FY 2001 Ongoing proposal 199107100

Additional documents

TitleType

Section 1. Administrative

Proposal titleSnake River Sockeye Salmon Habitat and Limnological Research
Proposal ID199107100
OrganizationShoshone-Bannock Tribes (SBT)
Proposal contact person or principal investigator
NameDoug Taki
Mailing addressP.O. Box 306 Fort Hall, ID 83203
Phone / email2082383914 / fishdept@cyberhighway.net
Manager authorizing this projectDoug Taki
Review cycleFY 2001 Ongoing
Province / SubbasinMountain Snake / Salmon
Short descriptionEnhance and monitor rearing habitat for juvenile Snake River sockeye. Evaluate the effects of nutrient addition and fish stocking on the lake's ecosystems and growth and survival of planted juvenile sockeye.
Target species
Project location
LatitudeLongitudeDescription
Reasonable and Prudent Alternatives (RPAs)

Sponsor-reported:

RPA

Relevant RPAs based on NMFS/BPA review:

Reviewing agencyAction #BiOp AgencyDescription

Section 2. Past accomplishments

YearAccomplishment
1992 Began collecting baseline physical and biological information from historic sockeye rearing lakes in the Sawtooth Valley, Idaho.
1994 Conducted fertilization experiments in limnocorral enclosures in Redfish and Alturas lakes.
1994 Established a limnological sampling protocol to monitor the effects of lake fertilization and juvenile sockeye stocking on the target lakes ecosystems.
1995 Conducted test fertilization of Redfish Lake.
1996 Removed a rough fish barrier at the outlet of Pettit Lake.
1996 Constructed a smolt/adult weir at the outlet of Pettit Lake.
1996 Began annual monitoring of sockeye smolt emigration from Pettit Lake.
1996 Began a lake fertilization program in Redfish Lake
1997 Began a lake fertilization program in Pettit and Alturas lakes.
1998 Began annual monitoring of sockeye smolt emigration from Alturas Lake.

Section 3. Relationships to other projects

Project IDTitleDescription

Section 4. Budget for Planning and Design phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
1.1 Continue extensive limnological monitoring in Redfish, Alturas, and Pettit lakes. Continue monitoring limnological parameters in Stanley Lake with a less intensive schedule. Update sampling protocol and make a new schedule. ongoing $338 Yes
1.4 Coordinate efforts with the USFS, IDFG, Idaho State Dept. of Environmental Quality. Apply for necessary permits, etc. ongoing $1,475 Yes
2. Fertilize Redfish, Pettit, and Alturas lakes. a. Review previous years data and develop lake fertilization prescriptions. ongoing $12,000 Yes
b. Apply for permit from DEQ and make schedule. ongoing $4,206
5. Continue monitoring O. nerka population characteristics and densities in the Sawtooth Valley lakes in conjunction with IDFG to determine inter-annual trends. Review and update protocols and update schedules for spawner surveys, gillnet sampling, hydroacoustics, and snorkeling. ongoing $5,324
7. Assist IDFG with in-lake captive broodstock production activities of O. nerka. Corroborate and finalize stocking strategies and field work. ongoing $5,324
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Planning and Design phase
FY 2004FY 2005FY 2002FY 2003
$33,000$34,000$29,970$31,000

Section 5. Budget for Construction and Implementation phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Construction and Implementation phase

Section 6. Budget for Operations and Maintenance phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
1.1 Continue extensive limnological monitoring in Redfish, Alturas, and Pettit lakes. Continue monitoring limnological parameters in Stanley Lake with a less intensive schedule. equipment maintenance ongoing $500 Yes
1.2. Complete winter limnological sampling to estimate sockeye salmon production opportunities and constraints during this season. equipment maintenance ongoing $500 Yes
2. Fertilize Redfish, Pettit, and Alturas lakes. c. Labor, travel, and per diem for fertilizer application. ongoing $24,894
c. Equipment maintenance and fertilizer purchase and delivery. ongoing $3,400
3. Reduce the number of mature kokanee spawning in Fishhook Creek. We will use a picket weir to reduce the number to approximately 2,000 females as identified by the TOC. a. Labor, travel, and per diem for weir operation. 4 $14,488
b. weir maintenance 4 $200
4. Enumerate sockeye smolt outmigration from Pettit and Alturas lakes. We will use a smolt collection weir and a screw trap at the outlet streams of Pettit and Alturas lakes, respectively. a. screw trap and weir maintenance ongoing $500
5. Continue monitoring O. nerka population characteristics and densities in the Sawtooth Valley lakes in conjunction with IDFG to determine inter-annual trends. a. Equipment maintenance and replacement for all surveys. ongoing $1,200
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Operations and Maintenance phase
FY 2004FY 2005FY 2002FY 2003
$61,110$62,000$49,600$54,560

Section 7. Budget for Monitoring and Evaluation phase

Task-based budget
ObjectiveTaskDuration in FYsEstimated 2001 costSubcontractor
1.1. Continue extensive limnological monitoring in Redfish, Alturas, and Pettit lakes. Continue monitoring limnological parameters in Stanley Lake with a less intensive schedule. a. Sample lakes for temperature, oxygen, nutrients (TP, NO3, TKN, NH4), chlorophyll, phytoplankton, and zooplankton. Includes travel and per diem. ongoing $37,782 Yes
b. Analyze nutrient samples. ongoing $6,144 Yes
c. Analyze chlorophyll samples. ongoing $1,024 Yes
d. Analyze phytoplankton samples. ongoing $11,616 Yes
e. Analyze zooplankton samples. ongoing $2,992 Yes
1.2. Complete winter limnological sampling to estimate sockeye salmon production opportunities and constraints during this season. a. Sample lakes for temperature, oxygen, nutrients (TP, NO3, TKN, NH4), chlorophyll, phytoplankton, and zooplankton to examine conditions for sockeye growth and survivorship under the ice. Includes travel, per diem, lodging ongoing $8,657 Yes
b. Analyze nutrient samples. ongoing $2,328 Yes
c. Analyze chlorophyll samples. ongoing $96 Yes
d. Analyze phytoplankton samples. ongoing $704 Yes
e. Analyze zooplankton samples. ongoing $552 Yes
1.3. Conduct primary productivity investigations to augment the effects of fertilization and fish stocking (ice free months 2001). Includes all sampling, analysis, and report writing. ongoing $27,000 Yes
2. Fertilize Redfish, Pettit, and Alturas lakes. b. Prepare and deliver weekly reports to DEQ. ongoing $2,730 Yes
4. Enumerate sockeye smolt outmigration from Pettit and Alturas lakes. We will use a smolt collection weir and a screw trap at the outlet streams of Pettit and Alturas lakes, respectively. Includes travel, per diem, trailer rental and labor for spring trapping season. ongoing $27,910
5. Continue monitoring O. nerka population characteristics and densities in the Sawtooth Valley lakes in conjunction with IDFG to determine inter-annual trends. a. Included in other objectives. $0
b. Estimate O. nerka stream spawner population size and sex ratio in Redfish (Fishhook Crk.), Alturas, and Stanley lakes using spawning ground surveys. Estimate spawner distribution and stream residency. Estimate fecundity for each system. ongoing $15,489
c. Estimate the total number of O. nerka in Sawtooth Valley lakes (Redfish, Alturas, Pettit, and Stanley) using hydroacoustics. Use vertical gillnets to assist in partitioning targets. Determine year class strength and mortality. ongoing $4,743
6. Determine direct and potential piscivorous fish effects on O. nerka populations in the Sawtooth Valley Lakes in conjunction with IDFG. a. Estimate potential predation and competition impacts to O. nerka by nursery lake fish community constituents by collecting stomachs from gill-netted fish. Samples will come from different time periods and lake locations ongoing $9,354
b. Identify and enumerate stomach contents. ongoing $13,333
8. Prepare and provide reports for updates and summaries for the Technical Oversight Committee. a. Limnological parameters (includes travel and per diem for meetings). ongoing $16,672 Yes
b. Fisheries parameters (includes travel and per diem for meetings). ongoing $21,178
9. Analyze all data collected and prepare annual report for the BPA, presentations for AFS (when appropriate) and manuscripts for appropriate Journals. a. Limnological parameters. Includes office supplies, telephone, etc. ongoing $44,267 Yes
b. Fisheries parameters. Includes annual office supplies, telephones, etc. and clerical support. ongoing $83,340
Outyear objectives-based budget
ObjectiveStarting FYEnding FYEstimated cost
Outyear budgets for Monitoring and Evaluation phase
FY 2004FY 2005FY 2002FY 2003
$417,049$425,390$371,702$408,872

Section 8. Estimated budget summary

Itemized budget
ItemNoteFY 2001 cost
Personnel $8,046
Fringe 30 % of salaries $2,414
Indirect 30% of salary plus fringe $3,138
Subcontractor Biolines and Ecologic, Inc. $15,069
Personnel $16,842
Fringe 30 % of salaries $5,052
Supplies $5,550
Travel includes per diem $10,920
Indirect 30% of salary plus fringe $6,568
Subcontractor Biolines $750
Personnel $96,225
Fringe 30 % of salaries $28,867
Supplies $1,900
Travel vehicles, per diem, airfare, and lodging $25,757
Indirect 30 % of salaries plus fringe $37,528
Subcontractor Biolines, Washington State Univ., Univ. of California, Davis $147,634
Other Obj. 9 includes office and clerical support for the entire year $0
$412,260
Total estimated budget
Total FY 2001 cost$412,260
Amount anticipated from previously committed BPA funds$0
Total FY 2001 budget request$412,260
FY 2001 forecast from 2000$451,000
% change from forecast-8.6%
Reason for change in estimated budget

Personnel sharing within the Department

Reason for change in scope

No change in scope

Cost sharing
OrganizationItem or service providedAmountCash or in-kind

Reviews and recommendations

This information was not provided on the original proposals, but was generated during the review process.

Recommendation:
Ongoing Funding: yes; New Funding: no
Date:
Jul 14, 2000

Comment:

The budget has been reduced due to sharing personnel within the department. There is no change in scope of work.
Recommendation:
Fund
Date:
Sep 13, 2000

Comment:


REVIEW:
NW Power and Conservation Council's FY 2006 Project Funding Review
Funding category:
expense
Date:
May 2005
FY05 NPCC start of year:FY06 NPCC staff preliminary:FY06 NPCC July draft start of year:
$455,756 $455,756 $455,756

Sponsor comments: See comment at Council's website