FY 2001 Intermountain proposal 200102800

Section 1. Administrative

Proposal titleEvaluation of the Banks Lake Fishery
Proposal ID200102800
OrganizationWashington Department of Fish & Wildlife (WDFW)
Proposal contact person or principal investigator
NameCasey Baldwin
Mailing address8702 N. Division St. Spokane, WA 99218
Phone / email5099212303 / baldwcmb@dfw.wa.gov
Manager authorizing this projectRay Buckley
Review cycleIntermountain
Province / SubbasinIntermountain / Lake Roosevelt
Short descriptionDetermine the abundance and ecological interactions of fish populations in Banks Lake. Identify limiting factors for naturally recruiting and hatchery supplemented fish. Provide management recommendations to maximize the fishing potential of Banks Lake.
Target specieskokanee, rainbow trout, walleye, smallmouth bass, largemouth bass, crappie, yellow perch, bluegill, burbot, whitefish
Project location
LatitudeLongitudeDescription
47.6832 -119.2883 Banks Lake
Reasonable and Prudent Alternatives (RPAs)

Sponsor-reported:

RPA

Relevant RPAs based on NMFS/BPA review:

Reviewing agencyAction #BiOp AgencyDescription

Section 2. Past accomplishments

YearAccomplishment
NA

Section 3. Relationships to other projects

Project IDTitleDescription
199104600 Spokane Tribal Hatchery (Galbraith Springs) Operation and Maintenance Determine limiting factors and contribution to the fishery for kokanee stocked into Banks Lake. Provide information on kokanee from Lake Roosevelt received through the pumping facility.
199104700 Sherman Creek Hatchery Operations and Maintenance Provide information on kokanee from Lake Roosevelt received through the pumping facility
199404300 Lake Roosevelt Fisheries Evaluation Provide information on kokanee and rainbow trout from Lake Roosevelt received through the pumping facility. Data and analysis exchange regarding ecological interactions of native and exotic species in similar and contiguous reservoir environments.
199502800 Restore Moses Lake Recreational Fishery Data and analysis exchange regarding ecological interactions of native and exotic species in similar and contiguous reservoir environments.
199500900 Rainbow Trout Net Pen Rearing Project Provide information on rainbow trout from Lake Roosevelt received through the pumping facility.
199501101 Hydroacoustic and Sonic Tracking and ADCP Velocity Mapping of Grand Coulee Dam Provide information on kokanee or rainbow from Lake Roosevelt received through the pumping facility, tagged with sonic transmitters.
200001800 Lake Roosevelt Kokanee Net Pens Provide information on kokanee and rainbow trout from Lake Roosevelt received through the pumping facility.
0 Ford Hatchery Improvement, Operation and Maintenance Determine limiting factors and contribution to the fishery for kokanee stocked into Banks Lake from the Ford hatchery.
9700400 Joint Stock Assessment Information exchange, coordination, provide data for the blocked area.

Section 4. Budget for Planning and Design phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
1. Project planning a. Detailed historical data search for all relevant information pertaining to Banks Lake. Write summary report. 1 $6,000
b. Coordinate with provincial and subbasin colleagues and other interested parties. 6 $7,000
c. Maintain contract obligations, paperwork, BPA coordination, meetings, out year planning. 6 $12,000
d. Determine feasibility and strategy for site specific sampling challenges. 3 $7,508
Hiring personnel, orientation, training. 6 $5,000
2. Experimental study design a. Write study design, scope of work, and annual report. Refine, add or modify hypothesis based on new data or assimilation of historical information. 6 $12,000
b. Collect baseline data on water quality, zooplankton, and fisheries to establish physical and biological characteristics of Banks Lake to refine study design, methods and hypothesis. 1 $48,500
3. Acquire and fabricate sampling equipment a. Make initial purchases and construct nets, set up storage, office, and other "start up" tasks 1 $72,400
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Planning and Design phase
FY 2002FY 2003FY 2004FY 2005
$22,500$15,000$10,000$10,000

Section 5. Budget for Construction and Implementation phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
Objective 1. Determine what factors limit the recruitment of hatchery-stocked kokanee and rainbow trout and panfish to the Banks Lake Fishery in order to maximize sport fishing opportunities. a. Perform offshore fisheries surveys to determine abundance and distribution of kokanee, rainbow trout, whitefish, burbot, and others using hydroacoustics, gill net, midwater trawl, and purse seine. 2 $0
b. Perform nearshore fisheries surveys to establish species composition, age structure, diet, CPUE and habitat use through electroshocking, beach seining, fyke netting, and gill netting consistent with WDFW statewide warmwater fish sampling protocol. 2 $0
c. Compare temperature and dissolved oxygen vertical profiles to fish distribution. Establish useable habitat by season for each species. 2 $0
d. Collect zooplankton from Banks Lake and establish speciation, density and biomass of preferred fish prey. 2 $0 Yes
e. Use bioenergetics modeling to quantify consumption by planktivorous species and determine carrying capacity of additional planktivore production. 2 $0
f. Determine if predation by walleye, bass, and other piscivores (pikeminnow, burbot, rainbow trout) limits recruitment of hatchery-stocked kokanee and rainbow trout and panfish. 2 $0
g. Monitor species composition and catch rates of kokanee in the pumping and irrigation systems. 2 $0
Objective 2. Evaluate the impact of summer drawdown to littoral habitat structure, productivity, and spawning success of warmwater fishes. a. Subcontract a graduate student from a University to set up and conduct experiments to measure "before and after" effects of the summer drawdown on littoral habitat type and complexity and primary and secondary productivity. 2 $0 Yes
Objective 3. Provide management recommendations for bag and slot limits, hydro operations and stocking rates, timing, and species. a. Assimilate data from Objectives 1 and 2, present to fellow managers and other interests groups, decide on actions to maximize the Banks Lake Fishery. ongoing $0
b. Design, deploy and monitor littoral habitat improvement structures in critical depth zones and targeting life stages previously determined to be limiting. ongoing $0
c. Design, deploy, and monitor aversion tactics or structures in the pumping and irrigation systems. ongoing $0
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Construction and Implementation phase
FY 2002FY 2003FY 2004FY 2005
$325,000$325,000$100,000$100,000

Section 6. Budget for Operations and Maintenance phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Operations and Maintenance phase

Section 7. Budget for Monitoring and Evaluation phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
1. Monitor change in bag and slot limits, hydro operations and stocking rates, timing, and species. a. Perform offshore fisheries surveys to determine abundance and distribution of kokanee, rainbow trout, whitefish, burbot, and others using hydroacoustics, gill net, midwater trawl, and purse seine. 2 $0
b. Perform nearshore fisheries surveys to establish species composition, age structure, diet, CPUE and habitat use through electroshocking, beach seining, fyke netting, and gill netting consistent with WDFW statewide warmwater fish sampling protocol. 2 $0
c. Compare temperature and dissolved oxygen vertical profiles to fish distribution. Establish useable habitat by season for each species. 2 $0
d. Collect zooplankton from Banks Lake and establish speciation, density and biomass of preferred fish prey. 2 $0
e. Use bioenergetics modeling to quantify consumption by planktivorous species and determine carrying capacity of additional planktivore production. 2 $0
f. Determine if predation by walleye, bass, and other piscivores (pikeminnow, burbot, rainbow trout) limits recruitment of hatchery-stocked kokanee and rainbow trout and panfish. 2 $0
g. Monitor species composition and catch rates of kokanee in the pumping and irrigation systems. 2 $0
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Monitoring and Evaluation phase
FY 2004FY 2005
$125,000$125,000

Section 8. Estimated budget summary

Itemized budget
ItemNoteFY 2001 cost
Personnel FTE: Biologist 12 mo @ $3225/mo, Research Scientist 6 mo @ $3968/mo Scientific Tech 6 mo @ $2200/mo $75,708
Fringe 25 % of salaries $18,927
Supplies computer, nets, phone services, office space, supplies $35,500
Travel 4 weeks fieldwork, 10 meetings, training, research $3,547
Indirect .235*salaries, goods and services, & travel $16,726
Capital boat and motor $15,000
NEPA $0
PIT tags $0
Subcontractor EWU (or other University): zooplankton baseline data $5,000
Other $0
$170,408
Total estimated budget
Total FY 2001 cost$170,408
Amount anticipated from previously committed BPA funds$0
Total FY 2001 budget request$170,408
FY 2001 forecast from 2000$0
% change from forecast0.0%
Reason for change in estimated budget

NA

Reason for change in scope

NA

Cost sharing
OrganizationItem or service providedAmountCash or in-kind
WDFW Moses Lake Project (/ WDFW Warmwater teams Capital equipment sharing; Electrofishing boat, truck, sampling gear $75,000 in-kind
WDFW Lake Roosevelt Project (subcontract of Lake Roosevelt Monitoring Program (199404300) Capital equipment sharing; hydroacoustic echosounder, truck, boat, sampling gear $75,000 in-kind
USBR Planning, coordination, blueprints, water data $5,000 in-kind
Other budget explanation

We are avoiding a large initial capital expense by using hydroacoustic and electrofishing equipment/boats from other BPA funded projects.


Reviews and recommendations

This information was not provided on the original proposals, but was generated during the review process.

Recommendation:
Fundable - no response required
Date:
Oct 6, 2000

Comment:

Fundable. Further ISRP response review is not needed. This is a very thorough proposal (indeed outstanding) that describes a gigantic, expensive project, which, however, looks worthwhile in terms of yielding much benefit. It seems to cover most of the bases needed for a great start, but we have a few misgivings, mentioned below. The proposal is strong on technical background, bringing basic literature to bear, and on relevance to the FWP and the subbasin plan. It has problems, though, in connecting the tasks and methods to critical tests of the hypotheses. The material is well written; few terms and thoughts need further explaining.

The emphasis of this project is to develop Banks Lake as major kokanee fishery. This may not be possible in the face of warm summer temperatures, drawdown, and entrainment. It would be better to make that assessment quickly rather than to futilely increase future stocking of kokanee.

The role of walleye is unclear. It is ignored for the most part in the proposal objectives, yet walleye have been stocked since 1992. The proposal contains vague words about increasing burbot. It lacks further discussion about attempts to understand limiting factors and management options.

The creel census that is described for the Ford Hatchery project (21021) might be more appropriate for this project.

The personnel are well qualified for the task.


Recommendation:
Recommended Action
Date:
Nov 15, 2000

Comment:

M3-Project does not directly promote/maintain sustainable and/or ecosystem processes or maintain desirable community diversity. However, data gathered through this project could be used for these purposes.

M7-This is not a habitat-oriented project but instead a project that will address abundance and ecological interactions of Banks Lake fish populations as well as identify factors limiting recruitment -move creel survey to Ford proposal


Recommendation:
Fund
Date:
Dec 1, 2000

Comment:

Fundable. This is a very thorough proposal (indeed outstanding) that describes a gigantic, expensive project, which, however, looks worthwhile in terms of yielding much benefit. It seems to cover most of the bases needed for a great start, but we have a few misgivings, mentioned below. The proposal is strong on technical background, bringing basic literature to bear, and on relevance to the FWP and the subbasin plan. It has problems, though, in connecting the tasks and methods to critical tests of the hypotheses. The material is well written; few terms and thoughts need further explaining.

The emphasis of this project is to develop Banks Lake as major kokanee fishery. This may not be possible in the face of warm summer temperatures, drawdown, and entrainment. It would be better to make that assessment quickly rather than to futilely increase future stocking of kokanee.

The role of walleye is unclear. It is ignored for the most part in the proposal objectives, yet walleye have been stocked since 1992. The proposal contains vague words about increasing burbot. It lacks further discussion about attempts to understand limiting factors and management options. The creel census that is described for the Ford Hatchery project (21021) might be more appropriate for this project. The personnel are well qualified for the task.


Recommendation:
Fund
Date:
Jan 31, 2001

Comment:


Recommendation:
Fund
Date:
Sep 11, 2001

Comment:


Recommendation:
Fund
Date:
Sep 20, 2003

Comment:

$79K moved from Ford hatchery O&M to Banks Lake per year. Ford reflects subsequent decrease.
Recommendation:
Date:
Sep 20, 2003

Comment:


REVIEW:
NW Power and Conservation Council's FY 2006 Project Funding Review
Funding category:
expense
Date:
May 2005
FY05 NPCC start of year:FY06 NPCC staff preliminary:FY06 NPCC July draft start of year:
$419,000 $419,000 $419,000

Sponsor comments: See comment at Council's website