FY 2002 Columbia Plateau proposal 199701325

Section 1. Administrative

Proposal titleYakima/Klickitat Fisheries Project Operations and Maintenance
Proposal ID199701325
OrganizationYakama Nation (YN)
Proposal contact person or principal investigator
NameMelvin R Sampson
Mailing address151 Fort Road Toppenish WA 98948
Phone / email5098656262 / mel@yakama.com
Manager authorizing this projectMelvin R. Sampson
Review cycleColumbia Plateau
Province / SubbasinColumbia Plateau / Yakima
Short descriptionTo implement and test supplementation-based measures in order to increase natural production and harvest opportunities. Supplementation measures will be evaluated using a systematic, experimental program. Test feasibility of coho reintroduction.
Target speciesSpring Chinook, Fall Chinook, Coho, and Steelhead
Project location
LatitudeLongitudeDescription
46.2093 -119.7542 Prosser Hatchery
46.3325 -120.4772 Marion Drain Hatchery
47.18 -120.9777 Cle Elum Supplementation and Research Facility
46.2093 -119.7542 Prosser Steelhead Kelt Reconditioning Facility
46.8893 -121.0063 Lost Creek Coho Acclimation Facility
46.6393 -120.6068 Stiles Pond Coho Acclimation Facility
47.1803 -120.9707 Hatchery Slough Coho Acclimation Facility
47.2317 -121.17 Easton Coho Acclimation Facility
47.1015 -120.72 Clark Flat Spring Chinook Acclimation Facility
47.2317 -121.17 Easton Spring Chinook Acclimation Facility
47.3248 -120.8505 Jack Creek Spring Chinook Acclimation Facility
46.7393 -120.4582 Roza Adult Broodstock Collection Facility
46.2073 -119.7722 Prosser Broodstock Collection Facility
Reasonable and Prudent Alternatives (RPAs)

Sponsor-reported:

RPA

Relevant RPAs based on NMFS/BPA review:

Reviewing agencyAction #BiOp AgencyDescription

Section 2. Past accomplishments

YearAccomplishment
Lower Yakima River Supplementation and Research Facilities Prosser Facility
1994 Constructed three acclimation ponds for fall chinook. The site consisted of three 150 x50x5 feet lined ponds. Designed and installed river and well water delivery on Bureau of Reclamation land in Prosser.
1996 Designed and installed shop/incubation building at Prosser facility.
1999 Replaced pond liners, installed water chiller for incubation, and installed bird netting over acclimation ponds.
2000 Added back-up generator, freezer, spawning area, sixteen additional raceways, gravity flow water supply, and four circular rearing vessels to Prosser facility.
94-01 Acclimated and released fall chinook from Little White Salmon Hatchery. Acclimation consists of hauling fry to the ponds rearing the fry until the smolt stage and releasing to the Yakima river.
95-01 Captured in basin fall chinook brood stock from Chandler Dam. Held adults until ripe and spawned. Incubated eggs and reared offspring for YKFP experimental design needs. Released smolts to the Yakima River.
97-01 Captured in basin coho brood stock from Chandler Dam. Held adults until ripe and spawned. Incubated eggs and reared offspring for YKFP experimental design needs. Transported juveniles to acclimation sites and released smolts to the Yakima Basin.
99-01 Captured spawned steelhead kelts at Chandler Juvenile Facility reared for eight months and released to the Yakima river to allow for second spawn
Marion Drain Facility
1995 Constructed two acclimation ponds for Marion Drain fall chinook. The site consisted of lined ponds with river water and well water supplies on Tribal land in Toppenish.
1996 Designed and installed fish wheel to trap local broodstock from Marion Drain.
1998 Installed four portable raceways, back-up generator, incubation facility, and electrical building, and renovated home for an on site care taker at the Marion Drain Facility
95-01 Captured in basin brood stock from Marion Drain with seine nets and a specially designed fish wheel. Held adults until ripe and spawned. Incubated eggs and reared offspring for YKFP experimental design needs. Released smolts to the Yakima River.
Coho Acclimation Facilities
94-97 Acclimated and released coho from Roza Wasteway #3 located in Buena.
94-96 Acclimated and released coho from Granger Pond
94-95 Acclimated and released coho from Wapato canal net pens
96-98 Acclimated and released coho from Greenway Ponds near Yakima.
97-01 Acclimated and released coho from Lost Creek acclimation facility on the Naches River.
1998 Acclimated and released coho from Lukehart Ponds in Gleed
99-00 Acclimated and released coho from Jack Creek Acclimation Facility
99-01 Acclimated and released coho from Stiles Pond near Naches
99-01 Acclimated and released coho from Cle Elum Slough adjacent to the Cle Elum Hatchery
00-01 Acclimated and released coho from Easton Ponds near Easton in the Upper Yakima River
Additional Projects
94-97 Acclimated and released fall chinook from Hanford K-Basin net pens
95-01 Sturgeon feasibility rearing at Hanford and Marion Drain Facility
Spring Chinook
1997 First holding and spawning of wild stock at Cle Elum Facility
1998 Rearing of the 97 brood; holding and spawning of the 98 Brood at Cle Elum Facility
1999 Rearing of the 98 brood, holding and spawning of the 99 Brood at Cle Elum Facility
1999 1999 Rearing and Releasing 97 brood at Clark Flat Acclimation Site Rearing and Releasing 97 Brood at Easton Acclimation Site
2000 Releasing 98 brood at Clark Flat Acclimation Site. Rearing and Releasing 98 Brood at Easton Acclimation Site Rearing and Releasing 98 Brood at Jack Creek Acclimation Site Rearing 99 brood, and holding and spawning the 2000 brood at the Cle Elum Facility.
2001 Rearing and Releasing 99brood at Clark Flat Acclimation Site Rearing and Releasing 99 Brood at Easton Acclimation Site Releasing 99 brood at Jack Creek Acclimation Site Rearing 2000 brood, and holding and spawning the 2001 brood at the Cle Elum Facility

Section 3. Relationships to other projects

Project IDTitleDescription
198812025 Yakima/Klickitat Fisheries Project Mgmt. Core Management/Admin. Support Services for all YKFP Tasks
9506404 Policy/Tech. involvement/planning YKFP Supports the required co-manager process for the YKFP
199701325 YKFP Operation and Maintenance for the Yakima River Subbasin, submitted April 2001 This management proposal (198812025) supports O & M of YKFP fish production facilities in the Yakima Subbasin..
198811525 YKFP Design and Construction for the Yakima River Subbasin, submitted April 2001. This management proposal (198812025) supports YKFP design and construction projects/activities in the Yakima Subbasin.
199506325 YKFP Monitoring and Evaluation for the Yakima Subbasin, submitted April 2001. This management proposal (198812025) provides supports YKFP monitoring and evaluation activities in the Yakima Subbasin.
199506404 YKFP Policy/Technical Involvement and Planning for WDFW 199506404 provides for WDFW participation in YKFP planning and management activities. WDFW is the project sponsor.
199705000 Little Naches Riparian and In-Channel Habitat Enhancement Enhance and restore the degraded riparian and habitat conditions in the Little Naches River by re-vegetating eroding banks and unstable channnels, restricting vehiculartraffic in the flodplain and enhancing habitat by placement of trees and boulders
199705100 Yakima Side Channel Protect, restore, and re-establish access to productive off-channel rearing habitats, protected and reconnected flodplains associated with mainstem Yakima and Naches Rivers.
199803300 Upper Toppenish Watershed assessment suggests that land use in the forest and rangelands of the Toppenish Creek watershed has altered the flow regime of the creek. Project activities are designed to moderate runoff patterns in Toppenish Creek by increasing the
199803400 Reestablish Safe Access into Tributaries of the Yakima Subbasin. Restore access to productive tributary habitat through consolidation of irrigation diversions, construction of fishways and installation of screens. Protect and restore a liited amount of habitat through fencing and re-vegation.
199901300 Ahtanum Creek Watershed Assessment Habitat restoration and monitoring in the irrigated reach of Ahtanum Creek of the Yakima Subbasin, with emphasis upon the restoration of steelhead populations
199705300 Toppenish-Simcoe Instream Flow Restoration and Assessment Habitat restoration and monitoring in irrigated reaches of Toppenish and Simcoe Creeks of the Yakima Subbasin, with emphasis upon the restoration of steelhead populations
199603501 Satus Watershed Restoration a. Collect, transport and hold spring chinook Broodstock
9506424 YKFP/WDFW Supplementation Monitoring Activities WDFW M & E activities related to ongoing supplementation experiments conducted by the YKFP. in M E proposal

Section 4. Budget for Planning and Design phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2002 costSubcontractor
N/A -- See proposal #198811525 for YKFP Planning and Design objectives, tasks and budgets for the Yakima Subbasin. N/A $0
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
N/A $0
Outyear budgets for Planning and Design phase

Section 5. Budget for Construction and Implementation phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2002 costSubcontractor
N/A -- See proposal #198811525 for YKFP Construction and Implementation objectives, tasks and budgets. N/A $0
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
N/A $0
Outyear budgets for Construction and Implementation phase

Section 6. Budget for Operations and Maintenance phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2002 costSubcontractor
1. Operate and maintain Prosser Hatchery consistent with the Annual Operation Plan. a. Collect, transport and hold fall chinook and coho broodstock. 12 months $721,123
b. spawn broodstock $0
c. Incubate eggs collected $0
d. Rear juveniles $0
e. Transport, acclimate and release $0
2. Operate and maintain Marion Drain Hatchery consistent with the Annual Operation Plan. a. Collect, transport and hold fall chinook broodstock. 9 months $173,706
b. spawn broodstock $0
c. Incubate eggs collected $0
d. Rear juveniles $0
e. Transport, acclimate and release $0
3. Operate and maintain Cle Elum Supplementation and Research Facility consistent with the Annual Operation Plan.. a. Collect, transport and hold spring chinook Broodstock b. spawn broodstock c. Incubate eggs collected d. Rear juveniles e. Transport, acclimate and release f. Operation of the adult spawning channel $1,407,194
4. Operate and maintain Steelhead Kelt Reconditioning Facilities consistent with the Annual Operation Plan.. a. Capture steelhead kelts at Chandler Juvenile Counting Facility. 10 months $19,650
b. Recondition kelts at Prosser Facility from March-December. c. Release steelhead from Prosser Facility in December. $0
5. Operate and maintain Lost Creek Coho Acclimation Facility consistent with the Annual Operation Plan.. a. Rear yearling coho from March-May. 3 months $19,201
b. Release coho smolts in May. $0
6. Operate and maintain Stiles Pond Coho Acclimation Facility consistent with the Annual Operation Plan.. a. Rear yearling coho from March-May. 3 months $19,201
b. Release coho smolts in May. $0
7. Operate and maintain Hatchery Slough Coho Acclimation Facility consistent with the Annual Operation Plan.. a. Rear yearling coho from March-May. 3 months $19,201
b. Release coho smolts in May. $0
8. Operate and maintain Easton Coho Acclimation Facility consistent with the Annual Operation Plan.. a. Rear yearling coho from March-May. 3 months $19,201
b. Release coho smolts in May. $0
9. Operate and maintain Easton Spring Chinook Acclimation Facility consistent with the Annual Operation Plan.. a. Rear yearling Spring Chinook Salmon b. Release yearlings over a 3 month period. 4 months $44,032
10. Operate and maintain Clark Flat Spring Chinook Acclimation Facility consistent with the Annual Operation Plan.. a. Rear yearling Spring Chinook Salmon b. Release yearlings over a 3 month period. 4 months $44,032
11. Operate and maintain Jack Creek Spring Chinook Acclimation Facility consistent with the Annual Operation Plan.. a. Rear yearling Spring Chinook Salmon b. Release yearlings over a 3 month period. 4 months $44,032
12. Operate and maintain Roza Broodstock Collection Facility consistent with the Annual Operation Plan.. N/A -- See proposal #199506325 for YKFP M & E objectives, tasks and budgets. 5 months $0
13. Operate and maintain Prosser Broodstock Collection Facility consistent with the Annual Operation Plan.. a. Operate the adult steep pass trap at the right bank of Prosser Dam for coho and fall chinook broodstock collection from September-November. 3 months $19,201
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
1. Operate and maintain Prosser Hatchery consistent with the Annual Operation Plan. 2003 2006 $3,162,074
2. Operate and maintain Marion Drain Hatchery consistent with the Annual Operation Plan. 2003 2006 $786,028
3. Operate and maintain Cle Elum Supplementation and Research Facility consistent with the Annual Operation Plan.. 2003 2006 $6,273,642
4. Operate and maintain Steelhead Kelt Reconditioning Facilities consistent with the Annual Operation Plan.. 2003 2006 $182,135
5. Operate and maintain Lost Creek Coho Acclimation Facility consistent with the Annual Operation Plan.. 2003 2006 $129,645
6. Operate and maintain Stiles Pond Coho Acclimation Facility consistent with the Annual Operation Plan.. 2003 2006 $129,645
7. Operate and maintain Hatchery Slough Coho Acclimation Facility consistent with the Annual Operation Plan.. 2003 2006 $129,645
8. Operate and maintain Easton Coho Acclimation Facility consistent with the Annual Operation Plan.. 2003 2006 $129,645
9. Operate and maintain Easton Spring Chinook Acclimation Facility consistent with the Annual Operation Plan.. 2003 2006 $199,275
10. Operate and maintain Clark Flat Spring Chinook Acclimation Facility consistent with the Annual Operation Plan.. 2003 2006 $199,275
11. Operate and maintain Jack Creek Spring Chinook Acclimation Facility consistent with the Annual Operation Plan.. 2003 2006 $199,275
12. Operate and maintain Roza Broodstock Collection Facility consistent with the Annual Operation Plan.. 2003 2006 $0
13. Operate and maintain Prosser Broodstock Collection Facility consistent with the Annual Operation Plan.. 2003 2006 $86,895
Outyear budgets for Operations and Maintenance phase
FY 2003FY 2004FY 2005FY 2006
$2,936,264$3,081,827$3,234,668$3,395,151

Section 7. Budget for Monitoring and Evaluation phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2002 costSubcontractor
N/A -- See proposal #199506325 for YKFP M & E objectives, tasks and budgets. N/A $0
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
N/A $0
Outyear budgets for Monitoring and Evaluation phase

Section 8. Estimated budget summary

Itemized budget
ItemNoteFY 2002 cost
Personnel FTE: 19 FTE ( 6 Temp) $803,131
Fringe $142,795
Supplies $926,601
Travel $15,552
Indirect $450,546
Capital $25,000
NEPA $0
PIT tags $0
Subcontractor $19,776
Other $166,373
$2,549,774
Total estimated budget
Total FY 2002 cost$2,549,774
Amount anticipated from previously committed BPA funds$0
Total FY 2002 budget request$2,549,774
FY 2002 forecast from 2001$2,751,853
% change from forecast-7.3%
Reason for change in estimated budget

No change

Reason for change in scope

No change

Cost sharing
OrganizationItem or service providedAmountCash or in-kind
NMFS Coho/chinook Acclimation $171,000 cash
CRITFC Steelhead kelt reconditioning $95,240 cash
YN Tribal Hatcheries $38,000 cash

Reviews and recommendations

This information was not provided on the original proposals, but was generated during the review process.

Recommendation:
Fundable - no response required
Date:
Jun 15, 2001

Comment:

Fundable. This proposal covers all the YKFP's fish production activities and research facilities including: operation of the Cle Elum Supplementation and Research facility (CESRF), the Prosser Fish facility, and the Marion Drain Fish facility. The activities included are: brood stock collection, spawning, incubation, rearing, and acclimation/release for fall and spring chinook, and coho salmon. While this proposal is more limited in details provided, the tasks are clearly listed and costs are reasonable given their duration and activities (with two exceptions noted below). Costs projected through 2006 are very similar, increasing about 10% over this period.

Concerning technical content of the proposal, the ISRP note one statement we do not agree with. Concerning brood stock spawning at the Cle Elum facility, the proposal states: "CESRF utilizes a factorial mating (minimum 2x2 crosses) design to ensure genetic diversity." (Section 2f, page 6)

Such a design cannot ensure diversity; but as described during the tour, is intended to reduce the risk of bottlenecks and reduce the rate of loss of genetic variation in the hatchery brood stock. The genetic relatedness of the brood stock is unknown so a breeding design can not ensure diversity (although it could be maximized within the parent generation through genetic screening before mating). This criticism is mainly semantic but we should avoid misleading expectations.

The two exceptions noted above are: the cost of operations for the Prosser Fish Facility (objective 1) and the basis for the Indirect cost estimate of $450,546 in Part 1, section 8. The basis for the operational costs are not provided for any of the three fish facilities in this proposal but the cost for the Prosser activities seem large and it is unclear how this is separated from the costs included in the YKFP Monitoring and Evaluation proposal. For example, both this proposal and the Monitoring and Evaluation proposal refer to the coho acclimation ponds and include costs for operations. Contract managers should be aware of these potential overlaps but as reviewers of the technical program we are unable to comment further on these activities. The Indirect costs in this proposal are large relative to the Personnel costs ... over 50% of the Personnel costs compared to 19 to 20% in other proposals. This is again a task for a contract manager.


Recommendation:
High Priority
Date:
Aug 3, 2001

Comment:


Recommendation:
Fund
Date:
Aug 10, 2001

Comment:

Fundable. This proposal covers all the YKFP's fish production activities and research facilities including: operation of the Cle Elum Supplementation and Research facility (CESRF), the Prosser Fish facility, and the Marion Drain Fish facility. The activities included are: brood stock collection, spawning, incubation, rearing, and acclimation/release for fall and spring chinook, and coho salmon. While this proposal is more limited in details provided, the tasks are clearly listed and costs are reasonable given their duration and activities (with two exceptions noted below). Costs projected through 2006 are very similar, increasing about 10% over this period.

Concerning technical content of the proposal, the ISRP note one statement we do not agree with. Concerning brood stock spawning at the Cle Elum facility, the proposal states: "CESRF utilizes a factorial mating (minimum 2x2 crosses) design to ensure genetic diversity." (Section 2f, page 6)

Such a design cannot ensure diversity; but as described during the tour, is intended to reduce the risk of bottlenecks and reduce the rate of loss of genetic variation in the hatchery brood stock. The genetic relatedness of the brood stock is unknown, so a breeding design can not ensure diversity (although it could be maximized within the parent generation through genetic screening before mating). This criticism is mainly semantic but we should avoid misleading expectations.

The two exceptions noted above are: the cost of operations for the Prosser Fish Facility (objective 1) and the basis for the Indirect cost estimate of $450,546 in Part 1, section 8. The basis for the operational costs are not provided for any of the three fish facilities in this proposal but the cost for the Prosser activities seem large and it is unclear how this is separated from the costs included in the YKFP Monitoring and Evaluation proposal. For example, both this proposal and the Monitoring and Evaluation proposal refer to the coho acclimation ponds and include costs for operations. Contract managers should be aware of these potential overlaps but as reviewers of the technical program we are unable to comment further on these activities. The indirect costs in this proposal are large relative to the personnel costs ... over 50% of the personnel costs compared to 19 to 20% in other proposals. This is again a task for a contract manager.
See detailed ISRP comments on the YKFPs.


Recommendation:
Date:
Oct 1, 2001

Comment:

Statement of Potential Biological Benefit to ESU
improve information and evaluate effectiveness of supplementation using various artificial production techniques

Comments
Funds O&M for major supplementation (study) program for YKFP. Some components of project may be broadly applicable beyond the subbasin

Already ESA Req? NO

Biop? NO


Recommendation:
Rank A
Date:
Oct 16, 2001

Comment:

See YKFP Comments: No cost-share. This project funds 42 FTE. The project incorporates the biologists and techs that perform the various duties called for in collecting and analyzing performance data that will guide the YKFP managers in adaptive management of the program. The M&E plan for the project calls for a major monitoring effort and this project is designed to fulfill this objective. As per the ISRP review, the spring chinook juvenile behavior objective should not be funded.
Recommendation:
Fund
Date:
Jan 3, 2002

Comment:


Recommendation:
Fund
Date:
Mar 6, 2002

Comment:


Recommendation:
Fund
Date:
Sep 20, 2003

Comment:

Each contract has different start dates under this one project. Sponsor prefers to have two contracts. 04 request would cover cost shares if don't come through. If cost share does come through, will reduce accordingly. Catastrophic account has been dep
Recommendation:
Date:
Sep 20, 2003

Comment:

This amount is for two projects, the Upper and Lower Operations and Maintenance
REVIEW:
NW Power and Conservation Council's FY 2006 Project Funding Review
Funding category:
expense
Date:
May 2005
FY05 NPCC start of year:FY06 NPCC staff preliminary:FY06 NPCC July draft start of year:
$2,597,942 $2,597,942 $2,597,942

Sponsor comments: See comment at Council's website