Proposal title | Shoshone-Bannock/Shoshone Paiute Joint Culture Facility |
Proposal ID | 199500600 |
Organization | Shoshone-Bannock Tribes (SBT) |
Proposal contact person or principal investigator |
Name | Hunter Osborne |
Mailing address | Fisheries Department, P.O. Box 306 Fort Hall, ID 83203 |
Phone / email | 2084783773 / hosborne@shoshonebannocktribes.com |
Manager authorizing this project | David C. Moser |
Review cycle | FY 2001 Ongoing |
Province / Subbasin | Upper Snake / Mainstem Snake |
Short description | Planning, development, and operation of a hatchery facility to provide native trout for re-introduction of stocks affected by hybridization, habitat loss, and exploitation on the Duck Valley and Fort Hall Reservations |
Target species | |
Year | Accomplishment |
1992 |
Feasibility study report, joint culture facilities for the resident fish substitution program on the Snake River above Hells Canyon in Idaho. CH2M Hill, Boise, ID. |
1996 |
The Shoshone-Bannock and Shoshone-Paiute Tribes master plan for the Fort Hall resident fish hatchery, Montgomery-Watson, 671 Riverpark Lane, Suite 200, Boise, ID. |
1997 |
A cultural resources survey of three proposed fish hatcheries in southeastern Idaho, Bingham and Power Counties., P.I., J.R. Galm, Short Report 534, Archaeological and Historical, Eastern Washington University. |
1998 |
Fort Hall Resident Fish Hatchery, Draft Program Verification - Biological Criteria. FishPro, Beaverton OR 97008. |
1998 |
Upper Snake River Fish Culture Facility, Environmental Assessment. DOE/EA-1213, Bonneville Power Administration, PO Box 3621, Portland, OR 97208. |
1998 |
Purchase of hatchery property (Houghland Farms). |
1999 |
Joint Culture Facility 30% design submittal. FishPro, Beaverton OR 97008. |
1999 |
Genetic Survey of Yellowstone cutthroat trout on the Fort Hall Indian Reservation (data are currently being analyzed). |
1999 |
Fee to trust title transfer of hatchery property to the Shoshone-Bannock Tribes and Shoshone-Paiute Tribes. |
2000 |
Draft Monitoring and Evaluation Plan Shoshone-Bannock/Shoshone-Paiute Joint Culture Facility. |
2000 |
Planning and Design Completed, FishPro, Beaverton OR 97008 |
Objective | Task | Duration in FYs | Estimated 2001 cost | Subcontractor |
1. Site Work |
a. Strip, Clear Grub |
1 |
$2,520 |
Yes |
1. |
b. Excavation |
1 |
$7,000 |
Yes |
1. |
c. Grading |
1 |
$13,750 |
Yes |
1. |
d. Gravel Surfacing (3/4" Crushed ) |
1 |
$19,600 |
Yes |
1. |
e. Chain link Fence |
1 |
$10,560 |
Yes |
1. |
f. Entrance Gate |
1 |
$500 |
Yes |
1. |
g. Signage |
1 |
$750 |
Yes |
1. |
h. Demolition |
1 |
$5,000 |
Yes |
2. Utilities |
a. Potable Water System |
1 |
$3,000 |
Yes |
2. |
b. Domestic Wastewater Treatment |
1 |
$25,000 |
Yes |
2. |
c. Site Electrical |
1 |
$25,000 |
Yes |
2. |
d. Communications |
1 |
$3,000 |
Yes |
3. Hatchery Building |
a. Administrative Space |
1 |
$30,975 |
Yes |
3. |
b. Production Space |
1 |
$96,700 |
Yes |
4. Feed Storage |
a. Storage Area |
1 |
$41,700 |
Yes |
5. Spawning Shelter |
a. Shelter |
1 |
$3,600 |
Yes |
6. Quarantine Building |
a. Administrative Space |
1 |
$12,150 |
Yes |
6. |
a. Production Space |
1 |
$60,500 |
Yes |
6. |
c. Driveway |
1 |
$3,360 |
Yes |
6. |
d. Aerator/Headtank (50gpm) |
1 |
$2,500 |
Yes |
6. |
e. Drain Piping (4") |
1 |
$2,000 |
Yes |
7. Residence |
a. 980 SF Mobile |
1 |
$35,000 |
Yes |
8. Raceways |
a. FRP Raceways (6'x40') |
1 |
$87,500 |
Yes |
8. |
b. Predation Control (67'x96') |
1 |
$57,888 |
Yes |
9. Intermediate Raceways |
a. FRP Intermediate Raceways (4'x16') |
1 |
$49,500 |
Yes |
9. |
b. Cover (Fabric and Frame, 45'x50') |
1 |
$33,750 |
Yes |
10. Process Water Treatment and Distribution |
a. Process Piping |
1 |
$63,725 |
Yes |
10. |
b. Aerator/Headtank - Hatch Building (900 gpm) |
1 |
$20,000 |
Yes |
10. |
c. Aerator/Headtank - Raceways (1400 gpm) |
1 |
$15,000 |
Yes |
11. Effluent Treatment System |
a. Cleaning Waste Piping |
1 |
$20,400 |
Yes |
11. |
b. 12' x 12' Building |
1 |
$8,640 |
Yes |
11. |
c. 4' x 4' Drum Filter Unit with Controls |
1 |
$35,000 |
Yes |
11. |
d. 4" Pipe to Storage Pond |
1 |
$600 |
Yes |
11. |
e. 40' x 40' Solids Storage Pond |
1 |
$2,880 |
Yes |
12. Contingency |
a. 20% |
1 |
$160,000 |
Yes |
13. Startup Costs |
a. Startup Supplies; Chemicals, Nets Waders, etc. |
1 |
$32,000 |
|
13. |
b. Travel; Pickup Lease, Travel to Site, Gas and Oil. |
1 |
$8,000 |
|
14. Construction Management |
a. Construction Management, (15% of Construction Costs) |
1 |
$143,857 |
Yes |
14. |
b. Program Manager |
20 |
$63,000 |
|
This information was not provided on the original proposals, but was generated during the review process.