FY 2002 Columbia Plateau proposal 25015
Contents
Section 1. General administrative information
Section 2. Past accomplishments
Section 3. Relationships to other projects
Section 4. Budgets for planning/design phase
Section 5. Budgets for construction/implementation phase
Section 6. Budgets for operations/maintenance phase
Section 7. Budgets for monitoring/evaluation phase
Section 8. Budget summary
Reviews and Recommendations
Additional documents
Title | Type |
---|---|
25015 Narrative | Narrative |
Section 1. Administrative
Proposal title | Emergency Flow Augmentation for Buck Hollow |
Proposal ID | 25015 |
Organization | Wasco County Soil and Water Conservation District (Wasco SWCD) |
Proposal contact person or principal investigator | |
Name | Ron Graves |
Mailing address | 2325 River Road The Dalles, OR 97058 |
Phone / email | 5412966178 / ron-graves@or.nacdnet.org |
Manager authorizing this project | Wasco County SWCD Board of Directors |
Review cycle | Columbia Plateau |
Province / Subbasin | Columbia Plateau / Deschutes |
Short description | Augment stream flow in Buck Hollow Creek during 2001 with 1-1.5 cfs from headwater well |
Target species | Summer Steelhead |
Project location
Latitude | Longitude | Description |
---|---|---|
45.2582 | -121.0244 | Birch Creek watershed, main stem river mile 0.2 |
45.0291 | -120.6871 | Buck Hollow Watershed: Headwaters near Shaniko; approx. well location |
Reasonable and Prudent Alternatives (RPAs)
Sponsor-reported:
RPA |
---|
Relevant RPAs based on NMFS/BPA review:
Reviewing agency | Action # | BiOp Agency | Description |
---|---|---|---|
NMFS | Action 149 | NMFS | BOR shall initiate programs in three priority subbasins (identified in the Basinwide Recovery Strategy) per year over 5 years, in coordination with NMFS, FWS, the states and others, to address all flow, passage, and screening problems in each subbasin over 10 years. The Corps shall implement demonstration projects to improve habitat in subbasins where water-diversion-related problems could cause take of listed species. Under the NWPPC program, BPA addresses passage, screening, and flow problems, where they are not the responsibility of others. BPA expects to expand on these measures in coordination with the NWPPC process to complement BOR actions described in the action above. |
Section 2. Past accomplishments
Year | Accomplishment |
---|---|
2000 | Completed two Oregon Watershed Enhancement Board Grants for Bakeoven Watershed Including 78,434 ft. fencing, 2 spring developments, 4 livestock wells, 3000 ft. pipeline, 2,225 acres brush control, 220 acres range improvement seeding, 30 sediment basins. |
2000 | Completed Buck Hollow Proj. Phase7a: Accomplishments to date include: 50.5 miles fence, 1255 ac. range seeding, 137400 ft. terraces, 152 sediment basins, 1240 ac. brush control, 5 livestock wells, 13 spring developments, 12490 ft. pipeline, and much more. |
2000 | White River Watershed: No-till/direct seed demonstration project on 900 acres implemented with DRC grant; Another 883 acres of conventionally tilled cropland was convered to no-till/direct seed with an OWEB grant. |
Section 3. Relationships to other projects
Project ID | Title | Description |
---|---|---|
Buck Hollow Watershed Project | supports on going effort to improve watershed health and improve steelhead populations by protecting brood of largest run observed in 40 years. |
Section 4. Budget for Planning and Design phase
Task-based budget
Objective | Task | Duration in FYs | Estimated 2002 cost | Subcontractor |
---|---|---|---|---|
1. Project coordination / management | a. Landowner agreement | .02 | $30 | |
b. Obtain limited license from OWRD | .02 | $130 | ||
c. Obtain permission for access from landowners | .02 | $120 | ||
d. Coordinate adaptive management strategies with supporting resource agencies | 0.4 | $1,800 | ||
e. Action to meet NEPA requirements | .08 | $1,000 | ||
f. Reporting and Documentation | 0.4 | $1,300 |
Outyear objectives-based budget
Objective | Starting FY | Ending FY | Estimated cost |
---|---|---|---|
$0 |
Outyear budgets for Planning and Design phase
Section 5. Budget for Construction and Implementation phase
Task-based budget
Objective | Task | Duration in FYs | Estimated 2002 cost | Subcontractor |
---|---|---|---|---|
2. Augment stream flow in Buck Hollow Creek | a. Operate existing 20 HP pump to provide 0.8 cfs | 0.2 | $1,600 | |
b. Upgrade pump at source will to 40 HP to provide 1.5 cfs (cost share 75/25% with landowner) | 0.01 | $5,825 | Yes | |
b (part 2) operate 40 HP pump to provide | 0.2 | $3,200 | ||
c. Reimburse landowner for opportunity cost associated with loss of alfalfa production due to transfer of water to instream use during growing season (5 tons/ac on 20 acres at $100 per ton) | .01 | $10,000 |
Outyear objectives-based budget
Objective | Starting FY | Ending FY | Estimated cost |
---|---|---|---|
$0 |
Outyear budgets for Construction and Implementation phase
Section 6. Budget for Operations and Maintenance phase
Task-based budget
Objective | Task | Duration in FYs | Estimated 2002 cost | Subcontractor |
---|---|---|---|---|
$0 |
Outyear objectives-based budget
Objective | Starting FY | Ending FY | Estimated cost |
---|---|---|---|
$0 |
Outyear budgets for Operations and Maintenance phase
Section 7. Budget for Monitoring and Evaluation phase
Task-based budget
Objective | Task | Duration in FYs | Estimated 2002 cost | Subcontractor |
---|---|---|---|---|
3. Monitor and evaluate stream flow and other environmental conditions | a. Install flow meter at well head | .01 | $1,200 | Yes |
b. Install staff gauges | .01 | $200 | ||
c. Install exiting HOBO Temps at 4 monitoring sites | .02 | $0 | ||
d. Obtain stream flow and other environmental data measurements at 2 headwater sites and mouth of Buck Hollow and Bakeoven (control) Creeks. | 0.4 | $1,981 | ||
e. Data graphing, trend analysis | 0.4 | $1,500 |
Outyear objectives-based budget
Objective | Starting FY | Ending FY | Estimated cost |
---|---|---|---|
$0 |
Outyear budgets for Monitoring and Evaluation phase
Section 8. Estimated budget summary
Itemized budget
Item | Note | FY 2002 cost |
---|---|---|
Personnel | FTE: .14 | $4,424 |
Fringe | 30% includes all OPE | $1,327 |
Supplies | staff gauge, cost shared pump, flow meter | $6,525 |
Indirect | admin overhead (3.5%)(normal rate is 10%) | $1,010 |
NEPA | Probable categorical exclusion | $1,000 |
Subcontractor | Pump, pipe, flow meter installation | $700 |
Subcontractor | REA Utility costs 3 mo. 20 HP (est) | $1,600 |
Subcontractor | REA Utility costs 3 mo 40 HP (est) | $3,200 |
Subcontractor | Limited license fee (Water Resources Dept.) | $100 |
Other | Lost alfalfa production reimbursement (not to exceed amount) | $10,000 |
$29,886 |
Total estimated budget
Total FY 2002 cost | $29,886 |
Amount anticipated from previously committed BPA funds | $0 |
Total FY 2002 budget request | $29,886 |
FY 2002 forecast from 2001 | $0 |
% change from forecast | 0.0% |
Reason for change in estimated budget
n/a
Reason for change in scope
n/a
Cost sharing
Organization | Item or service provided | Amount | Cash or in-kind |
---|---|---|---|
Oregon Water Resources Dept. | Assistance with staff gauge installation and periodic monitoring, conversion table for staff gauge readings | $1,000 | in-kind |
Landowner | Cost share 40HP pump, flow meter, installation costs | $2,340 | cash |
Wasco SWCD | Administrative costs | $1,876 | in-kind |
Landowner | Monitoring pump operation 2 hrs./week @ $20/hr+ 60 miles/wk @$0.30 x 21 weeks | $1,218 | in-kind |
Reviews and recommendations
This information was not provided on the original proposals, but was generated during the review process.
Fundable - no response required
Jun 15, 2001
Comment:
Fundable. This project is time critical for summer 2001. The project will address a limiting factor that presents a critical and immediate need to protect steelhead redds. It is a needed project, with good justification and a very low budget. Implementing the project should also create additional good will with a cooperative local landowner.
Modest cost of $30K with cost share to reimburse landowner for direct out of pocket costs for short term 1-1.5 cfs from private irrigation well near headwaters beginning ASAP. Dry conditions elsewhere are apparently forcing fish into Buck Hollow and Bakeoven. Late season flows at mouth have exceeded minimum goal of 5 cfs. Efforts to protect the water have apparently been researched by Oregon Water Resources Department personnel. Flows and temperature would be monitored. The monitoring should be coordinated with project #25010 from ODEQ?
Bakeoven Creek (also with record run of steelhead) is a control with no augmentation.
Comment:
Fundable. This project is time critical for summer 2001. The project will address a limiting factor that presents a critical and immediate need to protect steelhead redds. It is a needed project, with good justification and a very low budget. Implementing the project should also create additional good will with a cooperative local landowner.Modest cost of $30K with cost share to reimburse landowner for direct out of pocket costs for short term 1-1.5 cfs from private irrigation well near headwaters beginning immediately. Dry conditions elsewhere are apparently forcing fish into Buck Hollow and Bakeoven. Late season flows at mouth have exceeded minimum goal of 5 cfs. Efforts to protect the water have apparently been researched by Oregon Water Resources Department personnel. Flows and temperature would be monitored. The monitoring should be coordinated with project #25010 from ODEQ? Bakeoven Creek (also with record run of steelhead) is a control with no augmentation.
Comment:
Statement of Potential Biological Benefit to ESUProject will augment stream flow in Buck Hollow Creek during 2001 with 1-1.5 cfs from headwater well to protect steelhead redds.
Comments
Project is time critical for summer 2001. Funded under emergency offset BIOP.
Already ESA Req? no
Biop? yes
Comment:
This project was funded in 2001 as part of BPA’s Action Plan solicitation, project no. 2001-054-00 ($22,800). It appears that the SWCD may be proposing this flow enhancement for 2002. If the project was successful in 2001 and water is again short in 2002, BPA would likely fund this effort a second time. If funded in 2002, costs for stream gauging can be eliminated, as these would be obtained in proposal no. 25075. Buck Hollow and Bakeoven Creeks contribute 40 percent of the warm water adapted wild steelhead in the Deschutes River sub-basin.Comment: