730 $ 0 $ 0 $ 0
474 200713600 Beavers as stream restorationists? Determining Systemwide status and trends in beaver impoundments in tributary streams, and the relationships between beaver impoundment and salmonids. Edu University of Idaho New Mainstem/Systemwide Systemwide Beaver dams have strong effects on stream processes, fish, and wildlife. We will use GIS to estimate status and trends in beaver ponds, and GIS and existing fisheries data to test hypotheses about how ponds affect salmonids at watershed scales. Wildlife $106,695 $105,890 $85,889 $106,695 $105,890 $85,889 $ 0 $ 0 $ 0
475 200713700 Open Channels NPO Friends of the Teton River New Upper Snake Snake Headwaters Open Channels has 3 elements: 1 Removing fish barriers to improve connectivity of tributary headwaters to the River 2 Improving flow conditions in tributaries during critical YCT reproduction 3 Stream bank restoration, improved habitat & less sedimentatn Resident $150,000 $150,000 $ 0 $150,000 $150,000 $ 0 $ 0 $ 0 $ 0
478 200713900 Rock Creek Stabilization and Habitat Rehabilitation State Skamania County New Columbia Gorge Columbia Gorge Rehabilitation of riparian area and habitat for the lower 5300 feet of Rock Creek, Stevenson, Skamania Co., WA Anadromous $143,814 $489,330 $190,868 $143,814 $489,330 $190,868 $ 0 $ 0 $ 0
747 200714100 Bull Trout Effective Population Size in Isolated Populations Federal Columbia River Fisheries Program Office New Blue Mountain Imnaha Estimate population abundance, effective population size and within/among population genetic variability in isolated populations to provide emperical data toward defining minimum viable population size and restoration and recovery of bull trout. Resident $302,000 $238,000 $253,000 $302,000 $238,000 $253,000 $ 0 $ 0 $ 0
488 200714200 Restore and Protect American River Watershed Tribe Nez Perce Tribe New Mountain Snake Clearwater Restore and protect the American River Watershed for the benefit of both anadromous and resident fish using an overall watershed approach. This project is a cooperative effort between the Nez Perce Tribe, Nez Perce National Forest, and BLM. Anadromous $335,008 $348,016 $341,424 $335,008 $348,016 $341,424 $ 0 $ 0 $ 0
497 200714400 Evaluation of water temperature exposure in the Columbia River hydrosystem on reproductive success of adult and juvenile Chinook salmon and steelhead Edu University of Idaho New Mainstem/Systemwide Systemwide This proposal outlines a comprehensive evaluation of the relationship(s) between warm water exposures to juvenile and adult anadromous salmonids as they migrate up- and downstream through the FCRPS and reproductive potential Anadromous $132,630 $136,825 $141,161 $132,630 $136,825 $141,161 $ 0 $ 0 $ 0
498 200714500 Okanogan Livestock and Water SWCD Okanogan Soil & Water Conservation District (SWCD) New Columbia Cascade Okanogan Provide a cost share program to assist producers in developing offsite water for livestock and provide assistanc fencing riparian areas. Allowing producers to respond to and prevent complaints Anadromous $63,820 $54,520 $34,520 $63,820 $54,520 $34,520 $ 0 $ 0 $ 0
499 200714600 Bull Trout Population Status Monitoring in the Snake River Basin of Southeast Washington State Washington Department of Fish and Wildlife (WDFW) New Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince Monitor bull trout distribution and relative abundance using summer sampling and fall spawning surveys. Collect tissues and genetically characterize the populations and metapopulation structure in southeast Washington Resident $129,372 $129,991 $125,590 $129,372 $129,991 $125,590 $ 0 $ 0 $ 0
501 200714700 Willamette Flow Management Project NPO Nature Conservancy New Lower Columbia Willamette The Willamette Flow Management project will identify environmental flow requirements for the Willamette River and its tributaries and design and test alternative flow releases from Corps and EWEB dams to achieve more natural flow regimes. Anadromous $141,200 $121,375 $147,250 $141,200 $121,375 $147,250 $ 0 $ 0 $ 0
504 200714800 Monitoring and Models for Restoration and Adaptive Management of White Sturgeon in the Columbia River Basin Federal US Geological Survey (USGS) - Cook New Mainstem/Systemwide Systemwide A metapopulation model for white sturgeon will help managers to evaluate restoration strategies (e.g., harvest regulation, translocation, stocking) for this species, and indicate how monitoring data might best be used to provide feedback. Resident $153,282 $281,257 $264,040 $153,282 $281,257 $264,040 $ 0 $ 0 $ 0
507 200714900 Pend Oreille Nonnative Fish Suppression Project Tribe Kalispel Tribe New Intermountain Pend Oreille The focus of this project is to recover native salmonids in the Pend Oreille River watershed. Primary recovery actions are nonnative fish removal and reinvasion prevention. Resident $596,785 $405,591 $400,959 $596,785 $405,591 $400,959 $ 0 $ 0 $ 0
508 200715000 Expand Salmonid Monitoring in Grays River to Meet Monitoring Needs Identified in the Lower Columbia Salmon Recovery and Subbasin Plan and maintain an at risk Chum Salmon Pop. through Supplementation. State Washington Department of Fish and Wildlife (WDFW) New Columbia Estuary Grays Supplementation of chum salmon through artificial propagation and associated monitoring. Anadromous $305,800 $191,100 $200,400 $305,800 $191,100 $200,400 $ 0 $ 0 $ 0
509 200715100 Nutrient Enhancement Business Plan NPO Lower Columbia Fish Enhancement Group New Mainstem/Systemwide Systemwide This proposal seeks funding to develop a business plan that describes how a model nutrient enhancement program would be established to utilize hatchery carcasses to create the carcass analogs necessary for large scale nutrient enhancement. Anadromous $100,000 $50,000 $ 0 $100,000 $50,000 $ 0 $ 0 $ 0 $ 0
510 200600800 Evaluation of the Biological Effects of the Northwest Power and Conservation Councils Mainstem Amend. on the Fisheries Upstream & Downstream of Hungry Horse & Libby Dams, MT (Renumbered fr 200715200) State Montana Department of Fish, Wildlife and Parks Ongoing Mountain Columbia Flathead The Northwest Power and Conservation Council (Council) directed the region to test, implement, and evaluate an interim summer operation, called for by the Mainstem Amendments, that implement new drafting limits at Hungry Horse and Libby Dams. Resident $396,500 $396,500 $336,500 $396,500 $396,500 $336,500 $ 0 $ 0 $ 0
511 200715300 Cardwell Hills Wildlife Mitigation and regional Biodiversity Protection Project Private David Evans and Associates, Inc. New Lower Columbia Willamette Wildlife mitigation project to implement Cardwell Hills Regional Conservation Planning Strategy and Willamette Subbasin Plan through purchase or easement of up to 500 acres of upland prairie/savanna, oak woodlands, and riparian forest in Benton County, OR Wildlife Capitalize land acquisition - medium certainty Land acquisition requirements $1,903,141 $3,916,068 $2,798,459 $1,903,141 $3,916,068 $2,798,459 $ 0 $ 0 $ 0
512 200715400 Douglas County Multi Species Habitat Conservation Plan, Previously referred to as the Foster Creek Habitat Conservation Plan (FCHCP) SWCD Foster Creek Conservation District New Columbia Cascade Columbia Upper Middle Implementation of a 20 species habitat conservation plan approved by USFWS and NMFS potentially covering 800,000 acres to minimize and mitiage impacts from farming and ranching activites in Douglas County, Washington. Wildlife $125,000 $125,000 $125,000 $125,000 $125,000 $125,000 $ 0 $ 0 $ 0
513 200715500 Develop a Master Plan for a Rearing Facility to Enhance Selected Populations of White Sturgeon in the Columbia River Basin Tribe Columbia River Inter-Tribal Fish Commission (CRITFC) New Mainstem/Systemwide Systemwide Develop a Master Plan to create a regional Columbia Basin rearing facility for the enhancement of selected white sturgeon populations in reservoirs upstream of Bonneville Dam and downstream of Grand Coulee and Granite dams. Resident $141,687 $145,040 $148,491 $141,687 $145,040 $148,491 $ 0 $ 0 $ 0
515 200715600 Rock Creek Fish and Habitat Assessment for the Prioritization of Restoration and Protection. Tribe Yakama Confederated Tribes New Columbia Plateau Columbia Lower Middle Information will be collected on the abundance, growth, genetics, diseases, habitat condition, and movement of salmonids in Rock Creek, a unique watershed of the middle Columbia River. Anadromous $291,307 $254,940 $287,504 $291,307 $254,940 $287,504 $ 0 $ 0 $ 0
518 200715700 Bull Trout Status and Abundance Monitoring in the Waters in and Bordering the Warm Springs Reservation, Oregon Tribe Confederated Tribes of Warm Springs Reservation of Oregon New Columbia Plateau Deschutes Census bull trout abundance, determine fluvial life-history and identify threats from brook trout in the lower Deschutes Subbasin. Resident $150,330 $138,374 $151,519 $150,330 $138,374 $151,519 $ 0 $ 0 $ 0
521 200716000 Evaluation of spawning success in Pacific salmon using electromyogram telemetry Federal Pacific Northwest National Laboratory New Mainstem/Systemwide Systemwide We propose to implant sockeye salmon with electromyogram transmitters to determine when and how frequently they spawn, and to investigate differences in spawning among groups of fish exposed to different rearing conditions naturally migrating fish Anadromous $199,983 $205,896 $212,652 $199,983 $205,896 $212,652 $ 0 $ 0 $ 0
524 200716200 Kalispel Tribe Fish and Wildlife Coordination Tribe Kalispel Tribe New Mainstem/Systemwide Systemwide Participate in regional mitigation activities in implementation of the Fish and Wildlife Program and BPA's role in funding the Fish and Wildlife Program. All $90,000 $93,100 $96,200 $90,000 $93,100 $96,200 $ 0 $ 0 $ 0
527 200716400 Determination of Steelhead Production and Productivity Response to Habitat Manipulations in the Upper Potlatch River, Idaho State Idaho Department of Fish & Game New Mountain Snake Clearwater We will determine the production and productivity of steelhead trout in the Upper Potlatch River basin and compare tributary (spatial) varitations and trends in production and productivity to determine the effectiveness of habitat manipulations. Anadromous $262,126 $237,926 $241,767 $262,126 $237,926 $241,767 $ 0 $ 0 $ 0
528 200716500 Relative abundance, distribution, and population structure of lampreys in the Columbia River Basin Federal Columbia River Research Laboratory New Mainstem/Systemwide Systemwide This project will form a multi-agency collaboration to estimate the relative abundance and distribution of all life stages of lampreys in basins not studied previously. We will also collect tissue samples for genetic analysis of fish in different areas. Anadromous $667,711 $900,464 $1,001,775 $667,711 $900,464 $1,001,775 $ 0 $ 0 $ 0
529 200716600 Lower Columbia River Coastal Cutthroat Trout Population Response to Habitat Restoration Federal Columbia River Fisheries Program Office New Columbia Estuary Columbia Estuary Determine if habitat restoration efforts in the lower Columbia River and estuary are achieving the recovery goals for coastal cutthroat trout, an indicator species, of reversing declining abundance trends and maintaining life history diversity. Anadromous $413,500 $383,000 $408,500 $413,500 $383,000 $408,500 $ 0 $ 0 $ 0
533 200716800 Using otolith microstructure and microchemistry to delineate growth patterns and spatial structure of Snake River Fall Chinook salmon Federal National Oceanic & Atmospheric Administration (NOAA) New Mainstem/Systemwide Systemwide We will conduct microstructural and microchemical analyses of otoliths from Snake River Fall Chinook salmon to examine how growth patterns vary with juvenile migration timing and residence times in different habitats along their migration routes. Anadromous $459,527 $447,564 $460,992 $459,527 $447,564 $460,992 $ 0 $ 0 $ 0
534 200716900 Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam Federal Pacific Northwest National Laboratory New Lower Columbia Columbia Lower We propose to evaluate the potential for toxic exposure of incubating chum salmon to elevated total dissolved gas (TDG) below Bonneville Dam by 1) monitoring TDG below Bonneville Dam and 2) conducting laboratory toxicity tests on chum salmon alevins. Anadromous $451,147 $235,341 $164,912 $451,147 $235,341 $164,912 $ 0 $ 0 $ 0
537 200717000 South Fork Snake River Yellowstone cutthroat trout recruitment and survival improvement State Idaho Department of Fish & Game New Upper Snake Snake Headwaters Increase juvenile Yellowstone cutthroat trout recruitment and survival in the South Fork of the Snake River by minimizing entrainment losses and side channel stranding mortality, and by restoring tributary habitat. Resident Expense - fish screens not functionally interdependent $1,105,100 $1,107,400 $1,011,700 $1,105,100 $1,107,400 $1,011,700 $ 0 $ 0 $ 0
539 200717100 Malheur River Subbasin Habitat Restoration and Fish EnhancementStinkingwater Project Tribe Burns Paiute Tribe New Middle Snake Malheur This project proposes to acquire approximately 8,463 acres of the Lamb Ranch located 39 miles East of Burns, Oregon. Resident $3,965,560 $99,972 $194,887 $3,965,560 $99,972 $194,887 $ 0 $ 0 $ 0
540 200717200 UPA Project - MVID West Canal Diversion and Headworks NPO Methow Salmon Recovery Foundation New Columbia Cascade Methow Move POD 175' upstream by installing new concrete diversion headworks, realign 150' of West Canal intake and build new access road to connect new headworks, construct permanent channel-spanning natural rock roughened channel permanent diversion. Anadromous $249,900 $10,900 $14,950 $249,900 $10,900 $14,950 $ 0 $ 0 $ 0
544 200717300 Upper South Fork McKenzie Channel Restoration Federal US Forest Service (USFS) - Willamette New Lower Columbia Willamette This project will restore habitat essential to rearing spring chinook salmon and bull trout through restoration of large woody material to the upper South Fork McKenzie River. Anadromous $31,900 $11,900 $9,400 $31,900 $11,900 $9,400 $ 0 $ 0 $ 0
551 200717500 DNA typing to identify native inland Oncorhynchus mykiss Edu Washington State University New Mainstem/Systemwide Systemwide New DNA-Based Tests, which distinquish the Inland and Coastal forms of Rainbow Trout will be developed. These tests should be widely useful for genetic characterization of Columbia Basin Populations. Resident $80,445 $124,266 $129,235 $80,445 $124,266 $129,235 $ 0 $ 0 $ 0
552 200717600 A Freshwater Mussel Watch for Biomonitoring in the Columbia River Basin Tribe Confederated Tribes of the Umatilla Indian Reservation New Mainstem/Systemwide Systemwide We propose to establish a long-term, basinwide ecosystem biomonitoring program in the Columbia River Basin using freshwater mussels as bioindicators  The Freshwater Mussel Watch. Resident $276,971 $313,691 $302,043 $276,971 $313,691 $302,043 $ 0 $ 0 $ 0
553 200717700 Protecting wild steelhead populations by minimizing the behavioral differences between hatchery and wild populations. Federal Northwest Fisheries Science Center New Mainstem/Systemwide Systemwide A research program to determine the behavioral differences in wild and integrated hatchery steelhead populations, identify mechanisms that cause differences between populations, determine their consequences, and inform science-based hatchery reforms. Anadromous $285,438 $309,678 $318,997 $285,438 $309,678 $318,997 $ 0 $ 0 $ 0
554 200717800 Monitoring fine sediment delivery in the Entiat subbasin Federal US Forest Service (USFS) - Pacific Northwest Research Station New Columbia Cascade Entiat Develop and test improved protocols for monitoring fine sediment in salmonid habitat. Anadromous $265,570 $145,830 $154,010 $265,570 $145,830 $154,010 $ 0 $ 0 $ 0
556 200718000 Evaluating and prioritizing restoration of riparian habitat for improving in-stream conditions for anadromous salmonids in the Columbia River basin. Federal US Forest Service (USFS) - Pacific Northwest Research Station New Mainstem/Systemwide Systemwide Develop an aquatic-riparian model that predicts dynamics of streams and riparian zones, the potential distribution of salmonid habitat in watersheds, the potential for passive management to meet restoration goals, and the effects of management decisions. Anadromous $190,328 $197,144 $210,019 $190,328 $197,144 $210,019 $ 0 $ 0 $ 0
558 200718100 Lower Lawyer Creek Stream Restoration Project Private Flying B Ranch New Mountain Snake Clearwater The projects primary focus is to enhance anadromous species habitat. Secondary but important benefits are to enhance wetlands, provide flood control and enhance habitat for both terrestrial and aquatic wildlife. Anadromous $782,500 $782,500 $22,793 $782,500 $782,500 $22,793 $ 0 $ 0 $ 0
560 200718300 Restoration of Historical Salmonid Habitat in South West Idaho NPO Southwest Idaho RC&D New Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince Fish passage at road crossings throughout Southwest Idaho has greatly reduced historical anadromous & resident salmonid habitat and migratory routes. This project, culvert barrier replacement in cooperation with tribal governments will restore salmonids. Anadromous $382,000 $336,000 $338,000 $382,000 $336,000 $338,000 $ 0 $ 0 $ 0
564 200718600 Middle Fork Willamette River Bull Trout Passage and Habitat Restoration Federal US Forest Service New Lower Columbia Willamette Proposal to complete fish passage and spawning ground restoration in an area on the Middle Fork Willamette River where bull trout have been re-introduced by a multi-agency partnership. Resident $365,000 $50,000 $50,000 $365,000 $50,000 $50,000 $ 0 $ 0 $ 0
566 200718700 Use of Mainstem Habitats by Juvenile Pacific Lamprey (Lampetra tridentata) Federal Pacific Northwest National Laboratory New Mainstem/Systemwide Systemwide Characterize the use of mainstem Columbia and lower Snake river habitats by juvenile Pacific lamprey and identify river reaches with high potential for restoration or expanded use. Anadromous $144,910 $166,255 $100,033 $144,910 $166,255 $100,033 $ 0 $ 0 $ 0
637 200718800 Lower Willamette River Fish Passage and Floodplain Reconnection at Oaks Bottom Wildlife Refuge NPO City of Portland New Lower Columbia Willamette This proposal is to design and implement a fish passage and floodplain reconnection/restoration project at Oaks Bottom Wildlife Refuge. The primary features include replacement of a culvert, excavation of tidal sloughs, and riparian restoration. Anadromous $390,000 $765,000 $45,000 $390,000 $765,000 $45,000 $ 0 $ 0 $ 0
571 200719000 Icicle Creek Ecological Recovery and Fish Population Monitoring NPO Washington Trout New Columbia Cascade Wenatchee [left blank] Resident $213,500 $170,786 $170,786 $213,500 $170,786 $170,786 $ 0 $ 0 $ 0
575 200719300 Evaluate potential to enhance spawning of summer/fall chinook salmon in the tailrace of Chief Joseph Dam, Columbia River, WA Tribe Colville Confederated Tribes New Columbia Cascade Columbia Upper Middle This project will map potential spawning habitat in the tailrace of Chief Joseph Dam. We will estimate the number of summer/fall chinook redds that could be supported and evaluate the feasibility to increase production by altering hydrosystem operation. Anadromous $284,377 $234,762 $275,258 $284,377 $234,762 $275,258 $ 0 $ 0 $ 0
576 200719400 Oak Flats Acquisition and Habitat Enhancement State Washington Department of Fish and Wildlife (WDFW) New Columbia Plateau Yakima Acquire a 300 acre multi-parcel site on the Naches River to protect from rural development and enhance 3.0 miles of streamside riparian habitat. Site supports Chinook salmon and Federally threatened mid-Columbia summer steelhead and bull trout. Anadromous $620,800 $23,500 $7,770 $620,800 $23,500 $7,770 $ 0 $ 0 $ 0
579 200719700 Evaluating the sublethal impacts of current use pesticides on the environmental health of salmonids in the Columbia River Basin. Federal Northwest Fisheries Science Center New Mainstem/Systemwide Systemwide Evaluate the direct and indirect effects of pesticides on the physiology, behavior and growth of individual salmon and the productivity of salmon populations. Anadromous $336,400 $354,000 $366,000 $336,400 $354,000 $366,000 $ 0 $ 0 $ 0
580 200719800 Next Steps in Subbasin Planning: Umatilla Pilot Project Tribe Confederated Tribes of the Umatilla Indian Reservation New Mainstem/Systemwide Systemwide The purpose of this project is to nurture regionally standardized modeling of managed salmonid stocks using a pilot study of Umatilla Summer Steelhead, and will include collaborative sub-contracts with Columbia Basin Agencies and Authorities. Anadromous $382,432 $420,675 $462,742 $382,432 $420,675 $462,742 $ 0 $ 0 $ 0
582 200720000 Idaho Subbasin Planning and Comprehensive Wildlife Conservation Strategy (CWCS) Data Distribution System State Idaho Department of Fish & Game New Mainstem/Systemwide Systemwide Provide Idahos subbasin planning data and Comprehensive Wildlife Conservation Strategy data over the web. It will provide fish, wildlife, rare plant and habitat data and information in a variety of formats through a database driven, interactive website. All $139,489 $146,464 $153,787 $139,489 $146,464 $153,787 $ 0 $ 0 $ 0
591 200721000 Mores Creek Watershed Floodplain and Habitat Restoration: Design and Implementation NPO West Central Highlands Resource Conservation and Development Council New Middle Snake Boise The Idaho City Ranger District is teaming with the WCH RC&D and numerous partners to develop a comprehensive, long-term, watershed-scale strategy to restore mining impacted reaches within the Mores Creek watershed in southwestern Idaho. Resident $1,042,400 $830,800 $868,300 $1,042,400 $830,800 $868,300 $ 0 $ 0 $ 0
593 200721200 Develop a locally-adapted summer steelhead program to supplement natural production throughout the Okanogan River basin Tribe Colville Confederated Tribes New Columbia Cascade Okanogan Evaluate Cassimer Bar Hatchery, using the NPCC's 3 step process, to meet the estimated production level of 200,000 steelhead smolts to supplement natural reproduction within the Okanogan River basin. Assess current sub-population and habitat in tribs. Anadromous Capitalize hatchery upgrade $1Million Threshold $300,736 $227,561 $1,132,242 $300,736 $227,561 $1,132,242 $ 0 $ 0 $ 0
594 200721300 Assessing Recruitment Failure Across White Sturgeon Populations: Differences in Prey Availability and Physical Habitat Among Areas with Consistent, Inconsistent, and no Annual Recruitment to Age-1 Federal US Geological Survey (USGS) - Cook New Mainstem/Systemwide Systemwide Investigate causes of recruitment failure in white sturgeon populations across the Columbia Basin by comparing availability of forage at the onset of exogenous feeding, channel morphology, and hydraulic conditions in several sturgeon spawning areas Resident $547,057 $773,105 $727,882 $547,057 $773,105 $727,882 $ 0 $ 0 $ 0
595 200721400 UPA Project - Fender Mill Floodplain Restoration - Phase 1 NPO Methow Salmon Recovery Foundation New Columbia Cascade Methow Restore natural channel process, reestablish side channel rearing habitat, restore-improve riparian forest habitat, add wood complexes in main stem, install rock structure to keep majority of flow in main stem, breach existing levee, connect side channels Anadromous $127,141 $12,630 $17,100 $127,141 $12,630 $17,100 $ 0 $ 0 $ 0
597 200721500 Adult Steelhead Monitoring in Trout Creek State Washington Department of Fish and Wildlife (WDFW) New Columbia Gorge Wind The US Forest Service has proposed to remove Hemlock Dam, located on Trout Creek, a tributary of the Wind River. WDFW proposes to install a resistivity counter to evaluate effectiveness of dam and to maintain adult count dataset. Anadromous $61,500 $344,120 $11,620 $61,500 $344,120 $11,620 $ 0 $ 0 $ 0
598 200721600 Pacific Northwest Aquatic Monitoring Partnership-Fish Population Monitoring (FPM)--RME Design and Protocols. Programmatic and Standardized Work Products for PNW and the Columbia Basin Edu Pacific Northwest Aquatic Monitoring Partnership (PNAMP) New Mainstem/Systemwide Systemwide This proposal will support four FY 07-09 tasks to standardize RME protocols, indicators, methods and analytical processes. All tasks have been approved by the PNAMP Steering Committee representing 20 Charter Agencies. www.reo.gov/PNAMP/http://www.reo Anadromous $19,718 $28,718 $28,718 $19,718 $28,718 $28,718 $ 0 $ 0 $ 0
599 200721700 Operation and Maintenance for Walla Walla Basin Passage Projects Irrig.Dist. Gardena Farms Irrigation Dist. and Hudson Bay Dist. Improvement Co. New Columbia Plateau Walla Walla Operation and maintenance of BPA-Constructed fish passage facilities in the Walla Walla Sub-basin. Anadromous $182,725 $182,725 $182,725 $182,725 $182,725 $182,725 $ 0 $ 0 $ 0
600 200721800 Development of single nucleotide polymorphism (SNPs) genetic markers diagnostic between coastal rainbow trout and interior redband trout State Idaho Department of Fish & Game New Mountain Columbia Kootenai This project will attempt to identify unique nuclear DNA markers to allow differentiation of interior redband trout and coastal rainbow trout, allowing biologists to assess intraspecific hybridization and introgression Resident $60,689 $25,392 $ 0 $60,689 $25,392 $ 0 $ 0 $ 0 $ 0
601 200721900 Clackamas Watershed Prioritized Fish Passage Barrier Removal NPO Clackamas River Basin Council New Lower Columbia Willamette Coordinate the repair of the number two prioritized fish passage barriers in the Lower Clackamas watershed in Clear Creek in order to re-establish full access to sixteen miles of habitat and increase production of coho salmon and winter steelhead. Anadromous $21,520 $164,520 $20,020 $21,520 $164,520 $20,020 $ 0 $ 0 $ 0
602 200722000 Water and Economic Optimization Project to Restore Streamflow in Fifteenmile Creek in the Fifteenmile Sub-basin. NPO Wyeast Resource Conservation & Development Area Council New Columbia Gorge Fifteenmile As irigated agriculture adopts a new management paradigm based on economic objecdtives--the maximization of net benefit--rather than maximizing biological yields. Water optimization is a departure from current conventional irrigation practices. Anadromous $339,993 $179,673 $160,573 $339,993 $179,673 $160,573 $ 0 $ 0 $ 0
603 200722100 Native Trout Restoration in the Methow, Entiat, and Wenatchee Subbasins State Washington Department of Fish and Wildlife (WDFW) New Columbia Cascade Methow Recovery to naturally sustainable levels of native resident trout populations in portions of the Methow, Entiat, and Wenatchee watersheds. Investigate small tributaries including high lakes where invasive species threaten native trout populations. Resident $178,892 $188,260 $209,787 $178,892 $188,260 $209,787 $ 0 $ 0 $ 0
605 200722300 Genetic characteristics and movement patterns of bull trout populations between Chief Joseph and McNary Dams, within the Columbia Cascade and Columbia Plateau Provinces Federal US Fish & Wildlife Service (USFWS) New Mainstem/Systemwide Systemwide Proposed work is to use existing and new bull trout population information. Approach will use genetic analysis techniques, radio telemetry and pit tagging will be used to look at populations (same as new project 200722200 in the Columbia Plateau Province Resident $400,298 $404,786 $395,429 $400,298 $404,786 $395,429 $ 0 $ 0 $ 0
607 200722400 Implementation of the Okanogan Subbasin Plan. Initiate a Programmatic and Sequenced set of Key Habitat Restoration and Protection Actions Tribe Colville Confederated Tribes New Columbia Cascade Okanogan The integration of science into management, decision-making and recommended actions is an essential task for resource managers. This phased and programmatic plan is the centerpiece for mitigation, recovery and conservation in the Okanogan R & the Province Anadromous $296,705 $700,505 $804,490 $296,705 $700,505 $804,490 $ 0 $ 0 $ 0
610 200722700 Rapid DNA Profiling of Hatchery and Wild Salmon Stocks with Single Nucleotide Polymorphism (SNP) Profiling Federal Pacific Northwest National Laboratory New Mainstem/Systemwide Systemwide The objective of this proposal is to provide genetic profiling by single nucleotide polymorphism (SNP) analysis to the genetic issues that underlie Chinook salmon protection and enhancement with the Columbia basin. Anadromous $213,250 $232,194 $66,755 $213,250 $232,194 $66,755 $ 0 $ 0 $ 0
613 200722900 Development of protocols and priorities for re-establishing naturally reproducing populations of Upper Willamette River Chinook Salmon above US Army Corps of Engineers dams in the Willamette Subbasin State Oregon Department of Fish & Wildlife (ODFW) New Lower Columbia Willamette Project will develop strategies for re-establishing self sustaining populations of Willamette Spring Chinook above 10 dams in the Willamette Subbasin. Major objectives include quantifiying habitat potential and increasing survival and genetic diversity. Anadromous $364,001 $522,125 $509,700 $364,001 $522,125 $509,700 $ 0 $ 0 $ 0
615 200723000 Selective Gear Demonstration Project: Reef Net Fishing Gear for Lower Columbia River Commercial Salmon Fishery Edu Washington Sea Grant Program New Mainstem/Systemwide Systemwide This project will demonstrate whether reefnet fishing gear, currently in use in Puget Sound, would be more selective of protected salmon species and prove practical and economical as commercial gear than currently used gillnet and tangle net gear. Anadromous $50,697 $53,716 $35,028 $50,697 $53,716 $35,028 $ 0 $ 0 $ 0
616 200723100 UPA Entiat Subbasin Riparian Enhancement Program SWCD Chelan County Conservation District (SWCD) New Columbia Cascade Entiat Riparian projects are being proposed in the Entiat subbasin to benefit Upper Columbia spring Chinook, steelhead and bull trout. Funding is requested for Tillicum Creek Fence and potential programmatic riparian projects. Anadromous $71,053 $82,257 $82,257 $71,053 $82,257 $82,257 $ 0 $ 0 $ 0
617 200723200 Okanogan-Similkameen Habitat Protection Project - Fish and wildlife habitat protection through fee simple and conservation easement purchases. State Washington Department of Fish and Wildlife (WDFW) New Columbia Cascade Okanogan Acquire high quality shrub-steppe, dry forest, and riparian habitats, and help secure a critical international wildlife corridor in the Okanogan-Similkameen Watershed. Support Okanogan Subbasin Plan, WDFW mission and other regional planning efforts. Wildlife Capitalize land acquisition Functionally interdependent $625,000 $877,500 $877,500 $625,000 $877,500 $877,500 $ 0 $ 0 $ 0
618 200723300 Distribution and Abundance Monitoring of Oncorhynchus mykiss within the Lower Clearwater Subbasin Tribe Nez Perce Tribe Dept. Fisheries Resource Management Watershed Division New Mountain Snake Clearwater Project will address the lack of spatial distribution and abundance data for the Lower Clearwater River subpopulation of the Snake River Basin steelhead DPS through electrofishing surveys conducted at probabilistically located sites. Anadromous $373,367 $350,615 $350,615 $373,367 $350,615 $350,615 $ 0 $ 0 $ 0
619 200723400 Assessing Habitat and Environmental Suitability for Northern Leopard Frogs in the Crab Creek and Pend Oreille Sub-basins of Eastern Washington State Washington Department of Fish and Wildlife (WDFW) New Columbia Plateau Crab We will improve environmental conditions and evaluate disease in 2 leopard frog populations. We will develop a leopard frog habitat suitability model and apply it in the Crab Creek and Pend Oreille drainages to estimate translocation site availability. Wildlife $179,751 $183,075 $190,644 $179,751 $183,075 $190,644 $ 0 $ 0 $ 0
620 200723500 Proposal to Create a Sub-Basin Plan for the Blackfoot River Sub-Basin NPO Trout Unlimited New Mountain Columbia Blackfoot In this proposal, Trout Unlimited will coordinate a planning effort to create a sub-basin plan for the Blackfoot River sub-basin. Resident $32,133 $29,133 $32,134 $32,133 $29,133 $32,134 $ 0 $ 0 $ 0
622 200723600 Strategic Adaptation of the Federal Columbia River Power System to Climate Variability and Change Edu Portland State University New Mainstem/Systemwide Systemwide The FCRPS must respond to climate variations and change. We will develop much-needed hydrologic and economic models, remotely-sensed habitat metrics, and scientifc understanding of FCRPS impacts on juvenile salmonids in the river, estuary and plume Anadromous $490,430 $491,812 $477,808 $490,430 $491,812 $477,808 $ 0 $ 0 $ 0
624 200723700 UPA Project - Elbow Coulee Floodplain Restoration NPO Methow Salmon Recovery Foundation New Columbia Cascade Methow This project would eliminate a dike; open an existing side channel and floodplain; reconnect a wetland; and use large woody debris and boulders to split flows. These would increase habitat complexity and create more dynamic habitats for listed salmonids. Anadromous $122,662 $3,800 $8,900 $122,662 $3,800 $8,900 $ 0 $ 0 $ 0
849 200723800 Providing Services to Assist Record Keeping of Over the Bank Sales in Zone 6 Tribal Fisheries Private Steven Vigg & Company New Mainstem on the ground/Multiprovince Mainstem on the ground/Multiprovince This project would provide for coordination of monitoring and record keeping services for "over-the-bank" retail sales of salmonids in Zone 6 Tribal fisheries  in conjunction with with CRITFC harvest management, enforcement, and marketing. Anadromous $74,027 $74,027 $74,026 $74,027 $74,027 $74,026 $ 0 $ 0 $ 0
628 200724100 Well modifications to improve aquatic habitat for Toppenish/Simcoe Creeks. Tribe Yakama Confederated Tribes New Columbia Plateau Yakima Well construction in the vicinity of Toppenish/Simcoe Creeks has resulted in the drainage of shallow groundwater to deeper thief zones. Modification of selected basalt wells in the region could restore groundwater levels and improve aquatic habitat. Anadromous $1,120,727 $100,000 $40,695 $1,120,727 $100,000 $40,695 $ 0 $ 0 $ 0
629 200724200 Fifteenmile Subbasin Efficient Irrigation Technology SWCD Wasco County Soil & Water Conservation District (SWCD) New Columbia Gorge Fifteenmile Project will upgrade irrigation technology on 1,000 acres of orchard land from impact sprinklers (~65% efficient) to microsprinklers or drip irrigation with mulch (95% efficient or better). Total water savings are estimated at 900 acre-feet per year. Anadromous $423,912 $424,413 $425,005 $423,912 $424,413 $425,005 $ 0 $ 0 $ 0
630 200724300 Crab Creek Subbasin Plan 2007 State Washington Department of Fish and Wildlife (WDFW) New Columbia Plateau Crab Project will provide a more complete wildlife section (assessment, inventory, and management plan) and address key ISRP comments on the original Crab Creek Subbasin Plan.The goal of the project is the adoption of the Crab Creek Subbasin Plan by the NWPCC. Wildlife $5,778 $ 0 $ 0 $25,778 $ 0 $ 0 $-20,000 $ 0 $ 0
634 200724500 Protect and Restore the Joseph Creek Watershed Tribe Nez Perce Tribe New Blue Mountain Grande Ronde This project seeks to continue protecting existing high quality habitat. It further seeks to restore and enhance habitat where feasible and opportunity exists. Another component of this proposal is education and outreach. Anadromous $834,666 $859,236 $889,872 $834,666 $859,236 $889,872 $ 0 $ 0 $ 0
635 200724600 Restoration of bull trout passage at Albeni Falls Dam using a trap-and-haul approach in conjunction with investigations to assess effectiveness of rapid genetic analysis in assigning natal tributary Tribe Kalispel Tribe New Intermountain Pend Oreille The goal of this project is to provide temporary upstream passage for bull trout at Albeni Falls Dam, Pend Oreille River. Effectiveness of the action will be evaluated using RM&E. Resident $756,658 $385,662 $411,495 $756,658 $385,662 $411,495 $ 0 $ 0 $ 0
638 200724700 Priscilla Peak Wildlife Habitat Restoration (Prescribed Fire) Federal US Forest Service New Mountain Columbia Clark Fork We would like to apply prescribed fire to about 4,800 acres of forest and grass-shrub communities that have been degraded by fire suppression. Prescribed fire will enhance habitat for bighorn sheep and improve the potential for grizzly bear reoccupancy. Wildlife $103,000 $103,000 $104,500 $103,000 $103,000 $104,500 $ 0 $ 0 $ 0
641 200724900 Evaluation of Live Capture, Selective Fishing Gear Tribe Colville Confederated Tribes New Mainstem/Systemwide Systemwide The project will evaluate promising live-capture, selective fishing gears to increase harvest of target species while conserving weak stocks. Results will be applicable to other tributary and mainstem locations. Anadromous $394,600 $254,800 $264,000 $394,600 $254,800 $264,000 $ 0 $ 0 $ 0
643 200725000 Genetic Evaluation of Chinook Salmon Supplementation in Idaho Rivers Multiple Idaho Department of Fish and Game / Nez Perce Tribe New Mountain Snake Salmon We intend to use DNA analyses to quantify the relative reproductive success of Chinook salmon of various origins in ISS study streams. This will help determine the effect of "de facto" supplementation by hatchery strays in treatment and control streams. Anadromous $1,287,711 $959,465 $966,814 $1,287,711 $959,465 $966,814 $ 0 $ 0 $ 0
644 200725100 UPA Project - Methow Valley Irrigation District East Diversion Dam Replacement NPO Methow Salmon Recovery Foundation New Columbia Cascade Methow This project will remove the present channel-spanning irrigation diversion dam and replace it with a reinforced earth and rock wing dam parallel to the thalweg. This project will also re-open 1/4 mile of side channel habitat blocked by a pushup berm. Anadromous $44,800 $542,800 $29,800 $44,800 $542,800 $29,800 $ 0 $ 0 $ 0
645 200725200 Multi-scale assessment of hyporheic flow, temperature and fish distribution in Columbia River Tributaries Tribe Confederated Tribes of the Umatilla Indian Reservation New Mainstem/Systemwide Systemwide We propose to develop and implement tributary floodplain assessments to evaluate the importance of hyporheic exchange, geomorphic diversity and temperature patterns to salmon productivity across all tributaries of the Columbia River Basin. Anadromous $226,306 $195,372 $178,888 $226,306 $195,372 $178,888 $ 0 $ 0 $ 0
648 200725300 Monitoring of Adult Abundance and Spatial Distribution for Snake River Spring/Summer Chinook Salmon ESU Populations Multiple Nez Perce Tribe / Idaho Department of Fish and Game New Mainstem/Systemwide Systemwide This project will coordinate ongoing monitoring activities and implement new monitoring where needed to provide data for spring/summer Chinook salmon Snake River ESU populations for ESA delisting decision analysis and effectiveness monitoring. Anadromous $505,083 $458,274 $365,394 $505,083 $458,274 $365,394 $ 0 $ 0 $ 0
763 200725400 StreamNet Support and Services for Conservation and Recovery Data Needs Federal Pacific States Marine Fisheries Commission (PSMFC) New Mainstem/Systemwide Systemwide StreamNet will collaborate with CSMEP, aka CBFWA Monitor/Eval Program, (Project# 2003-036-00) to provide data management and application development needed to support fish population monitoring efforts by CSMEP. Anadromous $155,818 $163,609 $171,789 $155,818 $163,609 $171,789 $ 0 $ 0 $ 0
652 200725500 Protect and Restore the Middle Lochsa Tribe Nez Perce Tribe DFRM Watershed Division New Mountain Snake Clearwater This project will protect, restore, and return critical spawning and rearing habitat to the Analysis Area using a holistic approach to restoration. Projects will be coordinated with the USFS. Anadromous $224,487 $224,487 $224,486 $224,487 $224,487 $224,486 $ 0 $ 0 $ 0
655 200725600 Physical and Biological Testing of a Flow Velocity Enhancement System Private Natural Solutions New Mainstem/Systemwide Systemwide Natural Solutions patented Flow Velocity Enhancement System has been developed to provide migration cues using mechanically generated iturbulent-flow fields. It is proposed that strategic placement of these flow fields will enchance smolt migration. Anadromous $251,546 $330,691 $ 0 $251,546 $330,691 $ 0 $ 0 $ 0 $ 0
656 200725700 Protect and Restore the Imnaha Subbasin Tribe Nez Perce Tribe New Blue Mountain Imnaha This project seeks to continue protecting existing high quality habitat. It further seeks to restore and enhance habitat where feasible and opportunity exists. Another component of this proposal is education and outreach. Anadromous $1,143,967 $1,162,474 $1,195,208 $1,143,967 $1,162,474 $1,195,208 $ 0 $ 0 $ 0
657 200725800 Development of reliable ESU-specific estimates of escapement, harvest, and straying for adult anadromous salmonids migrating through the Federal Columbia River Power System. Edu University of Idaho New Mainstem/Systemwide Systemwide We will use telemetry monitoring of wild returning adult Chinool salmon and steelhead of known (PIT tagged as juveniles) and unknown origins to obtain timely systemwide and sub-basin specific escapement, harvest and straying estimates. Anadromous $938,732 $958,585 $979,035 $938,732 $958,585 $979,035 $ 0 $ 0 $ 0
658 200725900 Wilson Creek Relocation and Rehabilitation Edu Central Washington University New Columbia Plateau Yakima The project would daylight and rehabilitate Wilson Creek to increase the creeks habitat value for anadromous and resident fish, waterfowl, and other riparian plants and wildlife, and control flooding to reduce strain on the Creek. Resident $2,725,000 $ 0 $ 0 $2,725,000 $ 0 $ 0 $ 0 $ 0 $ 0
659 200726000 Acquisition of a Conservation Easement over 1084 acres of Upland Prairie and Oak Habitat, Willamette Subbasin NPO Nature Conservancy New Lower Columbia Willamette We propose to cost-share on acquisition of a conservation easement over focal habitats within priority areas identified in the Willamette Subbasin Plan and subsequent FY07-09 Guidance to benefit focal species and address BPA's wildlife mitigation need Wildlife Capitalize permanent easement Land acquisition requirements $4,969,000 $10,000 $ 0 $4,969,000 $10,000 $ 0 $ 0 $ 0 $ 0
660 200726100 Habitat effectiveness survey of existing, historical, and potential beaver habitat in the Upper Columbia Basin, Methow Subbasin NPO Pacific Biodiversity Institute New Columbia Cascade Methow The first phase of this project is a survey of existing and historical beaver habitat accompanied by an evaluation of existing habitat effectiveness models. Anadromous $79,240 $ 0 $ 0 $79,240 $ 0 $ 0 $ 0 $ 0 $ 0
676 200726200 Enhanced Landscape Classification to Improve Assessment of Conservation Restoration and Mitigation Projects Federal Pacific Northwest National Laboratory New Mainstem/Systemwide Systemwide Integrated landscape analysis and hydrologic modeling will be applied to spatially define ecosystem attributes used to quantify the contribution/influence of land parcels to riparian and watershed function and fish and wildlife productivity. Anadromous $295,911 $306,851 $291,753 $295,911 $306,851 $291,753 $ 0 $ 0 $ 0
664 200726400 UPA Project - Programmatic Habitat Complexity Projects in the Methow River Subbasin NPO Methow Salmon Recovery Foundation New Columbia Cascade Methow These projects would eliminate dikes, open side channels, and enhance floodplain connectivity at various sites in the Methow subbasin. Identification and ranking to be based on MIHRP study. Submitted as budget placeholder at request of BPA (Chris Furey). Anadromous $492,500 $620,500 $882,000 $492,500 $620,500 $882,000 $ 0 $ 0 $ 0
668 200726500 Complete and Coordinate a Subbasin Plan for the Bitterroot Watershed NPO Montana Water Trust New Mountain Columbia Bitterroot The Montana Water Trust proposes to coordinate the subbasin planning process in the Bitterroot Watershed during FY 2007-2009. We will work with local, state, federal, and tribal groups, as well as the public, to complete an effective plan. Resident $50,000 $50,000 $50,000 $60,000 $75,000 $75,000 $-10,000 $-25,000 $-25,000
673 200726700 Probabilistic Monitoring of the Status and Trends of Habitat, Water Quality, and Fish Presence in the Washington Portion of the Columbia River Basin State Interagency Committee (IAC) New Mainstem/Systemwide Systemwide The Washington State Office of the Interagency Committee (IAC) on behalf of the Governors Forum on Monitoring (FORUM) and in cooperation with the Department of Ecology, Governors Salmon Recovery Office (GSRO), and the Lower Columbia Fish Recovery Board Anadromous $835,391 $1,076,591 $1,076,591 $835,391 $1,076,591 $1,076,591 $ 0 $ 0 $ 0
495 200726800 Idaho Watershed Habitat Restoration Project via Custer Soil and Water Conservation District SWCD Custer County Soil & Water Conservation District (SWCD) New Mountain Snake Salmon The project scope is to implement high priority action items to maintain, enhance and restore fish habitat and fish passage in the priority stream segments of the Upper Salmon Basin area within the administrative boundaries of the Custer SWCD. Anadromous Expense - small independent projects not capital $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $ 0 $ 0 $ 0
674 200726900 Clearwater Coho Restoration Project Tribe Nez Perce Tribe New Mountain Snake Clearwater The Nez Perce Tribe goal is to restore coho salmon to the Clearwater subbasin measured by 14,000 adults at Lower Granite Dam annually. This proposal is for completing the Step planning process and construction based on the 2004 Master Plan. Anadromous $93,277 $247,210 $255,057 $93,277 $247,210 $255,057 $ 0 $ 0 $ 0
675 200727000 Lake Rufus Woods Subbasin Area Stock Assessment, Habitat Assessment and Fisheries Evaluation Program Tribe Colville Confederated Tribes New Intermountain Columbia Upper Conduct fisheries assessments and evaluations, habitat assessments, water chemistry studies and primary and secondary production studies within the Rufus Woods subbasin. Supplementation of salmonids to provide increased tribal and sport harvest. Resident $749,982 $642,890 $637,533 $626,892 $538,807 $537,949 $123,090 $104,083 $99,584
677 200727100 Willamette Basin Capitalized Wildlife Land Acquisitions Tribe The Confederated Tribes of Grand Ronde New Lower Columbia Willamette The Confederated Tribes of Grand Ronde would contract with the BPA to acquire 650 wildlife habitat units in the Willamette Subbasin at a fixed price range. Wildlife Capitalize land acquisition Land acquisition requirements $2,572,046 $2,638,077 $2,698,060 $2,572,046 $2,638,077 $2,698,060 $ 0 $ 0 $ 0
679 200727200 Conservation and Recovery of Endangered Species Act Listed Floodplain Fishes in the Willamette Basin, with Emphasis on Oregon Chub Federal US Fish & Wildlife Service (USFWS) New Lower Columbia Willamette The primary focus of the proposed project is for the conservation and recovery of Endangered Species Act (ESA) listed floodplain fishes and their habitats in the Willamette Basin. The project is a collaborative effort between various agencies. Resident $294,109 $143,629 $143,629 $294,109 $143,629 $143,629 $ 0 $ 0 $ 0
680 200727300 Evaluate the effects of hyporheic exchange on egg pocket water temperature in Snake River fall Chinook salmon spawning areas Federal Pacific Northwest National Laboratory New Blue Mountain Snake Hells Canyon The research to be conducted under this proposal will evaluate relationships among river discharge, hyporheic zone characteristics, egg pocket water temperature, and emergence timing of Snake River fall chinook salmon. Anadromous $163,547 $210,086 $193,557 $163,547 $210,086 $193,557 $ 0 $ 0 $ 0
681 200727400 A Proposal to Expand Current Juvenile Salmonid Monitoring in the Lower Columbia Province to Meet the Monitoring Needs Identified in the Lower Columbia Salmon Recovery and Subbasin Plan. State Washington Department of Fish and Wildlife (WDFW) New Lower Columbia Columbia Lower This proposal addresses the in-depth juvenile monitoring gaps identified from the LCFRB (2004) plan at the Level 3 or least intensive level, and builds on the existing juvenile salmonid monitoring program in Washingtons Lower Columbia River domain. Anadromous $260,655 $156,602 $162,463 $260,655 $156,602 $162,463 $ 0 $ 0 $ 0
682 200727500 Impact of American shad in the Columbia River Federal Columbia River Research Laboratory New Mainstem/Systemwide Systemwide American are the most abundant anadromous fish in the Columbia River, although we know little about their potential impacts on salmonids and other parts of the aquatic community. We propose basic research on potential impacts of juvenile and adult shad. Anadromous $278,736 $360,313 $365,160 $278,736 $360,313 $365,160 $ 0 $ 0 $ 0
690 200727600 Idaho Department of Fish and Game Rearing Expansion for Snake River Sockeye Salmon State Idaho Department of Fish & Game New Mountain Snake Salmon This capital proposal addresses the need to increase the return of anadromous Snake R. sockeye salmon to Idaho. Incorporating "fit" anadromous adults into the captive spawning design is a recommended action for this closed population Anadromous Capitalize hatchery purchase and remodel None $5,252,090 $1,261,278 $270,823 $5,252,090 $1,261,278 $270,823 $ 0 $ 0 $ 0
687 200727700 Hamilton Creek Stabilization and Habitat Rehabilitation State Skamania County New Lower Columbia Columbia Lower The stablization and habitat rehabilitation of 5300 feet of Hamilton Creek, North Bonneville, Skamania County, Washington. Anadromous $969,270 $107,925 $29,350 $969,270 $107,925 $29,350 $ 0 $ 0 $ 0
691 200727900 Assess Stream Habitat for Salmonid Recovery in the Lower Clearwater Subbasin SWCD Nez Perce Soil & Water Conservation District (SWCD) New Mountain Snake Clearwater This project collects stream inventory and assessment data on 231.4 miles within the Lower Clearwater River basin. Anadromous $122,525 $98,317 $101,253 $122,525 $98,317 $101,253 $ 0 $ 0 $ 0
692 200728000 Columbia River Basin Journal Private Intermountain Communications New Mainstem/Systemwide Systemwide The Columbia River Basin Journal will be an on-line journal devoted to the timely dissemination of current research information related to Columbia River Basin fish and wildlife mitigation and recovery. All $105,000 $100,000 $100,000 $105,000 $100,000 $100,000 $ 0 $ 0 $ 0
693 200728100 Washington Salmonid Abundance and Productivity Monitoring Framework State Washington Department of Fish and Wildlife (WDFW) New Mainstem/Systemwide Systemwide Develops a statewide framework for monitoring the VSP parameters of juvenile and adult abundance and productivity for ESA listed salmonids. Implements monitoring at sites specified in the framework and enables prioritization of monitoring efforts. Anadromous $512,000 $334,000 $364,000 $173,000 $151,000 $169,000 $339,000 $183,000 $195,000
694 200728200 Okanagan River Restoration Initiative: Phases IV & V Tribe Okanagan Nation Alliance New Columbia Cascade Okanogan The objective of the project is to re-naturalize 0.7 miles of channel by moving back dykes, restoring river meanders, creating pool/riffle sequences, reconnecting the river to its former floodplain and replanting riparian vegetation. Anadromous $1,083,262 $1,066,234 $93,184 $1,083,262 $1,066,234 $93,184 $ 0 $ 0 $ 0
769 200728300 UPA Wenatchee Subbasin Access Proposal NPO Chelan County Natural Resources Department New Columbia Cascade Wenatchee Forty three (43) potential fish passage barrier structures are being proposed for funding to benefit Upper Columbia spring Chinook, steelhead and bull trout. Emphasis is on replacing the Mill Creek Culvert near the mouth of Peshastin Creek. Anadromous $1,875,348 $1,875,348 $ 0 $1,875,348 $1,875,348 $ 0 $ 0 $ 0 $ 0
700 200728500 Subyearling chinook salmon use of the Lower Willamette River. NPO City of Portland New Lower Columbia Willamette This study will investigate racial composition, habitat use and migration/residence time of subyearling chinook salmon in the Lower Willamette River. Anadromous $422,560 $418,032 $428,082 $422,560 $418,032 $428,082 $ 0 $ 0 $ 0
701 200728600 Deschutes Cooperative Stream Flow Restoration SWCD Deschutes Soil and Water Conservation District New Columbia Plateau Deschutes Restoration of stream flows in the Deschutes basin above the Pelton Round Butte complex to sustain the successful reintroduction of anadromous fish. Flows to be restored through development of cooperative irrigation water management projects in the basin. Anadromous $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $ 0 $ 0 $ 0
702 200728700 Delivering Reliable Fish Passage Information for Hydrosystem Management Federal Pacific Northwest National Laboratory New Mainstem/Systemwide Systemwide Provide a unified interface and oversight for the functions previously performed by the Fish Passage Center (FPC) and create a process to provide detailed technical analyses including peer review. Anadromous $537,283 $497,028 $507,119 $537,283 $497,028 $507,119 $ 0 $ 0 $ 0
705 200728800 Touchet Eastside and Westside Irrigation District Piping SWCD Walla Walla County Soil & Water Conservation District (SWCD) New Columbia Plateau Walla Walla Improve passage for adult mid-Columbia steelhead returning to the Touchet R. headwater spawning area by increasing instream flows in the lower mainstem. This will be accomplished by converting from open ditch to piped conveyance on 2 irrigation districts Anadromous $16,852 $492,830 $490,318 $16,852 $492,830 $490,318 $ 0 $ 0 $ 0
711 200729100 Developing and Assessing Freshwater Mussel Distribution, Abundance and Life History Survey Methods in the Columbia Basin in Washington. State Washington Department of Fish and Wildlife (WDFW) New Columbia Cascade Okanogan We propose to conduct a pilot survey of freshwater mussels in a subdrainage of the Columbia River to develop methods to collect data necessary for sound management and to gain experience at conducting such surveys for likely future work. Resident $55,330 $ 0 $ 0 $55,330 $ 0 $ 0 $ 0 $ 0 $ 0
712 200729200 Effectiveness Monitoring of In-Stream Habitat Restoration in the Lower Entiat Basin at Microhabitat and Reach Scales Federal US Forest Service (USFS) - Pacific Northwest Research Station New Columbia Cascade Entiat We will use techniques from population ecology at the microhabitat and reach scale to monitor the response of juvenile fish populations to restoration of rearing habitat. Anadromous $63,973 $61,558 $ 0 $63,973 $61,558 $ 0 $ 0 $ 0 $ 0
713 200729300 Umatilla River Basin Stream Temperature Monitoring Tribe Confederated Tribes of the Umatilla Indian Reservation New Columbia Plateau Umatilla CTUIR Water Resources Program will monitor stream temperatures in the Umatilla River Basin at 31 long term monitoring sites. Anadromous $23,267 $25,805 $26,404 $23,267 $25,805 $26,404 $ 0 $ 0 $ 0
714 200729400 Control of BKD by Inactivation of the Renibacterium salmoninarum Sortase Enzyme as an Alternative to Antibiotics Federal Northwest Fisheries Science Center New Mainstem/Systemwide Systemwide This proposal describes research to determine if the sortase gene product of Renibacterium salmoninarum can be a target for therapeutic drugs against Bacterial Kidney Disease of salmon. Anadromous $223,694 $238,875 $251,359 $223,694 $238,875 $251,359 $ 0 $ 0 $ 0
715 200729500 Crow Creek BPA Powerline Channel Restoration Project Federal US Forest Service: Lolo National Forest New Mountain Columbia Clark Fork This project will focus on restoring approximately 1/2 mile of Crow Creek to a more proper functioning channel. Work will include extensive revegetation, reconstruction of the channel to more natural conditions, and addition of habitat structures. Resident $50,000 $ 0 $ 0 $50,000 $ 0 $ 0 $ 0 $ 0 $ 0
717 200729600 IDL Clearwater Area Fish Passage State Idaho Department of Lands New Mountain Snake Clearwater This project involves the replacement of fish barrier culverts with fish passable bridges. This will make available existing fish habitat. Anadromous $63,500 $138,100 $ 0 $63,500 $138,100 $ 0 $ 0 $ 0 $ 0
718 200729700 Effect of Elevated Water Temperature and Gas Supersaturation on Bull Trout Reproduction and Growth. Federal Abernathy Fish Tech. Center New Mainstem/Systemwide Systemwide This project seeks to determine the effect of sublethal stress on growth and reproduction of bull trout. This project will fill a data gap concerning the effect of environmental stress on bull trout performance and individual fitness. Resident $138,396 $157,998 $158,158 $138,396 $157,998 $158,158 $ 0 $ 0 $ 0
720 200729900 Investigation of the Relative Reproductive Success of Stray Hatchery and Wild Steelhead and the Influence of Hatchery Strays on Natural Productivity in the Deschutes River Subbasin State Oregon Department of Fish & Wildlife (ODFW) New Columbia Plateau Deschutes We propose to determine the number of stray hatchery steelhead entering Bakeoven and Buck Hollow creeks, degree of introgression between hatchery and natural fish, relative reproductive success, and the influence of hatchery fish on natural productivity. Anadromous $466,730 $409,178 $395,072 $466,730 $409,178 $395,072 $ 0 $ 0 $ 0
721 200730000 Fish Passage Technical Services Project Tribe Columbia River Inter-Tribal Fish Commission (CRITFC) New Mainstem/Systemwide Systemwide Staff central analytical group to provide technical support to state and federal fishery managers. Anadromous $1,555,069 $1,602,717 $1,651,390 $1,555,069 $1,602,717 $1,651,390 $ 0 $ 0 $ 0
726 200731100 Acquire Land to Protect Critical Habitat in the Upper Lochsa Tribe Nez Perce Tribe DFRM Watershed Division New Mountain Snake Clearwater This proposal seeks to protect the critical habitat in the upper Lochsa by working with the Rocky Mountain Elk Foundation to aquire 40,640 acres of land at risk of development. Anadromous $10,020,800 $10,400 $ 0 $10,020,800 $10,400 $ 0 $ 0 $ 0 $ 0
727 200731200 Albeni Falls Dam Operational Loss Assessment of Riparian Ecological Function in the Pend Oreille River Ecosystem Tribe Kalispel Tribe New Intermountain Pend Oreille Assess the operational loss of Pend Oreille River floodplain ecological functions and processes from Albeni Falls Dam. Wildlife $364,021 $403,888 $344,920 $364,021 $403,888 $344,920 $ 0 $ 0 $ 0
728 200731300 Expanded Acquisition and Display of Fish (Initially Anadromous Salmonids) Harvest Data in the StreamNet Database Federal Pacific States Marine Fisheries Commission (PSMFC) New Mainstem/Systemwide Systemwide Locate data sources for marine and freshwater sport and commercial harvests, including hatchery contribution rates to fisheries and percentages of hatchery fish straying onto natural spawning grounds. Build a comprehensive database schema to store data. Anadromous $148,844 $156,287 $164,201 $148,844 $156,287 $164,201 $ 0 $ 0 $ 0
731 200731400 Regional Consolidation of Habitat Restoration Project Information From Multiple Funding Sources with Dissemination Through the StreamNet Website Federal Pacific States Marine Fisheries Commission (PSMFC) New Mainstem/Systemwide Systemwide Detailed information on habitat restoration projects is maintained by the multiple sources of project funding, but there is currently no way to review consolidated information in a common format. This will obtain data across agencies and disseminate. All $238,514 $250,440 $262,964 $238,514 $250,440 $262,964 $ 0 $ 0 $ 0
732 200731500 Camas Slough/Lower Washougal River Realignment NPO Lower Columbia Fish Enhancement Group New Lower Columbia Washougal This proposal is to conduct a feasibility study on the potential to block off the upper end of Camas Slough and reroute the Lower Washougal directly to the Columbia. This will reduce salmon mortality due to high temperatures and high predation levels. Anadromous $160,000 $ 0 $ 0 $160,000 $ 0 $ 0 $ 0 $ 0 $ 0
733 200731600 McKenzie Canyon Irrigation Project NPO Deschutes River Conservancy New Columbia Plateau Deschutes The Deschutes River Conservancy, Three Sisters Irrigation District, Upper Deschutes Watershed Council and the Deschutes Soil and Water Distirct propose to restore instream habitat and flows in Squaw Creek to benefit ESA listed steelhead and bull trout. Anadromous Capitalize pipeline installation None $2,460,000 $2,460,000 $30,000 $2,460,000 $2,460,000 $30,000 $ 0 $ 0 $ 0
736 200731800 Entiat River - UPA - Knapp-Wham Hanan Detwiler Irrigation System Consolidation Project. SWCD Chelan County Conservation District (SWCD) New Columbia Cascade Entiat Consolidation of the Knapp-Wham and Hanan Detwiler irrigation systems will eliminate partial fish passage barriers associated with 2 surface water diversions, add instream habitat within the lower Entiat River, and enhance instream flows via water saved Anadromous $364,077 $9,313 $ 0 $364,077 $9,313 $ 0 $ 0 $ 0 $ 0
737 200731900 WRIA-Based Restoration Project Feasibility Assessment and Prioritization, Kalama River NPO Lower Columbia Fish Enhancement Group New Lower Columbia Kalama Conduct assessment of Tier 1 & 2 reaches in Kalama basin to identify/develop site-specific restoration projects to address limiting factors. Projects will be ranked & prioritized based on geomorphic, biologic, land ownership, and cost factors. Anadromous $165,000 $20,000 $ 0 $165,000 $20,000 $ 0 $ 0 $ 0 $ 0
738 200732000 Inventory and Assess Fish Passage and Screening Needs in the Willow Creek Watershed SWCD Morrow County Soil & Water Conservation District (SWCD) New Columbia Plateau Umatilla This project proposes to conduct an inventory and assessment of fish passage and screening needs in the Willow Creek watershed necessary to restore summer steelhead (extinct) access to historic spawning and rearing habitat and improve access and movement Anadromous $28,854 $28,307 $34,430 $28,854 $28,307 $34,430 $ 0 $ 0 $ 0
739 200732100 CBFWA Fish Passage Technical Services NPO Columbia Basin Fish & Wildlife Authority (CBFWA) New Mainstem/Systemwide Systemwide This project will collect, analyze, manage, store & disseminate data on the passage characteristics of juvenile & adult salmonids within the FCRPS & provide a central staff analytical group to provide technical support to state & federal fishery managers. All $1,531,414 $1,531,414 $1,531,414 $1,531,415 $1,531,415 $1,531,415 $- 1 $- 1 $- 1
740 200732200 Ecosystem Economics Model for Willamette Basin Restoration and Conservation Private David Evans and Associates, Inc. New Lower Columbia Willamette This project will develop an system dynamics model of the Willamette Basin to map the ecosystem benefits of restoration and conservation scenarios and their associated economic value. Anadromous $425,919 $143,650 $ 0 $425,919 $143,650 $ 0 $ 0 $ 0 $ 0
741 200732300 Investigate genetic parentage analysis techniques to estimate spawner abundance in ESA-listed steelhead populations State Idaho Department of Fish & Game New Mountain Snake Clearwater Investigate the feasibility of sampling juvenile steelhead and using parentage analysis techniques to estimate the number of steelhead spawners in rivers. Anadromous $406,964 $422,191 $438,030 $406,964 $422,191 $438,030 $ 0 $ 0 $ 0
770 200732500 UPA Wenatchee Subbasin Complexity Proposal NPO Chelan County Natural Resources Department New Columbia Cascade Wenatchee Five potential complexity projects are being proposed for funding to benefit Upper Columbia spring Chinook, steelhead and bull trout. Funds are also requested for unidentified potential complexity projects to assist in meeting UPA metric goals. Anadromous $3,125,180 $3,125,180 $ 0 $3,125,180 $3,125,180 $ 0 $ 0 $ 0 $ 0
753 200732600 Monitoring of juvenile and adult salmonid survival through the Federal Columbia River Power System State Washington Department of Fish and Wildlife (WDFW) New Mainstem/Systemwide Systemwide This project will collect, analyze, mange, store, and disseminate data on the survival of juvenile and adult salmonids within the Federal Columbia River Power System. These were duties formerly provided by the Fish Passage Center. Anadromous $1,622,780 $1,679,576 $1,738,338 $1,622,780 $1,679,576 $1,738,338 $ 0 $ 0 $ 0
754 200732700 Compilation of Location-Specific Hatchery Release Data in Consistent Format Across Agencies by StreamNet Federal Pacific States Marine Fisheries Commission (PSMFC) New Mainstem/Systemwide Systemwide Detailed fish liberation data for anadromous and resident fish species will be developed from multiple agencies. The data will show detailed release location information (not "rolled up") and posted through the StreamNet online database query system. Anadromous $192,720 $202,356 $212,474 $192,720 $202,356 $212,474 $ 0 $ 0 $ 0
830 200733000 Gardena Farms Irrigation District Irrigation Efficiency and Instream Flow Project Irrig.Dist. Gardena Farms Irrigation Distirct New Columbia Plateau Walla Walla The purpose of this proposal is to place open channel irrigation deliveries in closed pipe and return the savings to the Walla Walla River as instream flow. Conserved water would be returned to the Walla Walla River at the Gardena Farms diversion. Anadromous $362,084 $362,083 $362,333 $362,084 $362,083 $362,333 $ 0 $ 0 $ 0
761 200733200 Mitigation of marine-derived nutrient loss in the Boise-Payette-Weiser subbasin. State Idaho Department of Fish & Game New Middle Snake Payette The project replaces marine derived nutrients using salmon carcasses and salmon carcass analogs in the Boise-Payette-Weiser subbasins. Aquatic and terrestrial effects of nutrient treatements will be monitored using isotope and lipid analysis. Resident $351,037 $360,084 $367,509 $351,037 $360,084 $367,509 $ 0 $ 0 $ 0
762 200733300 Timing and survival of PIT tagged juvenile fall Chinook from the Hanford Reach. Tribe Columbia River Inter-Tribal Fish Commission (CRITFC) New Columbia Plateau Columbia Lower Middle [left blank] Anadromous $151,659 $148,120 $151,214 $151,659 $148,120 $151,214 $ 0 $ 0 $ 0
771 200733500 Migration and homing ecology of supplemented and wild spring Chinook salmon. Federal Northwest Fisheries Science Center New Columbia Plateau Yakima Determine the spatial and temporal patterns of homing and spawning by wild and hatchery-reared salmon released from supplementation facilities and examine the physiological changes in the olfactory system during imprinting. Anadromous $395,168 $420,483 $426,565 $395,168 $420,483 $426,565 $ 0 $ 0 $ 0
772 200733600 Effects of short-term flow fluctuations on salmon migration Federal Oak Ridge National Laboratory New Mainstem/Systemwide Systemwide Research will determine if short-term flow fluctuations affect juvenile salmonid migration through the Snake River. Anadromous $129,646 $164,968 $188,194 $129,646 $164,968 $188,194 $ 0 $ 0 $ 0
774 200733700 Oregon Plan Monitoring of Steelhead Status, Trend, and Habitat in the Grande Ronde River Subbasin. State Oregon Department of Fish & Wildlife (ODFW) New Blue Mountain Grande Ronde Implementation of Oregon Plan, EMAP monitoring for basin-wide steelhead status and trend. Anadromous $372,361 $388,549 $405,339 $372,361 $388,549 $405,339 $ 0 $ 0 $ 0
777 200734000 A multidisciplinary collaborative approach to aquatic habitat monitoring & evaluation in the Walla Walla Subbasin NPO Walla Walla Basin Watershed Council New Columbia Plateau Walla Walla This project monitors and evaluates aquatic habitat conditions in the Walla Walla Subbasin using stream, surface water, and groundwater performance metrics. It complements BPA proposal: Walla Walla Subbasin Collaborative Salmonid Monitoring & Evaluation Anadromous $275,000 $284,800 $297,200 $275,000 $284,800 $297,200 $ 0 $ 0 $ 0
779 200734200 IDL Maggie Cr. Area Fish Passage Proposal State Idaho Department of Lands New Mountain Snake Clearwater This proposal seeks to replace fish passage blocking culverts with fish passage structures. This will increase the quantity of available suitable fish habitat. Anadromous $210,000 $220,000 $200,000 $210,000 $220,000 $200,000 $ 0 $ 0 $ 0
780 200734300 A Proposal to Expand Current Juvenile Salmonid Monitoring in the Columbia Estuary Province to Meet the Monitoring Needs Identified in the Lower Columbia Salmon Recovery and Subbasin Plan. State Washington Department of Fish and Wildlife (WDFW) New Columbia Estuary Elochoman This proposal addresses the in-depth juvenile monitoring gaps identified from the LCFRB (2004) plan at the Level 3 or least intensive level, and builds on the existing juvenile salmonid monitoring program in Washington's Lower Columbia River domain. Anadromous $292,300 $156,604 $162,463 $292,300 $156,604 $162,463 $ 0 $ 0 $ 0
783 200734400 Lower Columbia River Wild Coho DNA Stock Identification Proposal Private Fish Friendly Inc. New Lower Columbia None Selected Fish Friendly Incorporated (FFI) in cooperation with the Washington Department of Fish and Wildlife (WDFW) proposes to develop a DNA baseline for naturally produced coho salmon in the Lower Columbia River tributaries. Anadromous $111,625 $105,625 $182,182 $111,625 $105,625 $182,182 $ 0 $ 0 $ 0
784 200734500 Grande Ronde Coho Restoration Tribe Nez Perce Tribe New Blue Mountain Grande Ronde This proposal is to initiate the Council 3-Step Review Process for new production initiatives for the Northeast Oregon Hatchery Coho Salmon Master Plan Grande Ronde River. Anadromous $154,375 $413,123 $263,239 $154,375 $413,123 $263,239 $ 0 $ 0 $ 0
785 200734600 Crims Island Habitat Restoration Federal US Geological Survey (USGS) - Cook New Columbia Estuary Columbia Estuary The goal of this project is to describe the response of juvenile salmonids and biological productivity to tidal marsh restoration at Crims Island in the Columbia River Estuary. Anadromous $209,080 $209,080 $209,080 $209,080 $209,080 $209,080 $ 0 $ 0 $ 0
786 200734700 IDL Ponderosa Area Fish Passage State Idaho Department of Lands New Mountain Snake Clearwater This project involves the replacement of fish barrier culverts with fish passable stream crossing structures. Resident $101,400 $14,000 $ 0 $101,400 $14,000 $ 0 $ 0 $ 0 $ 0
790 200734900 Monitoring resident salmonid populations and the aquatic food web in the upper Icicle Creek subbasin of the Wenatchee River basin. NPO Washington Trout New Columbia Cascade Wenatchee Estimate abundance of resident rainbow, bull, and brook trout and measure benthic invertebrate community structure in conjunction with juvenile feeding ecology to characterize basin productivity and capacity. Resident $213,404 $203,444 $203,444 $213,404 $203,444 $203,444 $ 0 $ 0 $ 0
793 200735200 Feasibility Study and Implementation of a System-wide Conservation Enforcement Web-Based Data Center Federal National Oceanic & Atmospheric Administration (NOAA) New Mainstem/Systemwide Systemwide Evaluate alternatives, plan the design, and implement a web-based conservation enforcement information center  that would maximize the accountability, effectiveness, and public awarenes of fish, wildlife & habitat law enforcement in the Columbia Basin. Anadromous $163,090 $102,290 $92,489 $163,090 $102,290 $92,489 $ 0 $ 0 $ 0
794 200735300 Quantitative and effective analysis of Columbia River Chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss) population viability. Tribe Columbia River Inter-Tribal Fish Commission (CRITFC) New Mainstem/Systemwide Systemwide We propose to do a quantitative and effective analysis of Columbia River Chinook salmon and steelhead population viability, which is a required task for conservation management of listed populations under the U.S. Endangered Species Act (ESA). Anadromous $155,531 $145,380 $145,380 $155,531 $145,380 $145,380 $ 0 $ 0 $ 0
797 200735500 Determining the Accuracy of Adult Coho Salmon Population Estimates from a Random, Spatially Balanced design using Area-Under-the-Curve State Washington Department of Fish and Wildlife (WDFW) New Lower Columbia Columbia Lower Compare accuracy of AUC and mark/recapture population estimates for coho salmon Anadromous $100,192 $83,798 $87,990 $100,192 $83,798 $87,990 $ 0 $ 0 $ 0
847 199505702 Southern Idaho Wildlife Mitigation Tribe Shoshone-Bannock Tribes Ongoing Upper Snake Snake Upper Shoshone-Bannock Tribes on-going Southern Idaho Wildife Mitigation project. Part of the CBF&W Program; and for operations and maintanance activities and habitat restoration/enhancement on Soda Springs Hills and Rudeen Ranch mitigation project Wildlife Capitalize land acquisition Land acquisition requirements $2,050,000 $2,050,000 $2,050,000 $380,000 $395,000 $395,000 $1,670,000 $1,655,000 $1,655,000
801 200735800 Estimating the detection efficiency of snorkeling for detecting anadromous salmonid parr Federal US Forest Service (USFS) - Rocky Mt Research Station New Mainstem/Systemwide Systemwide Although snorkeling is widely used to monitor anadromous salmonids, the bias and precision of snorkeling has rarely been assessed. We propose to develop sampling efficiency models to allow correction of extant and future data with systemwide application. Anadromous $342,912 $294,702 $309,731 $342,912 $294,702 $309,731 $ 0 $ 0 $ 0
803 200735900 Application and enhancement of monitoring protocols for assessing productivity and watershed condition in headwater subcatchments of the John Day subbasin Federal PNW Research Station -- Wenatchee New Columbia Plateau John Day We developed monitoring protocols for assessing watershed condition in the headwaters of the Wenatchee sub-basin and we propose to test the same techniques and evaluate the effects of landscape-scale factors in the John Day sub-basin. Anadromous $292,030 $272,938 $282,900 $292,030 $272,938 $282,900 $ 0 $ 0 $ 0
804 200736000 Columbia River/Cowlitz River Eulachon Research and Monitoring Plan (ERMP) Private Steward and Associates New Columbia Estuary Columbia Estuary The ERMP addresses critical information needs for improved management of eulachon in the Columbia River and its tributaries. This effort is consistent with sub-basin planning objectives, and anticipates needs related to a potential ESA status review. Anadromous $438,881 $410,542 $410,542 $438,881 $410,542 $410,542 $ 0 $ 0 $ 0
805 200736100 IDL St. Joe Area Fish Passage State Idaho Department of Lands New Mountain Snake Clearwater This project involves the replacement of a fish barrier culvert with a steel bridge providing fish passage. In addition two upstream culvert crossings will be removed and the stream channel reestablished. Resident $63,120 $ 0 $ 0 $63,120 $ 0 $ 0 $ 0 $ 0 $ 0
809 200736200 Assessing Fish Passage Through the Icicle Creek Boulder Field Above Leavenworth National Fish Hatchery NPO Washington Trout New Columbia Cascade Wenatchee This proposal seeks to assess fish passage through, and road-construction impacts on, the boulder field upstream from the LNFH in Icicle Creek. Study results will include an evaluation of the need for a project to improve fish passage in this reach. Anadromous $26,068 $17,378 $ 0 $26,068 $17,378 $ 0 $ 0 $ 0 $ 0
811 200736300 IDL Pend Oreille Area Fish Passage State Idaho Department of Lands New Intermountain Pend Oreille This project involves the replacement of fish barrier culverts with fish passable crossing structures. This will make available existing fish habitat. Resident $75,000 $90,000 $ 0 $75,000 $90,000 $ 0 $ 0 $ 0 $ 0
812 200736400 Determining the effects of load following on reservoir hydraulics and migration behavior of juvenile salmonids. Federal Columbia River Research Laboratory New Mainstem/Systemwide Systemwide The goal of this project is to measure the behavioral response of juvenile salmonids to load following operations in the reservoir upstream of Little Goose Dam. To fully understand this response, both hydraulic conditions in the reservo Anadromous $711,105 $760,883 $814,145 $711,105 $760,883 $814,145 $ 0 $ 0 $ 0
813 200736500 Canyon Creek Culvert Replacements Federal Malheur National Forest New Columbia Plateau John Day This project proposes to replace two culverts on Canyon Creek which are partial barriers to adult salmonids and complete barriers to juvenile salmonids and improves fish passage at one culvert on Canyon Creek without replacing the culvert. Anadromous $294,320 $36,225 $20,680 $294,320 $36,225 $20,680 $ 0 $ 0 $ 0
816 200736700 Klickitat and Rock Creek Subbasin Habitat Improvement Program State Klickitat County New Columbia Gorge Klickitat The proposal funds a program that encompasses areas within Klickitat County that are addressed in the Klickitat and Lower Middle Columbia Subbasin Plans. The program will address key habitat issues throughout the area. Anadromous $345,300 $2,107,900 $2,356,800 $602,500 $242,000 $ 0 $-257,200 $1,865,900 $2,356,800
818 200736800 Adult Coho Salmon Monitoring Proposal for the Lower Columbia Province. State Washington Department of Fish and Wildlife (WDFW) New Lower Columbia Columbia Lower This proposal addresses adult coho salmon population status monitoring in the Lower Columbia province to provide complete estimates of abundance, productivity, diversity, and spatial structure for Washingtons portion of the Lower Columbia River ESU. Anadromous $487,444 $456,502 $479,337 $487,444 $456,502 $479,337 $ 0 $ 0 $ 0
819 200736900 Protect and Restore the North Fork Clearwater Subbasin Tribe Nez Perce Tribe Dept. Fisheries Resource Management Watershed Division New Mountain Snake Clearwater Proposed restoration targets all redisdent fish species within the North Fork Drainage. The first year of restoration will occur on the Clearwater National Forest, out-year projects will include restoration projects on Federal, State, and Private Land. Resident $645,157 $645,657 $645,157 $645,157 $645,657 $645,157 $ 0 $ 0 $ 0
820 200737000 Methods of Applying Salmon Timing Mechanisms to Wild and Hatchery Fish Management Private The B. Taylor Group LLC New Columbia Gorge Columbia Gorge The migrations, feeding, spawning and other events of salmon are entrained to quantifiable and predictable natural light and dark cycles. This study will demonstrate how this phenomenon can be applied towards the more efficient management of stocks. Anadromous $110,000 $110,000 $ 0 $110,000 $110,000 $ 0 $ 0 $ 0 $ 0
821 200737100 Documentation of food-web linkages in the mainstem Columbia River  towards understanding the role of invasive species and establishing a baseline trophic state Federal Columbia River Research Laboratory New Columbia Gorge Columbia Gorge We propose to use stable isotopes to document food web linkages in the Bonneville Reservoir. We propose to determine isotopic signatures of representative trophic levels and use multi-source mixing models to quantify food web sources and pathway Resident $209,774 $232,226 $105,146 $209,774 $232,226 $105,146 $ 0 $ 0 $ 0
822 200737200 Lake Roosevelt White Sturgeon Conservation Hatchery Project Tribe Spokane Tribe New Intermountain Columbia Upper This project will coordinate progression through the NPCC three-step process with Lake Roosevelt co-managers in the development of a conservation hatchery dedicated to restoring the upper Columbia River white sturgeon in the Transboundary Reach. Resident $ 0 $250,000 $250,000 $ 0 $250,000 $250,000 $ 0 $ 0 $ 0
823 200737300 IDL Priest Lake Fish Passage State Idaho Department of Lands New Intermountain Pend Oreille This project involves the replacement of fish barrier culverts with fish passable structures. This will make available existing fish habitat. Resident $55,100 $53,320 $ 0 $55,100 $53,320 $ 0 $ 0 $ 0 $ 0
831 200737400 Investigating Juvenile Salmonid Mortality Associated with Lock Flushing NPO bluefish.org New Mainstem/Systemwide Systemwide To date, it appears that no one has considered mortality of juvenile salmonid through the FCRPS via lock passage. This proposal seeks to address this gap in our understanding of juvenile salmonid mortality through a lockage. Anadromous $10,000 $ 0 $ 0 $10,000 $ 0 $ 0 $ 0 $ 0 $ 0
832 200737500 Does the Decline of Idahos Sockeye Salmon Correlate with a Mountain Beetle Infestation? NPO bluefish.org New Upper Snake Snake Headwaters This proposal aims to study the nurtient recycling question: Does the decline of Idahos Sockeye contribute to ecosystem stress in the upstream habitat where their marine-derived nutrients were historically deposited? Wildlife $10,000 $ 0 $ 0 $10,000 $ 0 $ 0 $ 0 $ 0 $ 0
834 200737700 Cooler Temperatures for Federally Controlled Reservoirs NPO bluefish.org New Mainstem/Systemwide Systemwide An investigation is proposed to consider the biological and economic attributes of a temperature-control structure which could be installed at Idaho Powers Brownlee Dam Anadromous $10,000 $ 0 $ 0 $10,000 $ 0 $ 0 $ 0 $ 0 $ 0
835 200737800 Investigating Reservoir Sediment Concerns of a Restored Free-Flowing Lower Snake River NPO bluefish.org New Mainstem/Systemwide Systemwide The objective of this proposal is to reduce the uncertainty concerning reservoir sediment being redepoisted downstream, were the Lower Snake to be restored to a free-flowing river. Anadromous $10,000 $ 0 $ 0 $10,000 $ 0 $ 0 $ 0 $ 0 $ 0
836 200737900 Surveying Jobs that Depend on the Existence of Lower Snake River Reservoirs NPO bluefish.org New Mainstem/Systemwide Systemwide It is proposed here that a thorough survey be performed to investigate the current level of employment that is dependent upon the continued existence of the Lower Snake Reservoirs. Anadromous $10,000 $ 0 $ 0 $10,000 $ 0 $ 0 $ 0 $ 0 $ 0
837 200738000 Keeping Irrigators Whole in the Event of Reservoir Removal NPO bluefish.org New Mainstem/Systemwide Systemwide Proposed here is a review of ACOE plans that would allow irrigation to continue in its present state if Lower Snake Reservoirs were removed. A pipeline along the current shoreline of Ice Harbor reservoir will be considered and compared to the ACOE plan Anadromous $10,000 $ 0 $ 0 $10,000 $ 0 $ 0 $ 0 $ 0 $ 0
838 200738100 Lower Columbia Fish Enhancement Group Community-Based Multi-Sub-Basin Habitat Restoration Program NPO Lower Columbia Fish Enhancement Group New Columbia Estuary Columbia Estuary The Lower Columbia Fish Enhancement Group seeks program-level support to expand its community-based salmon and steelhead habitat restoration program and activities directly linked to implementation of Sub-Basin and Recovery Plan Priorities. Anadromous $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $ 0 $ 0 $ 0
840 200738300 Keeping Commodity Shippers Whole in the Event of Reservoir Removal NPO bluefish.org New Mainstem/Systemwide Systemwide A study is proposed to investigate the concerns surrounding the loss of the Lower Snake Reservoir shipping channel, in the event that these reservoirs were to be removed which may be deemed necessary for the recovery of Idaho's anadromous fish. Anadromous $10,000 $ 0 $ 0 $10,000 $ 0 $ 0 $ 0 $ 0 $ 0
841 200738400 Reducing the Cost of Reservoir Removal NPO bluefish.org New Mainstem/Systemwide Systemwide A competition is proposed to engineering students where entrants will consider the costs associated with removal of Lower Snake River dams. The breaching of these four dams may be deemed necessary for the recovery of Idaho's anadromous fish. Anadromous $10,000 $ 0 $ 0 $10,000 $ 0 $ 0 $ 0 $ 0 $ 0
842 200738500 Investigating Flood Control Benefits and Flooding Risks of Federally Controlled Lower Snake Dams NPO bluefish.org New Mainstem/Systemwide Systemwide This proposal seeks to investigate the purported flood control benefits of the Lower Snake River dams and discuss and summarize the flooding risk of these impoundments. Anadromous $10,000 $ 0 $ 0 $10,000 $ 0 $ 0 $ 0 $ 0 $ 0
843 200738600 Estimating Bonneville Power Administration Revenue Effects in the Event of Reservoir Removal NPO bluefish.org New Mainstem/Systemwide Systemwide This proposal will use power production and energy market modelling software to project revenue effects of the BPA should Lower Snake Dams be removed. The breaching of these four dams may be deemed necessary for the recovery of Idaho's anadromous fish. Anadromous $10,000 $ 0 $ 0 $10,000 $ 0 $ 0 $ 0 $ 0 $ 0
848 200738800 Fish Passage Data System (Key Functions Previously Performed by the Fish Passage Center) Federal Pacific States Marine Fisheries Commission (PSMFC) New Mainstem/Systemwide Systemwide BPA issued a solicitation in December 2005 to transfer key functions previously performed by the Fish Passage Center to be transferred to other existing and capable entities in the region with a continuity of the activities. The solicitation included thr Anadromous $890,189 $925,797 $962,828 $890,189 $925,797 $962,828 $ 0 $ 0 $ 0

Maintained by the Columbia Basin Fish & Wildlife Authority. Please direct comments or questions to the webmaster.